| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC Lowest Quoted |
| 2 | L2₹2.8 LRejected-Finance VADOORKONAM | IDUKKI | KERALA | 685533 | ₹2.8 L | L2 | Rejected-Finance 2nd lowest quoted |
| 3 | L3₹2.9 LRejected-Finance PAZHUKKADU PUTHENVEEDU AYIRA AYIRA P O | ERNAKULAM | KERALA | 680667 | ₹2.9 L | L3 | Rejected-Finance Highest quoted |
| Sl No | Description | Qty | Unit | SURESH BABU C L1 | JUSTIN JOSE L2 | REJI C L3 |
|---|---|---|---|---|---|---|
| 1.00Renovation of Pond | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 82.5 | sqm | 15.04 ₹1,240.80 | 16.22 ₹1,338.15 | 16.96 ₹1,399.20 |
| 1.00 | OD39664/2024-2025:Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the thodu by mechanical means or manual means with all lead and lift including disposal of the removed earth,silt,clay,mud etc , complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu, and convenyance /carriage charge for rubbish/silt collected from site to contractors own dumping area as without causing damages to enivornment or society(Soil test were conducted for desilted waste/sludge in government lab wheather in test if report comes like soil can be used for any masonry or construction purpose then desilted soil will be auctioned and department quoted amount will be collected from contractor) | 90 | cum | 301.01 ₹27,090.90 | 324.62 ₹29,215.80 | 339.37 ₹30,543.30 |
| 1.00 | OD31707/2024-2025:Putting up ring bund and bailing out water during the course of construction by engaging man coolies and
removing the bund after the completion of work as directed by the departmental officers at site | 16 | each | 896.36 ₹14,341.76 | 966.66 ₹15,466.56 | 1,010.6 ₹16,169.60 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 16 | hour | 387.28 ₹6,196.48 | 417.65 ₹6,682.40 | 436.64 ₹6,986.24 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.2 | cum | 627.46 ₹2,635.33 | 676.67 ₹2,842.01 | 707.43 ₹2,971.21 |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.94 | cum | 1,500.03 ₹4,410.09 | 1,617.68 ₹4,755.98 | 1,691.21 ₹4,972.16 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 11.97 | cum | 218.31 ₹2,613.17 | 235.43 ₹2,818.10 | 246.13 ₹2,946.18 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 9.03 | cum | 3,561.29 ₹32,158.45 | 3,840.61 ₹34,680.71 | 4,015.19 ₹36,257.17 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 12.27 | cum | 9,066.17 ₹1.1 L | 9,777.25 ₹1.2 L | 10,221.67 ₹1.3 L |
Tender Value
₹2.5 L
EMD Value
₹6,341
Closing Date
8 Apr 2025, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Sub Division Opposite Museum Police station Observatory Hills Thiruvananthapuram 695033
Construction of side protection wall at Pattam thodu in Mullasseri ward of Thiruvananthapuram corporation
2025_Irrig_756301_1
25/AEEMI/TVM/2024-25
Open Tender
Civil Works - Water Works
180 days
mullasseri ward Thiruvananthapuram corporation
Please refer Tender documents.
6 documents required · 6 mandatory
₹560
Yes
₹6,341
Yes
8 Jan 2026
28 Mar 2025
9 Apr 2025
28 Mar 2025
8 Apr 2025
28 Mar 2025
28 Mar 2025 - 8 Apr 2025
Amount
Renovation of Pond
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD39664/2024-2025:Excavation for removal of accumulated or deposited silt ,clay,mud etc in or under water from the thodu by mechanical means or manual means with all lead and lift including disposal of the removed earth,silt,clay,mud etc , complete as per the directions of the Engineer in charge for fulfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu, and convenyance /carriage charge for rubbish/silt collected from site to contractors own dumping area as without causing damages to enivornment or society(Soil test were conducted for desilted waste/sludge in government lab wheather in test if report comes like soil can be used for any masonry or construction purpose then desilted soil will be auctioned and department quoted amount will be collected from contractor)
OD31707/2024-2025:Putting up ring bund and bailing out water during the course of construction by engaging man coolies and removing the bund after the completion of work as directed by the departmental officers at site
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
JUSTIN JOSE (BID ID -2190084)
REJI C (BID ID -2190164)
Bidder Name
SURESH BABU C
JUSTIN JOSE
REJI C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1228267.pdf