| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹4.9 L (2.13%)Rejected-AOC | ₹2.3 Cr+₹4.9 L (2.13%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.7 Cr+₹39.2 L (17.1%)Rejected-AOC | ₹2.7 Cr+₹39.2 L (17.1%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical ARACKAL HOUSE VARAPPETTY KOTHAMANGALAM | IDUKKI | KERALA | 685501 | - | - | Rejected-Technical L5 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L6 |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
22 Jun 2021, 4:00 pmClosed
SE PWD Roads CC Aluva
O/O SE PWD Roads CC Aluva
formation works protection works road tarring works
2021_PWD_425743_1
02/SECCA/2021-22
Open Tender
Civil Works - Roads
Item Rate
270 days
kallar lakshmi
Please refer Tender documents.
9 documents required · 9 mandatory
₹9,759
Yes
₹1 L
Yes
3 Sept 2021
10 Jun 2021
25 Jun 2021
10 Jun 2021
22 Jun 2021
10 Jun 2021
Amount
Formation work & protection work
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.A : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> PCC Grade M15 - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m
13.5.E.P.1 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications<br> RCC Grade M20 - Using concrete Mixer - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
3.32 : Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.
3.33 : Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.
od44149/2018_2019 : Dry rubble masonry for foundation and superstructure of retaining wall
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
Metalling & tarring
4.2.A.2 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. <br> Grading-IV - For lower sub base - Mix in Place Method <br>Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub base - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
55.1.a : Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. <br> By Manual Means.Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
M/S V J RAJU AND CO
BABU K S
Mony V Athukuzhy
Binu A.S
M M Kunju Muhammed
Bidder Name
Binu A.S
M/S V J RAJU AND CO
Mony V Athukuzhy
M M Kunju Muhammed
BABU K S
MANESH JACOB
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_604178.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .