| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance NEAR SBI TAKULA ROAD DISTT BAGESHWAR | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹22.0 L (12.7%)Admitted-Finance | ₹2.0 Cr+₹22.0 L (12.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical bidder disqualify |
| 4 | Rejected-Technical | - | - | Rejected-Technical bidder disqualify |
| Sl No | Description | Qty | Unit | parihar construction L1 | M S Associates L2 |
|---|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | |||||
| 1.00 | WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. By Mechanical Means | 202.5 | Cum | 1,700 ₹3,44,250 Lowest | 1,771.49 ₹3,58,726.72 |
| 2.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer in- charge. (As per PWD Uttarakhand specifications) | 216 | Cum | 1,150 ₹2,48,400 Lowest | 1,300.67 ₹2,80,944.72 |
| 3.00C/O of R/Wall & B/Wall | |||||
| 3.10 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction FOR R/W and B/W | 1,208.68 | Cum | 310 ₹3,74,690.8 Lowest | 338.5 ₹4,09,138.18 |
| 3.20 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 720.04 | Cum | 3,000 ₹21,60,120 Lowest | 3,323.49 ₹23,93,045.74 |
| 3.30 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 2,050.73 | Cum | 1,700 ₹34,86,241 Lowest | 1,925.44 ₹39,48,557.57 |
| 3.40 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 38.85 | Cum | 700 ₹27,195 Lowest | 896.24 ₹34,818.92 |
| 4.00 | Construction of Surface Drain (katcha Drain) AS per attach analysis sheet | 4,500 | Rmt | 35 ₹1,57,500 Lowest | 39.47 ₹1,77,615 |
| 5.00Making puccaa drain along the hill side of road in all type of soil and rocks including supply of all materials , labour , T&P, and royalties etc. required for proper completion of work. | |||||
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
22 May 2023, 1:00 pmClosed
Superintending Engineer
Superintending Engineer 1st Circle PWD Almora
C.M. Ghoshna No 656/2015 from Km 10 of Khadak - Bhanar Motor road to Dharamghar Majkhet Ghuradiya Bend Motor road in kapkot Constituency district Bageshwar Under State Sector
2023_pwd_57632_1
1613/Nivida-01/2022-23 dated 10/04/2023
Open Tender
Civil Works
Item Rate
455 days
Kapkot
As per technical bid
2 documents required · 2 mandatory
₹5,900
EE CD PWD Kapkot
₹5.4 L
Almora
11 Sept 2023
19 Apr 2023
22 May 2023
19 Apr 2023
22 May 2023
9 May 2023
6 May 2023
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. By Mechanical Means
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer in- charge. (As per PWD Uttarakhand specifications)
C/O of R/Wall & B/Wall
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction FOR R/W and B/W
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Construction of Surface Drain (katcha Drain) AS per attach analysis sheet
Making puccaa drain along the hill side of road in all type of soil and rocks including supply of all materials , labour , T&P, and royalties etc. required for proper completion of work.
Excavation in foundation for retaining walls, scuppers & simillar works etc, in all types of soils and rocks including lead ( up to 50m), lift ( uo to 1.50m) and disposal of surplus material as per direction of engineer-in charge.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 .
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 .
C/O 1 m span scupper with CC base . Construction of 1 m span scupper of RR 1: 6 abutment ,RCC slab as per attached drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MOR
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 .
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. Random rubble masonry In cement mortar (1:5).
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) R.C.C grade M 25
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers as per cla
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix Nominal mix (1:2.5:5) M 15
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Construction Of Causeway
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Cement plum Concrete with 40% plum & 60% 1:2:4 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Maintence of the road during construction and reconstruction of damage village paths during cutting. (2.50 Lac Per Km)
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Constructions of parapats on outer side of sharp curve and both side of scupper in cement plum masonary with 40% plum and 60% 1:2:4 cement concrete including necessary earth work, supply of material,labour, T&p as required for proper completion work.
Excavation in foundation for Parapet in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 .
Constructions of parapats on outer side of sharp curve and both side of scupper in cement plum masonary with 40% plum and 60% 1:2:4 cement concrete including necessary earth work, supply of material,labour, T&p as required for proper completion work.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4.
Loose Stone
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
5th Kilometer stone (Precast)
Ordinory kilometer stone (Precast)
200 m stone (precast)
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron.
800 mm x 600 mm rectangular
600 mm x 450 mm rectangular
Providing edge stones of Size 450x350x100 mm on valley side of formation as per drawing and technical specification clause 1608.2.6
M S Associates
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.16 MB
dharmgharmajkhet.pdf
Tender Documents • 2.47 MB
BOQ_70344.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .