Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
19 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
BRIDGE/ADI
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (CS No-1, Dt:14.07.22)
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each cost not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Similar nature work : Fabrication and Erection of Steel Girders OR Fabrication & Erection of Steel pathway on track bridges / Trolley refugees on track bridges / Inspection platform on track bridges.
5 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Partnership deeds, Power of attorney, JV, LLP etc., as per clause No. 14 (i) to (vi) and 15 of GCC Part-I corrected up to date. (As per GCC , Para 14(i) to (vi).Tenderer should mention the status of firm as Sole Proprietor, Partnership firm, JV, Registered company, LLP etc. and attached all documents pertains to status of firm i.e Partnership deed, Power of attorney, Resolution of Board of Director's etc. as applicable.
Ahmedabad Division : Replacement of existing old side pathway at Bridge No-733 & major strengthening the steel girders in ADI-VG, VG-KOD & SBT-GNC Section under the jurisdiction in Sr. Section Engineer (Bridge) Ahmedabad.
DYCE-BR-ADI-01-2026-27
DYCE-BR-ADI-01-2026-27
Open
Works - General
12 Months
Ahmedabad, Gujarat
₹0
₹3.9 L
19 May 2026
22 Apr 2026
5 May 2026
5 items across 1 schedule · ₹3,54,984.6 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 5km | Tonne | 60 232.31 | — | 13,938.6 |
| 2 | Beyond 10 km upto 20 km per km | tonne- Km | 600 | 13.41 | 8,046 |
| 3 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge. | Kg | 60000 | 3.85 | 2,31,000 |
| 4 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres | kg per metre span | 60000 | 0.85 | 51,000 |
| 5 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres. | kg per metre height | 60000 | 0.85 | 51,000 |
| Schedule total | ₹3,54,984.6 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS-1toGCC-2022.pdf
ATTACHMENT
ACS-2toGCC-2022.pdf
ATTACHMENT
ACS-3toGCC-2022.pdf
ATTACHMENT
ACS-4toGCC-2022.pdf
ATTACHMENT
ACS-5toGCC-2022.pdf
ATTACHMENT
ACS-6toGCC-2022.pdf
ATTACHMENT
BANKDETAILSFORM1.pdf
ATTACHMENT
ACS-7toGCC-2022.pdf
ATTACHMENT
GCCACSNO8.pdf
ATTACHMENT
GCCCSNO.9.pdf
ATTACHMENT
GCCCorrectionslipno.10.pdf
ATTACHMENT
ACS11.pdf
ATTACHMENT
Tender Document
ATTACHMENT
ACS CE I
ATTACHMENT
2024-CE-I-CAOCWorkshop-part-2_1.pdf
ATTACHMENT
TD-01-2026-27_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .