| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC CAMP AT GORUBANDHA MISSAMARI ASSAM 784506 | SONITPUR | ASSAM | 784506 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹22.7 L+₹1.9 L (8.89%)Rejected-Finance AMBAGAN TEZPUR TOWN PO PS TEZPUR DIST SONITPUR ASSAM | SONITPUR | ASSAM | 784001 | L2 | Rejected-Finance NOT BEING LOWEST |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
23 Nov 2020, 6:00 pmClosed
GE MISAMARI
PO-Missamari Dist-Sonitpur Assam
REPAIR/ MAINTENANCE OF DG SET INCL REPAIRS TO INCINERATOR UNDER GE MISAMARI
2020_MES_391260_1
8139
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE MISAMARI
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹500
Yes
GE MISAMARI
₹40,000
Yes
4 Dec 2020
30 Oct 2020
25 Nov 2020
30 Oct 2020
23 Nov 2020
10 Nov 2020
30 Oct 2020 - 5 Nov 2020
Amount
M&L for Servicing to DG set of capacity 400 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UAV troop complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 320 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UH-ALH troop complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 250 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UH-ALH troop and AF Station complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 200 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at JK-03 Nos, AF PUMP HOUSE, UAV, GP-II PH & 6679 Maint Flt complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 125 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Old PH, Rekhamari PH & 33 KV MRS Station complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 100 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 180 MH, Lama Camp PH & Trolly Mounted DG complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 82.50 KVA (02 Nos) with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UAV-(CCR) troop and AF Net(02 Nos),Shivaji Nagar St light, complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 63 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at STP complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 62.50 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at OMC, Engr. Regt., AF Guard room and Div Guard Room complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 45 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Sewage PH IMPH complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 40 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 15 Mobile complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 35 KVA (06 Nos.) with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UAV Troop complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 30 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Signal centre & 71 DOU complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 25 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at CCR Sub Stn complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 20.00 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Zonal Wksp complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 15 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at AF station perimeter security lights complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter- 01 (vi) Cleaning of fuel tank-01 (vii) Tapping adjustment and calibration- 01 (viii) Tighting of all nuts, bolts, screws, and loose part of DG set- 01
M&L for Servicing to DG set of capacity 7.50 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed of the following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Immoles (02 Nos.), Perimeter Security Lights,Stn HQ complete all as specified and as directed. (i) Fuel filter (Primary & Secondary) - 01 Set. (ii) Spin –on filter for lubricant - 01 No. (iii) Engine oil as per manufacture specifications. (iv) Coolent as per manufacture specifications. (v) Air filter - 01 set (vi) Cleaning of fuel tank - 01 Job (vii) Tapping adjustment and calibration- 01 job (viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job
M&L Battery leads complete with terminal and lugs (set of three Nos) including removal of existing unserviceable one complete all as specified and as directed.
M&L Battery leads complete with terminal and lugs (set of two Nos) including removal of existing unserviceable one complete all as specified and as directed.
M&L for Fan Belt complete suitable for 400/320 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for 250/200 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for 125/100 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for 82.50 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 63.00/62.50 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 45/42.50 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 35/32.50 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 30.00 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 25/20 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Fan Belt complete suitable for capacity 15/12.50/7.50 KVA DG Set including removal of existing unserviceable Fan Belt complete all as specified and as directed.
M&L for Radiator Fan Blade complete suitable for capacity 7.5 to 82.5KVA DG Set including removal of existing unserviceable Fan Blade complete all as specified and as directed.
M&L for Radiator Fan Blade complete suitable for capacity 125 to 400 KVA DG Set including removal of existing unserviceable Fan Blade complete all as specified and as directed.
M&L for disconnecting all electrical connections from DG set Alternator of any capacity from base plate by opening nuts & bolts keeping aside the Alternator for inspection and taking out to the work shop for rewinding including testing & commissioning complete all as specified and as directed.
Rewinding of 7.50 KVA to 15.00 KVA Alternator field coil with super enamelled copper winding wire of class 'F' insullation as per existing size and gauge including heating, varnishing and testing complete all as specified and as directed.
Rewinding of 20 KVA to 40 KVA Alternator field coil with super enamelled copper winding wire of class 'F' insullation as per existing size and gauge including heating, varnishing and testing complete all as specified and as directed.
Rewinding of 62.50 KVA to 82.50 KVA Alternator field coil with super enamelled copper winding wire of class 'F' insullation as per existing size and gauge including heating, varnishing and testing complete all as specified and as directed.
Rewinding of 100 KVA to 125 KVA Alternator field coil with super enamelled copper winding wire of class 'F' insullation as per existing size and gauge including heating, varnishing and testing complete all as specified and as directed.
M&L for Self Starter Assembly 24 volts complete suitable for 100 KVA to 400 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for Self Starter Assembly 12 volts complete suitable for 7.5 KVA to 82.5 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for DC Alternator Assembly 24 volts suitable for 100 KVA to 400 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for DC Alternator Assembly 12 volts suitable for 7.5 KVA to 82.5 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for Electronic Speed Control unit assembly 24 volts suitable for 100 KVA to 400 KVA including heating, varnishing and testing complete all as specified and as directed.
M&L for SMPS (system main power supply) type control unit assembly suitable for 24 volts battery charger for including removal of existing unserviceable one complete all as specified and as directed.
M&L for SMPS (system main power supply) type control unit assembly suitable for 12 volts battery charger for including removal of existing unserviceable one complete all as specified and as directed.
M&L for AVR (Automatic Voltage Regulator) control unit assembly suitable for 7.5 KVA to 82.5 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for AVR (Automatic Voltage Regulator) control unit assembly suitable for 100 KVA to 400 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for battery teriminals including removal of existing unserviceable one complete all as specified and as directed.
M&L for canopy hinges for acoustic doors with suitable bolts and nuts of DG set including removal of existing unserviceable one complete all as specified and as directed.
M&L for Radiator hose pipe with suitable clamps of DG set including removal of existing unserviceable one complete all as specified and as directed.
M&L for solinoid switch assembly 24 volts suitable for 100 KVA to 400 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for solinoid switch assembly 12 volts suitable for 7.5 KVA to 82.5 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for Anti vibration pads with suitable bolts and washers including removal of existing unserviceable one complete all as specified and as directed.
M&L for Asbestos Rope including removal of existing unserviceable one complete all as specified and as directed.
M&L water pump assembly suitable for 7.5KVA to 63KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L water pump assembly suitable for 82.5KVA to 125KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L water pump assembly suitable for 200KVA to 400 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L Feed pump suitable for 7.5KVA to 63KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L Feed pump suitable for suitable for 82.5KVA to 125KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L Electronic Type Starting Switch for 7.5KVA to 15KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L Electronic Type Starting Switch e for 30 KVA to 125 KVA including removal of existing unserviceable one complete all as specified and as directed.
M&L for Servicing to oil fired incenerator of capacity 50 Kg/Hr with and including replacement of the worn out spares and cleaning nozzles of fuel injection, wet scrubber, proplet seperator with kerosene oil, ID fan blower including cleaning of Primary chamber, secondary chamber with replacement of unserviceable fire bricks if required, overhaling the motors, pumpsets and testing for smooth running complete all as per manufacturer’s specifications and as directed installed at 15 MOB complete all as specified and as directed.
S&F Digital temperature indicating controller to read upto temperature 1200 degree centrigate with 2 set points including removal of existing unserviceable one in the control panel installed at 15 mobile Vetenary hospital and 180 MH, complete all as specified and as directed.
M&L for primary burner as per existing installed at incenerator , complete all as specified and as directed. Make:- Ecoflame or equivalent
M&L for secondary burner as per existing installed at incenerator , complete all as specified and as directed. Make:- Ecogflame or equivalent
M&L for Ignition transformer 230 V 15 A, 50/60 Hz as per existing installed at incenerator, complete all as specified and as directed. Make:- FIDA TREVISO ITALY or equivalent.
M&L for taking out unserviceable radiator from existing DG set of capacity 200 KVA to 400 KVA for servicing and cleaning by using chemical solution for removal of scaling/foreign material from water fins (tubes) through authorized dealer including checking and repair/replacement of water circulating pumps, thermostat, radiator cooling fan, all types of belts including soldring of damaged radiator fins and hose pipes for smooth functioning, complete all as specified and as directed.
M&L for taking out unserviceable radiator from existing DG set of capacity 62.5 KVA to 125 KVA for servicing and cleaning by using chemical solution for removal of scaling/foreign materil from water fins (tubes) through authorized dealer including checking and repair/replacement of water circulating pumps, thermostat, radiator cooling fan, all types of belts including soldring of damaged radiator fins and hose pipes for smooth functioning, complete all as specified and as directed.
M&L for taking out unserviceable radiator from existing DG set of capacity 7.5 KVA to 45 KVA for servicing and cleaning by using chemical solution for removal of scaling/foreign materil from water fins (tubes) through authorized dealer including checking and repair/replacement of water circulating pumps, thermostat, radiator cooling fan, all types of belts including soldring of damaged radiator fins and hose pipes for smooth functioning, complete all as specified and as directed.
M&L for taking out all injector (by using right tools means torque wrench ) from DG set 200 KVA to 400 KVA for servicing through authorised dealer and refixing its original position after repairing including replacement of plunger, washer, jets and any internal parts of injector, complete all as specified and as directed.
M&L for taking out all injector (by using right tools means torque wrench ) from DG set 62.5 KVA to 125 KVA for servicing through authorised dealer and refixing its original position after repairing including replacement of plunger, washer, jets and any internal parts of injector, complete all as specified and as directed.
M&L for taking out all injector (by using right tools means torque wrench ) from DG set 7.5 KVA to 45 KVA for servicing through authorised dealar and refixing its original position after repairing including replacement of plunger, washer, jets and any internal parts of injector, complete all as specified and as directed.
M/S S.S.Corporation
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .