Loading…
Loading…
Tender ID
Tender Value
₹33.0 L
EMD Value
₹98,928
Closing Date
2 Apr 2026, 6:00 pmClosed
CHIEF ENGINEER (G)
Providing Service on job work for cement used repairing item, for carpentry work & plumbing work for civil colony at Gandhinagar TPS
284424
EW-266
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹2,950
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹98,928
13 Mar 2026
13 Mar 2026
13 Mar 2026
2 Apr 2026
13 Mar 2026
Name of Work: “Providing Service on job work for cement used repairing
item, for carpentry work & plumbing work for civil colony
at Gandhinagar TPS.”
AT GSECL Gandhinagar TPS
EW- 266 PUR-F-006 RFQ-
NAME OF WORK:“ Providing Service on job work for cement used repairing item, for
carpentry work & plumbing work for civil colony at Gandhinagar
DESCRIPTION PAGE NO.
ACKNOWLEDGEMENT OF TENDER FEE /EMD. 3 To
TENDER NOTICE.
DECLARATION FORM CUM UNDER TAKING TO BE SIGNED
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE TENDERER
GENERAL CONDITIONS OF CONTRACT
TERMS AND CONTRACT FOR WORKS 60 to
GENERAL SAFETY RULES & LIST OF SAFETY TOOLS
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT 69 To
CERTIFICATE – A
ANNEXURE – I (DETAILS OF BANK FOR SOLVEANCY & BG)
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF 76 To
GENERAL GUIDELINES RELEVANT TO I.S.
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAIL SPECIFICATION
SCHEDULE-B 91 To
Safe Maintenance Procedure
EW- 266 PUR-F-006 RFQ-
ACKNOWLEDGEMENT OF TENDER FEE /EMD
TENDER NOTICE
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
e- Tender for the
“Providing Service on job work for cement used repairing item, for carpentry work &
plumbing work for civil colony at Gandhinagar TPS..”
TENDER FEE PAID VIDE DEMAND DRAFT NO. _________________________________
EARNEST MONEY DEPOSIT PAID VIDE D.D. NO. _______________________________
1. The undersigned reserves the right to reject any or all tenders without
assigning any reasons thereof.
2. The Tender fee will be accepted in form of Demand Draft and Earnest Money
Deposit will be accepted in form of Demand Draft or Bank Guarantee of any bank as
prescribe in ANNEXURE- I drawn in favour of “GUJARAT STATE ELECTRICITY
CORPORATION LTD.” payable at Gandhinagar TPS
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Tender Notice No: GSECL/___/ __/ For Civil works
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the work of
“Providing Service on job work for cement used repairing item, for carpentry
work & plumbing work for civil colony at Gandhinagar TPS..” Tender Papers &
Specifications may be down loaded from Web site https://gsecl.nprocure.com(For view, down
load and on line submission) and GUVNL / GSECL web sites www.gsecl.in (For view only).All
tender documents are to be upload (Notarized / self-attested copies of original – as specified in tender
document) through online only (mandatory) on (n) procure portal excluding Tender fee and EMD Tender
fee and EMD are to be submitted physically by Registered Post A.D. or Speed Post addressed to: CHIEF
ENGINEER (GENERATION), GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL
POWER STATION, GANDHINAGAR-382041, GUJARAT. “NO COURIER SERVICE OR HAND
DELIVERY” will be accepted.
Name of Work Estimated amount Time Limit Fee Rs.+ G.S.T
EW- “Providing Service Rs. 32,97,600.00 11 Months Rs. 2500+ 450 = Rs.
266 on job work for (In words: Months from Rs. 2950/-(Two (Rupees ninety
cement used Rupees thirty two the date of Thousand Nine eight thousand
Hundred Fifty nine hundred
repairing item, for Lac ninety seven written order to
(Non Refundable) twenty eight
carpentry work & Thousand six commence the Only.)
plumbing work for hundred only.) work.
civil colony at
Gandhinagar TPS..”
180 Days [From the opening of
1 Validity of Tender
Technical Bid].
Last Date for Online tender / offer submission through
2 As per Tender Notice
(n)Procure only up to 18:00 Hrs(This is Mandatory)
Last Date for physical receipt of cover for DD / Bank Guarantee
3 / Online payment reference for Tender Fee and EMD only up to As per Tender Notice
15:00 Hrs Through RPAD or Speed Post Only
Date of opening of online Technical Bid, all relevant documents
submitted through online process, Cover for Tender fee and
4 As per Tender Notice
EMD at 15:30 Hrs (Online technical bid will be opened for
Bidders who have submitted Cover for Tender Fee and EMD)
Tentative date of on-line opening of price bid (if possible) at Party has to be in touch with
15.30 hrs. website www.nprocure.com and
also with e-mail sent by above
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
1) Only following listed documents must be upload in n-process online only. No physical documents are to be
submitted except tender fee and EMD cover. Price Bid shall not be submitted in Hard copy.
1. Demand Draft for Tender Fee and EMD (Original) cover only to submit through RPAD/Speed post only.
2. The bidder shall have a separate Provident Fund Code of RPFC in the name of company. The bidder, who
does not possess such separate P.F. code, shall not be considered for acceptance of tender. The
contractor has to submit attested copy of such certificate showing P.F. code along with the tender.
3. Attested copy of PAN No.
4. Attested copy of work experience certificate for the similar works executed.
5. List of work in progress.
6. Attested copy of firm registration [Applicable only to the firms registered under Company Law]
7. Attested copy of partnership deed. [Applicable only to the partnership firms.]
8. Attested copy of power of attorney, if any, for signing the bid document.
9. Attested copy of balance sheet of profit & Loss account duly audited by Chartered Accountant of at least
3 financial years, if work estimate is more than Rs. 50 Lacks.
10. Attested copy of latest solvency certificate not older than 12 months issued by any nationalized bank OR
Banks as per Annexure – I.
11. Details of equipment, tools and plants immediately available with the tenderer for use of this work.
12. Details of technical personnel.
13. Undertaking duly Notarized as per attached Declaration Form
14. Any other documents required to verify technical, financial capability of the bidders & other Credentials
15. Attached The Copy Of GST Registration.
All such documents should be strictly uploaded in N-procure only expect Tender Fee and EMD details
cover. Otherwise the offer will not be considered and no any further communication in the matter will be
2) In case any deviation is found in Data / Details / Documents uploaded on N-procure online offer (e-
tendering) documents then such tender will not be considered and no any further communication in the
matter will be entertained. Tenders must be un-conditional. Conditional Tenders will be rejected.
3) Further bidders are requested to submit Technical Bid documents and price – bid i.e. Schedule-B on line
only and not to submit the Technical bid and price bid in physical form expect Tender Fee and EMD
details cover. This is mandatory. If Technical bid document and price bid is submitted in physical form
expect Tender Fee and EMD details cover, same will not be opened and only on-line Uploaded/submitted
Technical bid document and price will be considered for evaluation. The bidder is requested not to
upload/submit the by online (n)procure while bid submission on in (n)procure tender
document, condition of the contract, specification & other relevant documents, except
documents as stated here above. Instead of the same, the bidder shall upload on (n) procure scan
copy of the duly Notarized Undertaking as stated below declaration form on the stamp paper of Rs. 300/-.
However, bidder may download tender document & preserve with them in Hard Copy for
their future reference. Later on, L1 bidder shall be asked to collect the tender documents
from the tender inviting authorities for the purpose of contract agreement execution and
place their signature with seal of the company.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) and
uploading on (n) procure in scheduled time. Tender documents submitted in physical form will not be
accepted and considered expect Tender Fee and EMD details cover. Also, all bidders shall submit required
Physical documents as stated in Tender Notice
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers of containing the Tender
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an Officer
nominated by the Purchaser in the presence of such of the bidders who wish to be present. Any technical
questions, information and clarifications that may be required pertaining to this tender should be referred to the
CHIEF ENGINEER (GEN.) Gandhinagar TPS. Also during pre-bid meeting (if arranged) the same may please be
8) The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for the product
which they are manufacturing / service which they are providing and have Udyam registration
for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they are
manufacturing/service which they are providing and re-cognized by DPIIT under the Start-up
India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the tender,
from Gujarat Khadi Gramodyog Board or Khadi and Village Industries Commission(K.V.I.C)or
Commissioner of Cottage Industries.
EW- 266 PUR-F-006 RFQ-
4. Board/Corporations/PSUs of the Central/State Government for their own manufactured
5. State Government recognized organizations like(i) organizations for blinds, dumb and deaf,
disabled, mentally disabled persons;(ii)women's self-help group recognized by Gujarat
Livelihood Promotion Company; which participate directly in tendering process for the product
which they are manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering process as
Manufacturers or Service Providers, and holds a valid Udyam Registration, are eligible for
exemption from payment of Earnest Money Deposit (EMD).
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar categories
(i.e. other than Manufacturers/Service Providers) are not eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change in terms of
investment in plant and machinery or equipment or turnover or both, and consequent re-
classification, an enterprise shall continue to avail of all non-tax benefits of the category
(micro or small or medium) it was in before the re-classification, for a period of three years
from the date of such upward change.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
DECLARATION FORM CUM UNDER TAKING
TO BE SIGNED BY BIDDER
RTGS DETAILS OF BIDDER
PROJECT SYNOPSIS
SCOPE OF WORK AND SITE CONDITION
SPECIAL NOTE FOR PRE-QUALIFICATION
GENERAL INSTRUCTION TO THE BIDDER
EW- 266 PUR-F-006 RFQ-
(To be uploaded on (n) procure online process duly notarized on Rs. 300/- Non
– Judicial Stamp Paper)
DECLARATION FORM
Name of Work: “Providing Service on job work for cement used repairing item, for
carpentry work & plumbing work for civil colony at Gandhinagar TPS..”
Tender No/ RFQ No:
1. I/We hereby declare that I/We have carefully studied the entire tender placed on the
WEB site and conditions of contract, specifications and other documents of this work
mentioned in the tender and abide by the same. Also, I/We hereby agree to execute
the same accordingly.
2. I/We hereby abide to execute the contract agreement by downloading the copies of
the conditions of contract, specifications and other documents of this work of
otherwise I/we will get copy of the same from the office of the tender inviting
authority and the same will be acceptable to me/us.
3. I/We hereby accept and confirm that any dispute on this regard shall not be
entertained by the tender inviting authority.
4. I/We hereby declare that I/We have visited the work site and fully acquainted
myself/ourselves with the local situations regarding materials, labour and other
factors pertaining to the work before submitting the tender.
5. I/We hereby confirm that our offer is Un-conditional and without any technical &
commercial deviations.
6. Should this tender be accepted, I /We hereby agree to abide by to fulfill all the
terms-conditions and provision of the Tender and Contract for Works as applicable
and default thereof, to forfeit and to pay to the Gujarat State Electricity Corporation
Limited the sums of money due.
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely
forfeited to the Corporation, should I/ we do not execute / commence the work after
issuance of date of commencement by GSECL.
EW- 266 PUR-F-006 RFQ-
8. If, I fail to submit all required documents with application or tender copy ( in each
tender ) then my tender will be cancelled, which is binding to me.
9. If, full or part work will be given to me, it will be accepted to me with same terms,
rate & conditions.
10. I, ______ proprietor / owner / partner / Authorized Agent of M/s. ______ do hereby
also declare and undertake as under:
a) That in capacity of independent contractor for M/s. ______ (Sub-Contractor of
M/s. ______ ) worked as contractor at GSECL, ___________Thermal Power Station
for the nature of work of ______ against work Order No. ______ Dt. ______., I
have complied with the provisions of all laws as applicable. I have paid the wages
for the month/s of my contractual period which is / are not less than the minimum
rates as applicable, to all my employee/s and no other dues are payable to my
b) That I have covered all the eligible employee/s under the Employees’
Provident Funds and Miscellaneous Provisions Act, 1952 and deposited the
contributions under my PF Code No. ______, place: ______ for the month/s of my
contractual period and as such no amount towards contribution whatever is payable.
c) I further declare and undertake that in case any liability pertaining to any of
my worker, labour, employee/s is/are to be discharged by the principle employer i.e.
Gujarat State Electricity corporation Limited, ___________Thermal Power Station
due to my lapse, I undertake to reimburse the same or the principle employer is
authorized to deduct the same from my dues as payable.
d) I further declare and undertake the legal consequences which may arise in
future under the said work order awarded, and I bond myself to resolve the same at
the risk and cost of M/s. ______.
authorized signatory of M/s ______________________________________________
and their proprietor / any partner / any directors of the firm is not stop deal and / or
banned for business dealing and / or black listed by GUVNL and / or their any
subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well
as Government and / or Semi Government company / department.
Seal & Signature of the Bidder
Phone / Mobile/ Fax No. & Company’s Seal
EW- 266 PUR-F-006 RFQ-
e- Tender for the work of “Providing Service on job work for cement used repairing
item, for carpentry work & plumbing work for civil colony at Gandhinagar TPS..”
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct deposit of
payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of :-
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & address :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
EW- 266 PUR-F-006 RFQ-
Project Synopsis and Data
1) Location :- Gandhinagar Thermal power station
2) Purchaser :- GUJARAT STATE ELECTRICITY CORPORATION
3) Engineer :- Chief Engineer(Gen)
4) Site of Project :- Gandhinagar,Gujarat State
5) Nearest town :- Gandhinagar
6) Nearest Railway Station :- Gandhinagar Capital(Ahmedabad is situated at a
distance of about 30.00Km)
7) Nearest Port :-
8) Nearest Air Port :- Ahmedabad-20Km(Approx)
9) Access Road :-
10) Site Elevation from MSL :- RL 81.5 M(floor level)
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of daily Max. :- 35 C
Temperature ( In C)
2] Maximum dry bulb :- 45 C
Temperature ( In C)
3] Minimum dry bulb :- 8.6 C
Temperature ( In C)
1] Average annual rainfall (In :- 1000 to 1200mm
2] For 01 hour ( In mm) :- 75 to 100mm
3] For 24 hour ( In mm) :- 250mm
Wind velocity
1] Maximum wind velocity (In :-
2] Wind direction – N,NE & SW :-
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In %) :- 50 to 60%
2] Maximum humidity (In %) :- 98%
3] Minimum humidity (In %) :- 2%
4] Type of Atmosphere :- Dry
12) DESIGN DATA
Seismic Data :-
Zone :- Zone-III as per IS 1893-1975
Ambient temperature :-
Other Data :-
EW- 266 PUR-F-006 RFQ-
SCOPE OF WORK AND SITE CONDITIONS
The main scope of the work is Providing Service on job work for cement used repairing
item, for carpentry work & plumbing work for civil colony at Gandhinagar TPS..” The
item work shall be carried out as per item specification and as directed by E.I.C. includes all
required materials, tools, tackles, and required safety precautions for success completion of
Under the scope of this tender the agency has to carry out the subject work as per all items
of Schedule B and as per detail technical specifications items. The quantities taken under
individual items are very tentative. However the agency has to carry out the works as per
the Company’s requirements anywhere in Colony area & Dyke.
The agency has to carry out the works as per item & specifications of the tender by
providing all materials of best quality and of standard manufactures as the samples
approved by EIC and providing best workmanship through expert manpower.
The agency has to carry out the works as per the priority & schedule given by EIC time to
time even in on or off working hours of the office. The agency will take complete care and
will not damage any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security norms,
with all risks including scaffolding, strutting, shoring, etc up to any height irrespective of
quantum of the work.
Contractor has to make arrangement for workable site condition with the co operation of
departments of company and agencies, all necessary arrangement to get work permit is to
be made by contractor. Day to day cleaning is required after completion of job. The
removed materials and any other unwanted materials are to be transported and taken
away as instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The scope of work to be carried out by the Contractor shall also include Clearance of the
site, Disposal of debris etc as directed by EIC to complete the work.
The major works involvement generally mentioned as per schedule-B.
Civil maintenance work as per complaint and as & when required
- Repairing work using cementing item
- Plumbing work, carpentry work, welding work
- Sanitation work
- Site supervision for civil and maintenance related works.
- Material supply and work execution as per SOR.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
Registration in VMS System
Additional Note: Vendor gets to register in VMS System through vms.guvnl.com. For
registration following documents are required and mail to [email protected] and
[email protected]. After registration vendor have to upload the invoice in the VMS
system for smooth functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
EW- 266 PUR-F-006 RFQ-
SPECIAL NOTE FOR PRE-QUALIFICATION
Name of work: “Providing Service on job work for cement used repairing item, for
carpentry work & plumbing work for civil colony at Gandhinagar TPS..”
The tender documents are of two separate bids i.e. technical and price bids. Bidder is
requested to submit the technical bid with the following credentials for post-
1. Bidder should produce evidence of having experience of successfully completed of
similar works as defined hereunder, carried out in Central & State Government / Semi-
Government / GSECL / GETCO / DGVCL / MGVCL / UGVCL/PGVCL during the last
seven years ending last day of the month previous to the one in which tender is invited.
Bidder should submit self-attested copies of documentary evidence, preferably photo
copies of work completion certificate, certificate regarding works on hand progressing
satisfactorily along with certificate of amount of work done, work order with Schedule-B,
etc. from the respective department. The amount of work completed should be either of
the following:-
a. Three similar completed works each costing not less than the amount equal to
b. Two similar completed works each costing not less than the amount equal to
c. One similar completed works each costing not less than the amount equal to Rs.
2. Similar work means – General Civil maintenance / Construction work
2. Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less than Rs.
during the preceding three (3) financial years as one date of Techno-Commercial bid
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up share
capital as on the last day of the preceding financial year. In case the Bidder meets
the requirement of Net worth based on the strength of its Subsidiary (ies) and/or
Holding company and/or Subsidiaries of its Holding Companies wherever applicable,
the Net worth of the Bidder and its Subsidiary (ies) and/or Holding company and/or
Subsidiary (ies) of the Holding Company, in combined manner should not be less
than 100% of their total paid up share capital. However individually, their Net worth
should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are
individual net worth which shall not be less than 75 % of the respective paid up
share capitals and y1, y2, y3 are individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements on stand-
alone entity basis, the unaudited unconsolidated financial statements of the bidder
can be considered acceptable provided the bidder further furnishes the following
documents for substantiation of its qualification.
Copies of the unaudited unconsolidated financial statements of the bidder along
with copies of the Audited consolidated financial statements of its Holding
EW- 266 PUR-F-006 RFQ-
A Certificate from the CEO/CFO of the Holding Company, stating that the
unaudited unconsolidated financial statements form part of the Consolidated
Annual Report of the company.
4) In cases where audited results for the last preceding financial year as on the date of
techno-commercial bid opening are not available, the financial results certified by a
practicing Chartered Accountant shall be considered acceptable. In case, Bidder is
not able to submit the Certificate from practicing Chartered Accountant certifying its
financial parameters, the audited results of three consecutive financial years
preceding the last financial year shall be considered for evaluating the financial
parameters. Further, a Certificate would be required from the CEO/CFO, stating that
the Financial results of the Company are under audit as on the date of Techno-
commercial bid opening and the Certificate from the practicing Chartered Accountant
certifying the financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth Certificate in
support of Financial QR, duly certified and verified for authenticity from Independent
Statutory Auditor of their company / Practicing Charted Accountant/ C.A. Firms / TPIA
(Third-Party Inspection Agency ) empaneled approved by GSECL, along with copy of
Annual Audited Accounts of last three years.
Note for point No.1, 2, 3&4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning ascribed to
them as per Companies Act of India, in vogue.
Net worth means the sum total of the paid up share capital and free reserves. Free reserve
means all reserves credited out of the profits and share premium account but does not
include reserves credited out of the revaluation of the assets, write back of depreciation
provision and amalgamation. Further, any debit balance of Profit and Loss account and
miscellaneous expenses to the extent not adjusted or written off, if any, shall be reduced
from reserves and surplus.
3. To pay EMD in form of DD OR in form of B.G. given by bank as described in the
Annexure – I. All the bidders will be required to pay Tender Fees plus 18% GST and
EMD as mentioned in the Tender Document either in Demand Draft, Pay Order or Bank
Guarantee (only for EMD) in favour of Gujarat State Electricity Corporation Limited
payable at Gandhinagar, Gujarat.
4. Tender Fee: The tender fee shall be accompanied in the form of DD.
4. The Last three-year Audited Annual Accounts, Positive Net worth certificate, and
Average Annual Turnover certificate certified by charted accountant as Per Qualification
5. Separate employee’s provident fund code number towards registration of firm
with Regional P.F. Commissioner.
6. Attested copy of relevant document duly signed and sealed on each and every page
shall be submitted.
7. Declaration form in original duly notarized on stamp paper of Rs. 300/- (As referred in
8. Attach copy of GST Registration.
9. Bidder shall have to submit the PAN card No for Income Tax with documentary proof.
10. Details of the partnership deed.
11. Details of Tools, tackles, equipment and personals available with firm relevant to the
job/subject matter.
12. Copy of the updated valid labor contract license from the appropriate authorities and
EW- 266 PUR-F-006 RFQ-
updated workman group insurance policy covering labor engaged.
13. The tenderer shall have to produce the document of last three years annual account,
i.e. profit & loss account and balance sheet, if the estimated cost of tender is more
than 50 lakhs along with technical bid.
14. Details of skilled/semi-skilled persons presently employed by the contractor having
sufficient knowledge of similar jobs.
15. TPI should be mandatory to submit as per cl no.6 of Section B (i.e. General
Instruction to the bidders).
The above documents will be analyzed and after satisfaction, the price bid will be
opened. GSECL may verify the documents, experience certificates from authority who
have issued such certificates / details.
On opening of Technical Bid, if any required attested documents are missing in technical
bid submitted by the bidder, and tender inviting authority is in the opinion that in absence
of these documents sufficient competition is not possible, in that case to have fair
competition, the tender inviting authority may inform only once by Registered post
to bidder/bidders to submit the missing required documents within stipulated time
limit and failing which bidder/bidders will be declared technically disqualified for
not submitting the required documents along with technical bids without any
further notice. However, document will be considered valid only if it is for the period of
last day of month previous to the one in which tenders are invited.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
GENERAL INSTRUCTIONS TO THE BIDDERS
1. SUBMISSIOIN OF TENDER
The tender should be uploaded/ submitted online on n-procure process.
Technical bid cover:- This cover shall contain all relevant attested qualifying documents as
prescribed in tender notice along with tender fee & EMD. Bidder shall have submit Tender Fee and
EMD cover only, All other require document to be upload on online (n)procure process only
Note: - If attested copies of qualifying documents stated as prescribed in tender notice
are not found in on-line Technical bid, but same should be submitted by mail during
scrutiny will be treated as final to consider the bid for pre-qualification. Any missing
documents, if required will be asked from the bidder as mentioned in this tender
elsewhere. If party has not submitted tender in online is liable to be ignored.
“Please note that the Notarized / self-attested copies of original required documents
should be invariably uploaded in n-procure portal before due date and time in pdf form
(Scanned copy). This is mandatory. No physical documents are required to be
submitted except tender fee and EMD.
The price bid shall have to be submitted online only. The percentage rates and price shall be
written both in words, and figures and the units in words. In case of any ambiguity or mistakes, the
unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and lifts,
Supervision, setting out works, Machinery and equipment with its mobilization / demobilization,
transportation charges, Clearing of the site both prior to commencement and after completion of
work. Consumables such as, but not limited to petrol, oil, diesel, lubricants, drill bits, pipes, ropes
etc. Construction facilities such as scaffolding, tarpaulins, wind break, etc., Overheads / profits of
Contractor for due performance of the work under this contract.
Applicability of goods and service tax:-
1) The tenders shall be evaluated on firm price and cost with GST and cess as applicable unless
otherwise mentioned in the tender documents.
2) IF the supplier/contractor have opted for the composition scheme of GST, the same must be clearly
specified with valid declaration and certificate from department. In the event of withdrawal/
cessation of the supplier from composition scheme during the tenure of the contract, the rate(i. e.
price) mentioned in the price bid shall be final and any additional GST will have to be borne by the
tenderer himself, In no case additional amount towards GST or otherwise will be paid/reimbursed to
supplier/contractor.
3) The bidder shall have to inform their GST no. of the registered place(s) where from the bidder
intends to supply the goods/services, meaning there by the bidder has to supply the goods/services
from the relevant declared/ registered place(s) of supply only.
4) The bidder shall not include GST in their quoted rates; but the bidder has to separately indicate the
GST rate, amount in the price bid schedule.
5) In-case Govt notification comes for change in GST , the same will be applicable.
6) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO. (copy of PAN
to be enclosed) Tenders submitted without GSTIN No by the firms, the offer will be rejected without
entering into further correspondence.
Further information required, if any, can be had from the office of the Chief Engineer, GSECL,
GTPS. But it must be clearly noted that the tenders must be received complete in every respect
by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any discrepancy,
whatever written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be entertained.
Any ignorance for this shall not relieve the contractor from his contractual liability arising as per
tender documents and conditions contained in it.
EW- 266 PUR-F-006 RFQ-
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/ raw
materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to. The work
is to be completed in time limit from the date of issue of written order to commence the work by
the Chief Engineer (Gen.), GSECL, Gandhinagar TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender and if
withdrawn, the Earnest Money Deposit submitted with the tender will be forfeited.
vi. The works covered under these specification shall be carried-out and governed by “Tender and
contract for Works” booklet appended herewith except where conditions specified in this
specifications.
vii. The successful bidder shall have to enter in to an agreement for contract as per G.S.E.C.L rules
on a stamp paper of Rs.300/- and necessary stamp duty charge shall be borne by the
contractor/consultant.
viii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and scope of
work, Tender and contract for Works booklet, General Conditions, Instructions to bidder &
Technical specifications. All these sections are complimentary to each other. The particulars and
requirements contained herein shall cover the execution of the works covered under these
specifications.
ix. The tenderer must visit the site of works and see for him self the site conditions regarding
availability of approach road during all seasons and other matters affecting the above works
before submitting the tender.
x. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the work to be
done and of conditions and local conditions and other factors bearings on the execution of the
works. GSECL will not therefore after acceptance of contractor's rate pay any extra charge for any
other reason; in case the contractor is found later on to have misjudged the site condition.
xi. GSECL’s authorized officers who accepts tender, shall have the right of rejecting all or any of the
tenders and will not be bound to accept the lowest offer nor to assign any reason whatsoever for
the rejection of any tender or all tenders.
xii. Bidders shall provide evidence of their continued eligibility to the satisfaction of the owner.
xiii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent Practices
issued by the Govt., the list of black listed Contractors announced by GSECL (erstwhile GEB) Govt.
of Gujarat or its Public Sector undertakings or the contractors who are under stop dealing in
GUVNL and /or their any subsidiary company viz. GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiv.The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed with
the name of Firm / company which will be legally binding on all partners / parties.
xv.If the application is made by an individual, it shall be signed by the individual above his full
typed written name and current address.
xvi.If the application is made by a proprietary firm. It shall be signed by the proprietor above his
full typed written name and the full name of his firm with its current address.
xvii.If the application is made by a partnership firm, it shall be signed by all the partners of the
firm above their full type written names and current addresses or alternatively by partner
holding power of attorney for the firm in which case a certified copy of the power of attorney
shall accompany the application. A certified copy of the partnership deed, full names and
current addresses of all the partners of the firm shall also accompany the application.
xviii. If the application is made by a limited company or a Corporation, it shall be signed by the
authorized person holding power of attorney for signing application in which case a certified copy
of the power of attorney shall accompany the application. Such Limited company or
Corporation may be required to furnish satisfactory evidence of its existence before the pre-
qualification evaluation. They should also furnish Articles of Memorandum of Association. If the
application is made by group of companies, it shall be signed by the authorized person. The
authority letter shall be accompanied with the application.
2. SECURITY DEPOSIT
EW- 266 PUR-F-006 RFQ-
It should be mandatory to submit security deposit as per cl no.7 of Section C (i.e General
condition of contract). In cases where selected agency (successful L1 bidder) is not willing to
pay SD in advance, either EMD may be converted to SD or SD may be deducted from 1st or
subsequent invoices/RA bills with consent from the bidder.
3. MAINTENANCE: NIL
4. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 11 (Twelve) Months calendar
months from the date of issue of letter to commence the work. However extension in time limit
will be granted by GSECL for the genuine reasons only as per terms of the contracts.
5. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL’s general procedure and submission of bill by
the agency. Also, 75% payment shall be made immediately within a week period on receipt of
recorded bill by Account Section without checking of detail bill and compliance of queries &
statutory requirement. However, remaining balance 25% amount shall be released only after
through checking of detail bill and compliance of various quarries, statutory compliance etc. The
above payment term is applicable to all the bills of general civil works & ARC/BRC works, provided
the bills are recorded regularly and submitted to Account Section within Ninety [90] days. If the
contractor fails to submit the bills regularly in such a way so that the same cannot be recorded and
submitted to account section within Sixty [60] days, ad-hoc payment as stated above, may not be
released and payment will be released as per GSECL’s general procedure. The period of Sixty [60]
days shall be considered from the date of receipt of last R.A. Bill by Account Section.
6. METHOD OF PAYMENT:
a. The payment for the work done will be made by running bills every month after
taking joint measurement within 30 days.
b. Final bill will be paid within reasonable time after settlement of material account by
you and after recording of joint measurement.
7 “All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm
along with a certificate regarding verification of authenticity of documents as per the format
placed at Appendix 1. All the documents submitted by the bidder in support of meeting
Technical QR only shall be digitally signed by the Specified Third-Party Inspection Agency
(TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.
The verification and certification of authenticity of documents is acceptable from any of the
following TPI As:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
Verification for authenticity shall not be applicable in following cases.
EW- 266 PUR-F-006 RFQ-
1: Bidders having proven track record or regular suppliers/contractors (i.e.
2: Past order copies of GSECL as these documents can be verified internally.
The Bidder shall be responsible to get their documents/ credentials verified & certified by the
Specified Third- Party Inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party verification
and certification (including those by statutory auditors) shall be borne by the Bidder. GSECL shall
have no liability (financial or otherwise) towards the same and shall not be liable for any claim/
dispute between the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory
Auditor of their Company or Practicing CA/CA Firm.”
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in//accreditation/reg_bod_inspection_bodies.php.
Undertaking from Third Party Inspection Agency/Statutory Auditor or
Practicing CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the
Power Station ……………….
Subject: Authentication of veracity of documents submitted by M/s …… in support of
Meeting the Qualifying Requirements
Ref: Tender no. …………………..
Name of the Package/ Tender: ………………………………………
M/s. ……………… (here in after called Bidder) having Registered office at ……………………
intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
Firm as per the list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and
1. Doc ref. no. ……….. Dated …….. (Name of Documents)
2. Doc ref. no. ……….. Dated …….. (Name of Documents)
EW- 266 PUR-F-006 RFQ-
All the aforesaid documents have been digitally signed by us as a certificate of
We further confirm that we neither have any vested interest in aforesaid tender nor
have any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose of
participating in the subject tender/s
The rights and liabilities of the contractor shall not be assigned or transferred by them without
the consent in writing of the GSECL to any other person, firm or organization.
9. The successful Bidder, on receipt of letter of intent will submit within a week's time his
planning / programme of works, for scrutiny of the GSECL in a Bar Chart format, clearly indicating
GSECL's inputs also. Contractor will plan his works such that simultaneous work should progress in
such a way that entire job is completed in scheduled time limit on all the fronts released by
10. The successful bidder will have to depute his authorized representative to attend progress
review meetings to be held at GSECL, Gandhinagar TPS without any extra cost.
11. The Contractor will be responsible for complying with all rules and regulations and labour
laws applicable to him and the GSECL will not be responsible for any lapses committed by them. If
there is any claim from any Government authority pertaining to the contract, the same amount
will be deducted from the Contractor's bill.
12. The time limit for completion of work is stipulated as in the tender will be adhered to.
13. The Contractor's rates should be firm and no variation clause is to be quoted by the
Contractor and GSECL will not accept the same, during contractual period including extended time
14. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as a
guide to the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for himself all
the data, information and particulars required for the satisfactory execution of the work under this
tender. The submission of a bid by Bidder implies that he has fully read the specifications, bid
drawings, instruction to the bidder along with Contract Document and Conditions of Contract,
applicable labour laws, safety norms etc., and has made himself aware of the scope and the
specifications for the work to be performed and local conditions and other features which have a
bearing on the cost and execution of the work. This specification is intended as a general
description of quality envisaged for materials and workmanship and of the finished work. It is not
intended to cover minute details. The work shall be executed in accordance with the best modern
practice and to the complete satisfaction of the Purchaser. Special techniques approved by the
Purchaser shall be used if and where found necessary. This specification shall have precedence if
anything contrary to this is stated elsewhere in the contract documents. The Purchaser’s decision
shall be final and binding on the contractor on any issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all information
required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of Transport to site,
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
EW- 266 PUR-F-006 RFQ-
Required GSECL’s security checks.
All materials brought to site only after making entries in security register at Control gate
c) These factors are likely to affect the satisfactory completion of work and or cost thereof.
The submission of a bid by the Bidder will be construed as evidence that such an
examination was made and any later claims/ disputes in regard to rates quoted shall not be
entertained or considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities including
cash, arising out of the site visit shall be at the bidder’s account.
e) Contractor’s scope of work shall also include making all necessary arrangements for access
to work sites, stores and site offices etc. from the nearest approach road to facilitate
transportation of man power, machinery and equipment duly considering the existing site
conditions. No extra claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors & shall
take into account &consider all the factors such as lead, lift haulage of materials, sequence
of construction, etc. & shall allow for all such information / data in the rates quoted.
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor
claims, after acceptance of contract to have misjudged the site condition. Ignorance of the
intents and contents of the specification document and site conditions shall not be accepted
by the Owner as basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as sub-surface conditions, water records, access to site,
communication, transport, right of way, the type and number of equipment and facilities
required for the satisfactory completion of work, the quantity of various items of the work,
the availability and rates of material, local working conditions, uncertainties of weather,
obstructions and hindrances that may arise etc. which may affect the work or cost thereof,
before submission of his bid. Ignorance of site conditions shall not be accepted by the
ENGINEER IN CHARGE as basis for any claim for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the
Engineer in Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit on online in n-procure with their offer without any deviations in
general terms and conditions of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be accepted.
Once the offer is submitted by bidder before due date of submission, the bidder shall not be
allowed to submit revised/ additional/ modified offer even before due date and time of
submission of tender. However, if the date of issue and/or submission of tender are
extended by the Corporation due to any reason, the bidder may submit if their wishes the
revised/additional/modified offer before extended due date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is lowest
or not or to reject all the tenders without assigning any reasons thereof. Tenders deferring
from the technical specifications or the method of bidding in a radical manner may also be
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour conditions & in
general all the necessary information and data etc. pertaining to and need for the work.
n) This specification is intended as a general description of quality envisaged for materials and
workmanship and of the finished work. It is not intended to cover minute details. The work
shall be executed in accordance with the best modern practice and to the complete
satisfaction of the Purchaser. Special techniques approved by the Purchaser shall be used if
and where found necessary. This specification shall have precedence if anything contrary to
this is stated elsewhere in the contract documents. The Purchaser’s decision shall be final
and binding on the contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tenderer is an engineering
construction firm or an association of firm or firm which has successfully carried out large
works of this nature and has adequate organization and experienced personnel to handle
EW- 266 PUR-F-006 RFQ-
this type and magnitude of work. Information should also be given regarding the
constitution of the firm; it’s authorized, subscribed & paid up capital, the date & place of
registration, the place of business, the names of the directors and other relevant
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification documents in
the final ‘Contract’. BIDDERS are required to review these documents and clearly state in
their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped and
dated in ink by the BIDDER as a token of having examined the same. Any correction in
price and the rates entered in the Schedule of Price shall also be signed and dated by the
BIDDER in ink, before submitting the bid. Non-compliance with this condition will make the
bid liable for rejection.
r) All safety measures as required to be adopted as per the Statutory Regulations and the
Safety Rules of the Plant shall be strictly followed by the Contractor during the execution of
the Contract. The Contractor shall set up a suitable safety organization of his own in this
s) In connection with the execution of the Contract, the Contractor shall comply with all
applicable statutory Rules & Regulations including employment of labours at site.
t) The Contractor shall carry out any and all such works, as may be required, for civil work to
be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he shall
direct the Contractor to depute more numbers of supervisory personnel/workers to meet the
completion schedules as per the Contract. Upon receiving such direction, Contractor shall
deploy additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the work
executed, found not in accordance with the specifications/ instructions. No extra claims shall
be entertained for re-executing or altering of such work.
15. SAFETY MEASURES:
The contractor shall ensure the safety of workers, material and structure including existing
structures during execution of the contract. Safety measures shall be followed during
operations of equipments/machinery being used. No separate payment shall be made for
the safety measures and the quoted rates shall include the cost for all safety measures.
16. COMPLETENESS:
Any technical services as set forth here in above and which might not have been specifically
mentioned in this Contract relating to the work or in the specifications and which are not
expressly excluded therefore but which are necessary for the performance in accordance
with the specifications as an integral part of the painting and misc. Civil works shall be
rendered by the Contractor without any extra cost.
17. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
18. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower by
cheque A/c payee only, as per minimum wages & prevailing applicable rules on or before
7th day of next month.
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal Officer
(Estt.) GSECL, Gandhinagar TPS.
19. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State
Electricity Corporation Ltd.'s rules on stamped paper and the necessary stamp duty
charges shall be borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the
tenderer who would be responsible for taking instructions from the Engineers of the GSECL
shall be communicated to Chief Engineer (Gen.) Gandhinagar Power Station, Gujarat State
Electricity Corporation Limited.
EW- 266 PUR-F-006 RFQ-
20. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory then
GSECL will take such action to get the work done through the other agency at agency’s risk
and cost with 15% supervision charges and same will be recovered from agency.
21. The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 & L3 till
the successful contractor pays the Security Deposit as mentioned in tender document or
after the expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security Deposit
for the tender work. If he fails to furnish the SD, his EMD shall be forfeited and the
tenderer will not be allowed to participate in the tenders invited by this office for a period
of ONE Year in respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date
of submission of the tender.
22. Effect and validity of Bid: The submission of bid with these documents and specification shall
constitute an agreement that bidder shall have no cause of action or claim against the GSECL
for rejection of his bid. The GSECL shall always be at liberty to reject or accept, split any bid or
bids at its sole discretion and any action will not be called into question and the bidder shall
have no claim in that regards against the GSECL.
23. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and unless
it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the same
is issued by the company within the validity period and as per agreed terms and
Has committed breach of contract or has failed to perform a contract or has abandoned
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time scheduled / as
per company’s time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the firm.
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with stipulated
time frame, as specified by the company,
Has substituted materials in lieu of materials supplied by the company or has not returned
or has short returned or has unauthorisely disposed of materials / documents / drawings /
tools or plants or equipment supplied by the Company,
Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
Has unauthorisely obtained official company information or copies of documents, in
relation to the Tender / Contract.
Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the company
given to the firm only for its use (in discharge of its obligations against an order) to any
third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to deal
In case the state Government directs the Company to place a firm in stop dealing /
banned for business dealing / blacklisting.
24. Conflict of Interest among Bidders / Agents
A bidder shall not have conflict of interest with other bidders for particular quoted item.
Such conflict of interest can lead to anti-competitive practices to the detriment of
Procuring Entity's interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
EW- 266 PUR-F-006 RFQ-
parties in this bidding process for particular quoted item, if:
a) They have proprietor/partner(s)/Director(s)in common; or
b) They receive or have received any direct or indirect
subsidy/financial stake from any of them; or
c) They have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on
the bid of another bidder, or
e) bidder participates in more than one bid in this bidding process. Participation by
a bidder in more than one Bid will result in the disqualification of all bids in
which the parties are involved. However, this does not limit the inclusion of the
components/ sub-assembly/ assemblies from one bidding manufacturer in more
f) In cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorise only
one agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;
2. Indian/foreign agent on behalf of onIy one principal.
g) A Bidder or any of its affiliates participated as a consultant in the preparation of
the design or technical specifications of the contract that is the subject of the
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business ownership/
management, only one unit should quote. Similar restrictions would apply to
closely related sister companies. Bidders must proactively declare such
sister/common business/ management units in same/ similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition
act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that bidder
shall not have conflict of interest with other bidders for particular quoted item, as
CHIEF ENGINEER (Gen)
SIGNATURE OF CONTRACTOR
EW- 266 PUR-F-006 RFQ-
GENERAL CONDITIONS OF CONTRACT
EW- 266 PUR-F-006 RFQ-
GENERAL CONDITIONS OF CONTRACT
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof, together
with the documents referred to therein or individual work order in the case of term
contract, including these conditions, schedules and/or additional conditions attached to
the form of tender or individual works, order, rate schedule, the specifications and the
drawings and all these documents, as applicable, taken together shall be deemed to form
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the contractors
for the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall, unless
there be something in the subject or context repugnant to such construction means, the
works or the work contracted to be executed under or in virtue of the contract whether
original or altered.
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated or
not, undertaking the words and shall include his or its legal personal representatives,
successors and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the “Accepting
Officer” means the Officer who is authorized to sign and signs the contract on behalf of
the “Corporation”.
(f) The letter “EE” means Executive Engineer who in the case of measurement and lump
sum contract, direct the contract and the letters “SE” means Superintending Engineer and
“GM” means General Manager who administers and in the case of the term contracts,
directs the contract.
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the General
Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer (Gen),
Gandhinagar TPS to Superintending Engineer or the person deputed by him for the
particular purpose.
(i) “BS.” means “British Standards” as issued by the British Standards Institution. “A.S.”
means the “American Standards” as issued by the American Standards Institution, and
“I.S.” means the “Indian Standards” as issued by the Indian Standards Institution.
Wherever the above-mentioned abbreviations are referred to, in the specifications and/or
work orders, they mean the addition with all amendments current at the date of issue of
tender document of work orders.
(j) In the case of measurement and terms of contract “Specifications” mean those contained
in Gujarat State Electricity Corporation Ltd. scheduled together with any amendments
etc. embodied in the tender documents. “Drawing” refers to those incorporating the
tender documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance with
the prices accepted in the tender and/or the contract rate as payable to the contractor for
the full and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part of
the works set out or ascertained in accordance with the individual work orders and the
tender documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on
the Contractor and any change or variation expressed or implied, however made in the
said conditions, shall not be valid or operative unless expressly sanctioned by the
Corporation. The Contractor shall be deemed to have fully informed himself and to have
special knowledge of the provisions of the conditions of the Contract herein contained.
EW- 266 PUR-F-006 RFQ-
B. The contractor shall be deemed to have carefully examined the work and site conditions,
the general conditions, the special conditions, specifications, schedules and drawing
and shall be deemed to have visited the site of the works and to have fully informed
himself regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general
conditions or special conditions of the scope of work of the specifications or any other
matter concerning the contract, he shall in good time before submitting his tender, send
for the particulars thereof and submit them to the Engineer-in-charge in writing in
order that such doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one certified
copy of accepted tender.
The drawings which form part of these specifications show the work to be done in as
much detail as is possible at the present stage. They will be supplemented by such
additional detailed drawings as may be necessary as the work progresses. The contractor
shall perform the work on these features and in accordance with these additional or
revised drawings as the case may be and at the applicable rates as per the contract.
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The contractor
shall not take advantages of errors or omissions of any kind in the drawings supplied.
4. INPUTS BY GSECL:
The electric power supply and connection for construction / work purpose shall be given at
one mutually agreed point at work site free of cost by the GSECL. Further extension for
construction site as well as bore well site for using construction water will have to be
carried out by the contractor as per requirement at their cost. The necessary electric
charges will be paid by the contractor as per rates prevailing from time to time in the
respective DISCOM.
1. If there are any surplus quarters available after meeting the requirement of GSECL's staff,
then GSECL will consider allotment of quarters on rent as per GSECL's rule.
2. The contractor will have to make their own arrangement of water for construction
work as well as for their labourers at his own cost. If possible, water for
construction purpose only at one point as decided by EIC and recovery for water
charges shall be affected at the 2 % of the item of which water is used or by
quantity measured by meter reading of water meter installed by contractor, rate of
water supply will be charged at prevailing purchase rates of GSECL, for water
supplied by GSECL is used as certified by EIC. In case of agency is installing bore
well and pumps at his cost, after completion of work agency will hand over the bore
well in good condition with pumps to the GSECL.
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week of the
date of contract, a layout plan of construction plant and equipment for the
execution of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive Engineer
for approval, plans in triplicate showing the location of Major plant shop and storage
buildings, storage yards, offices, contractor's power house including its services and
housing facilities which he proposes to put up at site and also indicate the programme of
The successful bidder on receipt of letter of intent will submit within a week's time his
planning/programme of works for scrutiny of GSECL in a PERT/Bar chart format, clearly
indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL,
simultaneous work should progress in such a way that entire job is completed in
scheduled time limit.
No change in the approved layout shall be carried out without specific written approval of
the Executive Engineer.
EW- 266 PUR-F-006 RFQ-
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or
discrepancies in the drawings and items of work in specification, reference shall be
made to the Executive Engineer whose elucidation and elaboration shall be considered
as authoritative. The contractor shall be held responsible for any error that may occur in
the work thorough lack of such reference and precautions.
7. SECURITY DEPOSIT:
SECURITY DEPOSIT: In tender process for L1 bidder (lowest bidder) security
deposit will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Organization Exempted 3% of Order End Cost
which are exempted from
paying Tender Fee & EMD
For all other Enterprises 5% of Order End Cost 5% of Order End Cost
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned
above. This may be recovered by deduction through running bills of the contractors and / or by
treating the Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
After issue of Work order and Date of commencement, if successful bidder failed to
start the work then, RPAD notice will be issued to the successful bidder mentioning that
on failing to start the work within next 07 days from the date of issue of RPAD Notice
the EMD will be forfeited and he will not be allowed to participate in the tenders invited
from Gandhinagar TPS office for the period of One year.
The security deposit of the contract value shall be released on finalization of final bill /
successful completion of the work.
All damages, costs, charges, expenses and other sums which may be or may become
due or payable by the contractor to the Corporation under the terms of the contract,
may be deducted from the cash in the proceeds of sale of the securities/bank guarantee
so deposited (which the officer or person to whom the same may be endorsed as
aforesaid is hereby authorized to sell/to encase for that purpose) or from the interest of
any such securities or from any sums due or which may become due to the contractor
by the Corporation or from the whole or the balance unpaid as aforesaid of the encase
securities so deposited being repaid or transferred and returned as the case may be, to
the contractor on finalization of final bill OR after 06 (six) months of successful
completion of the work, whichever later OR on furnishing of the Performance Bond
amounting to 5% of contract value against the defect liability period as mentioned in
this document elsewhere.
If entire security deposit is paid in approved form of Bank Guarantee should be remain
valid during the contractual period and such bank Guarantee should not be reduced on
the basis of the work actually done.
8. USE OF LAND:
The land required for office, godowns and for labour camp if not available with GSECL,
then the contractor has to arrange the same at his cost. GSECL will give the land only if
the spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this
contract free of cost. The contractor shall be permitted to use for the bonafide purpose
of execution of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
compensation on account of damage to crop etc. and shall till completion of work.
EW- 266 PUR-F-006 RFQ-
3. He will be charged the rent at the annual rate of rupees one hundred per every acre
or part thereof, for the construction of temporary hutments and his store yard.
However area required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed over to
the contractor shall be cleared and handed over back in good condition to the
Engineer except areas under works as per this contract or those for which specific
approval has been obtained from the Engineer. The contractor shall make good to the
satisfaction of the Engineer any damage or alternation made to areas which he has
to hand over back or to other property land handed over to him for purpose of this
Temporary structures may be erected by the contractor for storage sheds, offices,
residence etc. for noncommercial use on the land, handed over to him at his own
expense and with the permission of the Engineer. These structures shall comply with
the regulation that may be in force and/or specified by the Engineer with regard,
thereto. In any circumstances for constructing temporary structures for contractor's
use, GSECL's free supply materials shall not be used. If it is found that GSECL's free
supply materials are used for other than approved project drawings work, same will
be recovered at
penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to
the sites which do not interfere with the construction as determined by the
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled
and to structures under construction, or to workmen, and shall be responsible for any
damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and shall
be stocked at the place specified by the Engineer. No claim shall be made for such
cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush wood,
grass or other vegetation nor shall set fire there to without the written permission of
the Engineer. When such permission is given, the contractor shall take necessary
measures to prevent damage or to prevent fire spreading to surrounding property,
and shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in Charge
immediately after the completion of the work under this contract. Also no land shall
be held by the contractor longer than the Engineer shall deem necessary and the
contractor shall, on due notice by the Engineer, vacate and return the land which the
Engineer may certify as no longer required by the contractor for purpose of the work.
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with the
written authority or instructions of the Executive Engineer or his subordinate in charge
of the work, failing such the contractor shall have no claim to ask for measurement or
payment for work and shall be responsible for any claims or damages that may arise
due to such unauthorized commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date on which the order to
commence work is given to the contractor. The work shall throughout the stipulated
period of contract be proceeded with all due diligence (time being deemed to be the
essence of contract) and for delay, the contractor shall pay compensation, an amount
equal to ½ (half) percent per one week for the contract amount or part thereof,
including taxes & duties ( i.e. End cost of contract amount including taxes & duties) and
maximum up to 10 % of the order value, including taxes & duties ( i.e. End cost of
contract amount including taxes & duties) or such smaller amount as per the decision of
the Competent Authority of the GSECL The penalty will be invariably deducted from the
bills of the contractor and no refund will be given unless the competent authority
approves the reduction. The reasons for delay, attributable to GSECL as well as to party
will be brought out clearly while putting the proposal for waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
EW- 266 PUR-F-006 RFQ-
In any case in which under any clause or clauses of this contract the contractor shall
have tendered himself to pay compensation amounting to the whole of his security
deposit (whether paid one sum) or in the case of abandonment for the work owing to
serious illness or death of the contractor or any other cause, the Executive Engineer on
behalf of the Corporation, shall have powers to adopt (a) below and any of the
following courses under (b) and (c) as he may deem best suited to the interest of the
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence and in
that case the security deposit of the contractor shall stand forfeited and absolutely at
the disposal of the Corporation. To employ labour paid by the Corporation, to supply
materials, to carry out the works or any part of the work debiting the contractor with the
cost of the labour and the price of the materials (as to the correctness of which cost and
price, the certificate of the Executive Engineer shall be final and conclusive against the
contractor) and crediting him with value of the work done in all respects in the same
manner and at the same rates as if it had been carried out by the Contractor under the
terms of this contract and in that case the certificate of the Executive Engineer as to the
value of the work shall be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part thereof,
as shall be unexecuted, out of his hands and to give it to another contractor to
complete, in which case, any expenses, which may be incurred in excess of the sum,
which would have been paid to the original contractor, if the whole work would have
been executed by him (as to the amount of which excess expenses, the certificate in
writing of the Engineer-in-charge shall be final, conclusive and shall be borne and shall
be paid by the original contractors and shall be deducted from any money due to him by
the Corporation under the contract or otherwise from his security deposit of his proceeds
sale thereof or a sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him by reason
of his having purchased or procured any materials or entered into any engagements or
made any advances on account of or with a view to the execution of the work or the
performance of the contract. And in case the contract shall be rescinded under the
provision aforesaid, the contractor shall not be entitled to recovery or be paid any sum
for any works thereof actually performed by him under this contract unless and until the
Executive Engineer shall have certified in writing the performance of such work and the
amount payable to him in respect thereof and he only be entitled to be paid the amount
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as per
the opinion/observation of the Executive Engineer (whose decision shall be final) in
charge that the general progress of work is not satisfactory, then Executive Engineer in
charge shall be entitled to take action under clause 11 (c) after giving the contractor ten
days’ notice in writing and the contractor will have no claim for compensation for any
loss sustained by him owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer by
Clauses 11 and 12 hereof shall have exercisable and the same shall not have been
exercised, the non-exercised thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall not withstanding be exercisable in any further
case of default by the contractor of which, by any clauses hereof, he is declared liable
to pay compensation amounting to the whole of his security deposit and liability of the
contractor for past and future compensation shall remain unaffected in the event of the
Executive Engineer taking action under sub-clause (a) or (c) of Clause 11, he may if he
so desires, take possession of all or any tools, plants, materials, and stores in so upon
the work or the site thereof belonging to the contractor, or procured by him and
intended to be used for the execution of the work of any part thereof paying for
allowing for the same in account at the contract rates, or in the case of a contract rates
EW- 266 PUR-F-006 RFQ-
not being applicable of current market rates to be certified by the Executive Engineer
whose certificate thereof shall be final. In the alternative, the Executive Engineer may
by notice in writing to contractor or his clerk of works, foreman or other authorized
agent, require him to remove such tools, plant, materials or stores from the premises
within a time to be specified in such requisition, the decision to the contractor failing to
comply with any such requisition, the decision of the Executive Engineer as to the
expense of any such removal and the amount of the proceed and expense of any such
sale, be final and conclusive against the contractor
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the work
on the ground of his having been unavoidably hindered in its execution or on any other
ground, he shall apply in writing to the Executive Engineer and the Executive Engineer
may, if in his opinion there are reasonable grounds for granting extension, recommend
such extension as he may think necessary or proper. The decision of the competent
authority in this regard shall be final, and binding to the contractor. Any delay attributed
to Corporation, shall be thus compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion Certificate
by the Executive Engineer. No such certificate shall be given nor shall be the work
considered to be completed until works are taken over and/or duly tested and put to
operation as the case may be, nor until the work shall have been measured by the
Engineer-in-Charge or where the measurement have been taken by his subordinates
until they have received the approval of the Executive Engineer the said measurement
being binding and conclusive against the contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than Rs.1,000 till after
the whole of said work shall have been completed and a certificate of completion given.
But in the case of works estimated to cost more than Rs.1,000, contractor shall on
submitting a monthly bill thereof, be entitled to receive payments. Proportionate to the
part of the work then approved and passed by the Engineer-in-Charge, whose
certificate of such approval and a passing of the sum so payable shall be final and
conclusive against the contract. All such intermediate payment shall be regarded as
payment by way of advance against the final payment only and not as payments for
work actually done or completed and shall not preclude the Engineer-in-charge from
requiring bad, unsound, imperfect or unskillful work to be removed and taken away and
reconstructed or re-erected nor shall any such payment be considered as admission of
the due performance of the contract or any part thereof in any respect of the occurring
of the claim nor shall conclude, determine or effect in any way the powers of the
Engineer-in-Charge as to the final settlement and adjustment of the accounts otherwise
or in any other way, vary or affect the contract. The final bill shall be submitted by the
contractor within one month of the date fixed for completion of work; otherwise the
certificate of the Engineer-in-charge of the measurement and of total amount payable
certificate of the Engineer-in-charge of the measurement and of total amount payable
for the work shall be final and binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than Rs.1, 000 agreed to
within shall be valid only when the item concerned is accepted, having been completed
full, in accordance with the sanctioned specification. In case, where the items of the
work, are not accepted, as so completed, the Engineer-in-charge, may make payment
on account of such items at such reduced rates, as he may consider reasonable in the
preparation of final or running accounts bills and it will be binding to the contractor.
The Bill Shall be submitted by the contactor each month on or before the date fixed by
the Engineer-in-charge, for all works, executed in the previous month and the Engineer-
in-charge shall take or cause to be taken the requisite measurement for the purpose or
having the same verified and the claim so far as it is admissible, shall be adjusted, if
possible, within Fifteen days from the presentation of the bills. If the contractor does
EW- 266 PUR-F-006 RFQ-
not submit the bill, within the time fixed, as aforesaid, the Engineer-in-charge may
depute a subordinate to measure up the said work in the presence of the contractor or
his duly authorized agent, whose counter signature in the measurement shall be
sufficient warrant and the Engineer-in-charge may prepare a bill from such list which
shall be binding on the contractor in all respects. In case if contractor/ representative
does not remain present on specified date for taking measurement than EIC may take
the measurement one sided and the same shall be binding to the contractor irrespective
whether he has signed or not.
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
If the specification of the estimated work provides for use of any special description of
material to be supplied from the Corporation’s stores or if it is required that the
contractor shall use certain stores to be provided by the Engineer-in-charge, (such
material and stores and the prices to be charged thereof as hereinafter mentioned
being so far as practicable for the convenience of contractor but not so as in any way to
control, the meaning or effect of this contract specified in the schedule or memorandum
hereto annexed). The contractors shall be supplied with such materials and stores as
may be required from time to time be used by him for the purpose of the contract only
and the value of the full quantity of materials and stores so supplied shall be set off or
deducted from any sum due or thereafter to become due to the contractor, under the
contract or otherwise or from the security deposit or the proceeds of sale thereof if the
deposit is held in government securities the same or a sufficient portion thereof, shall
be sold for the purpose. All materials supplied to the contractor shall remain the
absolute property of the Corporation and shall on account be removed from the site of
work and shall at all times be open to inspection by the Engineer-in-charge. Any such
materials unused and in perfectly good condition at time of completion or determination
of the contract shall be returned to the Corporation’s store if the Engineer-in-charge so
requires by notice in writing given under his hand but the contractor shall not be
entitled to return any such materials except with such consent and he shall have no
claim for compensation on account of any such materials supplied to him as aforesaid
but remaining unused by him or for any wastage in or damaged thereto. The contractor
shall be responsible for the loss, destruction or deterioration of the materials, stores or
articles supplied to him by the Corporation even if such loss, destruction or deterioration
has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property.
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWING, ORDERS ETC.
The contractor shall execute the whole and every part of work in the most substantial
and workman like manner and both as regarding materials and in every other respect in
strict accordance with the specification. The contractor shall also confirm exactly, fully
and faithfully to the designs, drawings and instructions in writing relating to the work
signed by the Engineer-in-charge and lodged in his office and to which the contractor
shall be entitled to have access for the purpose of inspection at such office, or on the
site of the work during office hours and the contractor shall, if he so requires, be
entitled at his own expense to make or cause to be made copies of the specification and
of all such designs, drawings and instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions to the
original specification, designs and instructions that may appear to him to be necessary
or advisable during the progress of the work and the contractor shall be bound to carry
out the work in accordance with any instruction in this connection which may be given
to him in writing, signed by the Engineer-in-charge and such alterations shall not
invalidate the contract. Any additional work which the contractor may be directed to do
in the manner above specified as part of the work shall be carried out by the contractor
EW- 266 PUR-F-006 RFQ-
on same conditions in all respect on which he agreed to do the main works and at the
same rates as are specified in the tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and the
specifications recommended by the contractor and accepted by the competent
authority, the alteration above referred to shall be within the scope of such designs,
drawings and specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE OF
THE CORPORATION
If the additional and altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Corporation or at the rate mutually agreed upon
between the Executive Engineer and the Contractor, whichever are lower. If the
additional or altered work for which no rate is entered in the Schedule of Rates of the
Division is ordered to be carried out before the rates agreed upon then the contractor
within seven days of date of receipt by him of the order to carry out the work should
inform the Executive Engineer for the rate which it is his intention to charge for such
class of work and if the Executive Engineer does not agree to this rate, he shall be
noticed in writing, be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided always
that if the rates shall have been determined as lastly herein before mentioned then in
such case he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rates as shall be fixed by the Executive Engineer in
the event of disputes, the decision of the General Manager of the Corporation will be
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR ALTERATION
The time limit for the work shall be extended in the proportion that the increase in its
cost occasioned by alterations or additions bears to the cost of the original contract
work and the certificate of the Engineer-in-charge as to such proportions shall be
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO BE
If at any time, after the execution of the contract documents, the Engineer-in-charge
shall, for any reason whatsoever, requires the whole or any part of the work, as
specified in the tender, to be stopped for any period or shall not require the whole or
part of the work to be carried out at all or to be carried out by the contractor, he shall
give notice in writing of the fact to the contractor who shall thereupon suspend or stop
the work totally or partially as the case may be in any such case, except as provided
here under. The contractor shall have no claim to any payment or compensation
whatsoever on account of any loss in profit or advantage which he might have derived
from the execution, of the work in full but which he did not so derive in consequence of
the full amount of work not having been carried out or on account of any loss that he
may be put to on account of materials purchased or agree to be purchased or for
unemployment of labour recruited by him. He shall not also have any claim for
compensation by reason of any alterations having been made in the original
specification, drawings, designs and instructions which may involve any curtailment of
the work as originally contemplated. Where, however, materials have already been
purchased or agreed to be purchased by the contractor before receipt by him of said
notice, the Executive Engineer provided they are not in excess or requirement and are
of approved quality and/or shall be compensated for the loss, if any, that he may put to
in respect of materials agreed to be purchased by him. The amount of such
compensation to be determined by the Executive Engineer, whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labour
charges during the period, during which the stoppage of work has been ordered under
this clause the contractor shall on application be entitled to such compensation on
account of labour charges as the Executive Engineer whose decision shall be final, may
consider reasonable provided that the contractor shall not be entitled to any
EW- 266 PUR-F-006 RFQ-
compensation on account of labour charges if, in the opinion of the Executive Engineer,
the labour could have been employed by the contractor elsewhere for the whole or part
of the period during which the stoppage of the work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN
SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation for the
loss suffered by him on account of delay by Corporation in the supply of materials
entered in Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Any other reasonable cause beyond the control of Corporation, including shortage of
materials to be supplied by the Corporation and difficulties in time by reaching at the
site of any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstances of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as final
by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any
compensation from Corporation on any account unless the contractor has claimed in
writing to the Executive Engineer within one month of the cause thereof.
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, before the security deposit is refunded to the contractor, it shall appear
to the Executive Engineer or his subordinate in charge of the work that any work has
been executed with unsound, imperfect or unskillful workmanship or with materials of
inferior quality or that any materials or articles provided by him for the execution of the
work are unsound or of inferior quality to that contract for or are otherwise not in
accordance with the contract, it shall be lawful for Engineer-in-charge to intimate this
fact in writing to the contractor and then notwithstanding the fact that the work,
materials, or articles complained of, may have been inadvertently passed, certified and
paid for, the contractor shall be bound forthwith to rectify or remove and reconstruct
the work so specified in whole or any part, as the case may require or if so required
shall remove the materials or articles so specified and provided other suitable materials
or articles at his own charge and cost, and in the event of his failing to do so within a
period to be specified by the Engineer-in-charge in the written intimation aforesaid the
contractor shall be liable to pay compensation at the rate of one percent on the
amount of the estimate for every day not exceeding ten days during which the failure
so continues and in the event of any such failure as aforesaid, the Engineer-in-charge
may rectify or remove or re-execute the work or remove and replace the materials or
articles complained of, as the case may be, at the risk and expense in all respects of
contractor should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted, or made use of, it shall be within his
discretion to accept the same as such reduced rates as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the
Engineer-in-charge or his subordinate in charge of the work feels that such work has
been executed with unsound, imperfect or unskillful workmanship or with materials of
inferior quality, he shall take sample tests at random, cost of which shall have to be
borne by the contractor and if after taking such test part of such work is found to be
defective in any respect or to have been executed with materials of inferior quality then
the contractor shall pay for the whole work such amount as may be fixed by the office
of the Engineer-in-charge on the basis of the lowest quality of work found by him in
such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE
AGENT TO BE PRESENT.
EW- 266 PUR-F-006 RFQ-
All works under execution or in pursuance of the contract shall at all times be open to
the inspection and supervision of the Executive Engineer and his subordinate and
contractor shall at all times, during the usual working hours and at all other times at
which reasonable
notice of the intention of the Executive Engineer or his subordinate to visit the works
shall have been given to the contractor, during which period either he should be
present to receive order and instruction, or have a responsible agent duly authorized
agent shall be considered to have the same force and effect as if they had been given
to the contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Executive
Engineer or his subordinate in charge of the work, before covering up or otherwise
placing beyond the reach of measurement of any work, in order that the same may be
measured and correct dimensions thereof, taken before the same is so covered up or
placed beyond the reach of measurement and shall not be covered up or placed beyond
the reach of measurement and work without the consent in writing of Executive
Engineer or his Subordinate in charge of work. If any work shall be covered up or
placed beyond the reach without such notice having been given or consent obtained,
the same shall be uncovered at the contractor’s expense and in default thereof no
payment or allowance shall be made for such work or for the materials with which the
same was executed.
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special materials,
if any as may be supplied from the Corporation stored in accordance with the contract).
Plant, tools, appliances, implements, ladders, cordage, tackle, scaffolding and any
temporary works which may be required for the proper execution of the work, in the
original, altered or substituted form and whether included in the specification and other
document forming part of the contract or referred to in these conditions or not and
which may be necessary for the purpose of satisfying and complying with the
requirements of the Engineer-in-charge as to any matter on which under these
conditions, he is entitled to be satisfied or which he is entitled to require together with
carriage thereof to and from the work. The contractor shall also supply without any
charge the requisite number of persons of setting out works and counting, weighting
and assisting in the measurement of examination at the time and from time to time of
the work or materials, failing this the same may be provided by the Engineer-in-charge
at the expenses of the contractor and the expenses may be deducted from any money
due to the contractor under the contract or from his security deposit or the proceeds of
sale thereof or of a sufficient portion thereof, the contractor shall provide all necessary
fencing and light required to protect the public from accident and shall also be bound to
bear expenses of defense of every suit, action or other legal proceedings of law that
may be brought by any person for injury sustained. Owing to neglecting of the above
precautions and to pay any damage and cost which may be awarded in such suit, action
or proceedings to any such person or which may with the consent of the contractor be
paid in comprising any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor’s
laborer, whether in or beyond the limit of Corporation’s property, shall be estimated by
the Executive Engineer or such other office as he may appoint and the estimates of the
Executive Engineer, subject to the decision of the Superintending Engineer, on appeal,
shall be final and the contractor shall be bound to pay the amount of the assessed
compensation demand, failing which, the same will be recovered from the contractor as
damages or deducted by the Engineer-in-charge from any sums that may be due to or
become due from Corporation to the contractor under this contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal proceeding
that may be brought by any person for injury sustained by him owing to negligence of
precautions for prevent the spread of fire and he shall also pay any damage and cost
that may be awarded by the court, if in consequence
EW- 266 PUR-F-006 RFQ-
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the Engineer-in-
charge and if the contractor assign, or sublet his contract, or attempt to do so or become
insolvent or commence any proceedings to be adjudicated as insolvent or make any
composition with creditors, attempt to do so, the Engineer-in-charge may, by notice in
writing rescind the contract. Also, if any bribe, gratuity, gift, loan, perquisite, reward or
advantage pecuniary or otherwise shall either directly or indirectly be given, promised or
offered by the contractor or any of his servants, or agents, or any person to the
employee of the Corporation in any way relating to his office or indirectly interested in
the contract, the Executive Engineer may, by ten days’ notice in writing, rescind the
contract. In the event of a contract being rescinded the security deposit of the contractor
shall there upon stand forfeited and be absolutely at the disposal of the Corporation and
the same consequences shall ensure as if the contract has been rescinded under Clause
11 thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these conditions
shall be considered as a reasonable compensation to be applied to the use of Corporation
without reference to the actual loss or damage sustained and whether any damage has
not been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction and
subject to the approval of Superintending Engineer /Engineer-in-charge for the time
being who shall be entitled to direct at what point or points and in what manner they are
to be commenced and from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to him
by Corporation under the Corporation’s rules, then in force, the decision of the
Superintending Engineer/EIC for the time being shall be final, conclusive and binding on
all the specifications, designs, drawings and instructions herein before mentioned and as
to the quality of workmanship or material used on or as to any other question, claim,
right matter or thing whatsoever in any way arising out of or relating to the contract,
designs, drawings, specifications, estimates, instructions, orders or these conditions or
otherwise concerning, the works or the execution or failure to execute the same, whether
arising during the progress of the work or after the completion or abandonment thereof.
37. Dispute Resolution Mechanism: For works contracts and composite Contracts, the
arbitration mechanism shall be governed by the Gujarat Public Works Contracts
Disputes Arbitration Tribunal Act, 1992 as per below details.
sub clause 37(1) Amicable Settlement : Any dispute, difference, controversy or
claim between the Parties arising out of or relating to this contract with reference to the
construction, interpretation, breach, termination or validity thereof (hereinafter referred
as "the Dispute") shall, upon the written request of either Party be referred to the
authorized representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good faith a resolution
of the Dispute within thirty days of the service of the request.
sub clause 37(2) Arbitration : If the Parties fail to amicably resolve the disputes or
differences or contrary claims as indicated herewith in sub clause (1) of Clause
arising under or in connection with the present works contracts, whether pertaining to
works contracts alone or works and procurement both, the same shall be referred to
arbitration under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
EW- 266 PUR-F-006 RFQ-
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
The contractor shall obtain from the Corporation stores, such articles as are mentioned
in schedule “A” which may be required for the work or any part of the work or in
making up any articles required therefore or in connection therewith, unless he has
obtained permission in writing from the Executive Engineer or obtained such stores and
articles from elsewhere. The value of such stores and articles as may be supplied to the
contractor by the Engineer-in-charge will be debited to the contractor in his account at
the rate shown in the schedule “A” attached to the contract and if they are not entered
in said Schedule, they shall be debited to him at cost price which for the purpose of this
contract shall include cost of carriage and all other expenses whatsoever which may
have to be incurred in obtaining delivery of the same at the stores aforesaid and further
overhead charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation, even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever beyond
his control as if the materials, stores or articles so supplied were his property. The
contractor shall be responsible for returning the residual materials after completion of
the contract and it fails to return, the balance materials supplied to him by the
Corporation, the cost of the residual materials will be recovered from the contractor at
the market rate or stock issue rate whichever be higher at the time of materials account
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of parts of
the works the contractor shall be entitled to payment in respect of the items of works
involved or the part of the work in question at the same rates as are payable under this
contract or such items or if the part of work in question is not in the opinion of the
Engineer-in-charge capable of measurement the Engineer-in-charge may at his
discretion pay the lump sum amount entered in the estimate and the certificate in
writing of the Engineer shall be final and conclusive against the contractor with regard
to any sum or sums payable to him under the provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures of the
same type, design, the contractor shall submit his bill stated in Clause No. 18 and the
Engineer-in-charge not below the rank of work, Executive Engineer shall certify by
general measurement or by other method considered suitable to him, the value of work
done and the contractor shall be paid monthly a sum equal to 90% of the total value
the work so certified, since the last payment, after deducting a part or whole of the
secured advance if not already paid for the materials utilized on the works. An
additional secured advance for any fresh materials utilized on the works. An additional
secured advance for any fresh materials brought on site will also be paid if certified by
the officer not below the rank of Executive Engineer. After the work is completed final
bill would be paid on the certification of officer not below the rank of Executive
Engineer, that the work, is done according to drawing and specifications attached to the
tender. If any additions and alterations have been carried out, detailed measurement in
respect thereof shall be recorded and extra payment or deductions are regulated as per
item rates quoted by the contractor while submitting the tender and if there are any
items in the additions and alterations for which the contractor has not quoted a rate,
the payment shall be as per Clause 39 above
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is
mentioned, such work shall be carried out in accordance with the PWD and in the event
of there being no PWD specification, the work shall be carried out in all respects in
accordance with the instructions and requirements of the Engineer-in-charge of the
Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
EW- 266 PUR-F-006 RFQ-
Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work actually executed, being either more or less up to any extent than
those entered in the tender or less than those entered in the tender or estimate.
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on account
of acquisition of land and in the case of clearance for works or any delay in according
sanction to estimates.
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on account of
water standing in borrow pits or compartment. The rates are inclusive for hard or
cracked soil, excavation in mud, sub-soil water or water standing in borrow pits and no
claim for any extra rate shall be entertained unless otherwise expressly specified and
mentioned in the tender.
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who shall be
fully authorized to receive and comply with such instructions, as given by the Executive
Engineer. The contractor shall intimate the name of such Engineer with his
qualifications and experience. The Executive Engineer shall have the right to demand
the removal of any technical personnel, skilled or unskilled workmen, who in his opinion
are considered to cause bad workmanship in the execution of works or to cause
46. Terms and Conditions regarding Labour Laws
During the entire period of the contract, the Contractor and his Sub-
Contractors shall at all times comply with all applicable labour laws, rules,
regulations, notifications, and bye-laws issued by the Central Government,
State Government, or Local Authorities. This includes all existing laws as
well as any amendments or new notifications that may come into force
during the contract period.
The Contractor and his Sub-Contractors shall, at all times abide by the
following Acts/Statutes related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment &
Conditions of Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen’s Compensation Act, 1923;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions
of Service) Act, 1979;
14. The Building And Other Construction Workers' Welfare Cess Act,
17. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall
remain fully responsible for ensuring compliance with all other applicable
labour and welfare legislations, rules, and regulations in force during the
The following are some of the major responsibilities of the contractor, in
addition to other obligations prescribed under various labour laws, rules,
and regulations issued by statutory authorities such as the State
Government or Government of India from time to time, which the
EW- 266 PUR-F-006 RFQ-
contractor shall strictly comply with during the execution of the contract.
1) The Factories Act,
The contractor should not deploy worker below the age of
years and above 60 years for the awarded work.
Earn Leave shall be paid to their bonafide contract workers as
per the provisions of the Factories Act,
Payment of Earned Leave should be made monthly together with wages
for better compliance of law. The contractor shall maintain Earn
Leave Register in Form No. 19 as per the provisions of the said
Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to
date and kept ready for inspection at any time or submitted
on-time to the concerned authorities as per applicability of the Acts
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour
License under Contract Labour (Regulation & Abolition) Act
from the appropriate authorities before commencement of work.
The contractor shall maintain a valid labour license under the
Contract Labour (Regulation and Abolition) Act for employing
necessary man power to be required by contractor.
The contractor should not be allowed to engage fifty (50) or more
contract labourers without initiating to obtain the labour license
under the Contract Labour Act. (the said number i.e., fifty (50)
or more includes Supervisor and other staff).
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract
Labours engaged by them, on or before 7th of every month through
nearest Nationalized Bank compulsory, preferably situated in the
premises of TPS area in case of all works contract. The Contractor shall
supply copy of Bank Statement duly stamped by the Concerned Bank as
well as debited entry of amount displayed in the contractors’ own bank
account as token of proof towards payment of Wages through
CLIM/prevailing system at relevant time. Apart from Payment of wages
through Bank, Contractors shall have to make all other payments like
Advances, Bonus, Leave Encashment etc. to their labours through bank
only and cash payment/entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and
conditions of the license. The contractor shall have to pay wages to
workers as notified by the Government of Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and
deprived of their right to minimum wages payment on or before 7th of
each month shall be dealt as per the provision of labour laws.
Recurrence of the same may lead to cancellation of awarded contract.
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of
the Firm / Agency / Company itself for the subject work.
It should be ensured that all the contract labours engaged by
contractor are covered under the provident fund scheme and
employee’s pension scheme and their contribution must be
remitted regularly to the concerned R P F C . The photocopies of
challan along with E C R in this regards should be submitted
regularly to the User Department to enable their onward billing
The contractor shall submit along with his bill (month wise)
EW- 266 PUR-F-006 RFQ-
statement regarding deductions against employees’ provident
fund and family pension scheme in respect of each concerned
employee. Provident fund and family pension scheme at the rate
of 12 % of wages (or at the rates made applicable by the
Government time to time). The contractor’s contribution and
his workers contribution towards provident fund and family
pension scheme shall deposited by the contractor with
concerned PF Authorities.
5) Wo r k m e n ’ s C om pe ns a ti on & E m p l o y e r ’ s L ia b i lit y
The contractors shall have to obtain Employee Compensation
Policy under the Employees Compensation Act before
starting the work. Employee Compensation Insurance shall be
obtained for all the workers engaged for the execution of awarded
contract. If any of the work is sub-letted, the contractor shall
ensure that the sub-contractor take and provide workmen's
compensation and Employer's liability insurance for the labours
engaged. Contractor is liable to pay compensation in case of
accidental injury arising out of and in the course of employment
as per the said Act and shall bear medical expenses due to on
6) The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a
monthly basis along with the payment of wages, calculated on a pro-
rata basis per month, which is equivalent to 15 days’ wages for each
completed year of service for every worker. (* applicable to A R C /
B R C works contract only)
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an
accounting year, bonus, in accordance with the provisions of this
Act, For better compliance, the contractor should pay bonus
amount on a monthly basis along with wages calculated on a
pro-rata basis per month. Contractor has to submit the paid bonus
details of its worker in Form No. C as per the provisions of the
said Act as and when required by the Govt. Authority as well as
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should
provide Maternity Leave and other benefits as per the provision of
9) The Building and other Construction Workers’ Act,
For any construction work, fall under the definition of Section
2(1)(d), happening outside / inside the Factory premises the
said act will be applicable and the contractor or its sub-
contractor shall be liable to comply with the provisions framed
10) The contractor shall give preference to existing or local contract
workers for engagement in the awarded contract and shall issue
appointment orders to each and every workers individually at
the time of their engagement during the period of contract and
terminate the same at the end of the each contract.
Follow the mentioned procedure at each milestone for the
execution of works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour
EW- 266 PUR-F-006 RFQ-
Welfare Officer / Industrial Relations Officer for all formalities
related to labour law compliance before commencement of the
contract and onward Labour Law compliance thereof, so that
later no dispute will arise in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that
contractor’s employees maintain strict discipline as regards
security, methods of safe working etc, and not to cause any
hindrance to smooth running of power station or in execution of
duties by G S E C L staff. Any lapse in this regard will be viewed
seriously and if lapse found, contract is liable to be terminated. If
any of contractor’s staff is found unsuitable or not behaving
properly, the contractor shall have to remove such worker from
the work-site on demand by EIC. To maintain harmonious
industrial relations amongst contract labours is solely the
responsibility of contractor. Any breach of the same will be viewed
3. A digital system developed at the request of the agencies working at
the premises of GSECL, is to facilitate them for easy, efficient,
effective management of data, gate passes, attendances, medical
records, Police Verification documents etc related to their employees
/ workers deployed for various works and services against work
order of GSECL.
4. On receipt of LOA and before commencement of work, authorized
representatives of the agency shall login in the CLIMS online portal
/ prevailing system at relevant time and apply for registration of
their employees / workers uploading all information with required
documents in digital form. Upon completion of due verifications,
clearance by EIC and HR departments, contracting agency will
obtain gate passes. GSECL will only consider documents like wage
sheet duly accepted and signed by individual workers, as per the
engagement/deployment duration/hours of individual worker duly
certified by the agency, being the employer, for the purpose of
payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and up-
to-date data of their workers in the portal/ prevailing system at
relevant time. All statutory compliances under prevailing laws shall
remain the responsibility of the contracting agency. The agency
shall indemnify GSECL against any liabilities arising from non-
compliance of legal provisions or inaccuracies in the data
maintained by them in the digital portal of CLIMS/prevailing system
at relevant time.
5. The Contractor who intends to engage labours more than the
specified limit under law, then necessary - Form No. V under the
Contract Labour (R& A) Act, 1970 or Form No. VI under the
Interstate Migrant worker (employment regulation) Act 1979 as
applicable is to be obtained for the purpose of obtaining Labour
License from the Licensing Authority.
6. It shall be the duty of the Contractor or his Supervisor to ensure
Bio-Metric punching and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff
at site for daily supervision and for maintaining of various
registers and records required under the Labour laws and
contracts. No payment for such supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid
for that specific work order only and contractor should not divert
the man power for any other work order. If any work or part
thereof is desired/required to sublet, the contractor shall obtain
the necessary permission of EIC in black and white well in advance
which is mandatory for considering the statutory documents of
agency other than the agency who awarded work order.
12) During Contractual Work under the progress:
EW- 266 PUR-F-006 RFQ-
1. All Contractors shall have to make the payment of wages to the
Contract Labours engaged by them, on or before 7th of every
month through Nearest Nationalized Bank compulsory,
preferably situated in the premises of p o w e r s t a t i o n area.
The Contractor shall supply copy of Bank Statement duly
stamped by the Concerned Bank as a token of proof towards
payment of Wages through CLIMS / prevailing system at relevant time.
2. All Contractors has to comply & maintain statutory documents /
registers under the provision of labour laws & E P F Act.
3. In case the contractor having more than one contract in the same
T P S , the contractor shall have to obtain work order wise
separate Gate Passes and submit the same with the documents of
statutory compliance that too work order wise every month to the
User Department to enable their onward billing clearance.
(13) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING
The contractor shall indemnify and keep indemnified the
G S E C L , and every member, officer and employees of the
G S E C L , also Engineer-in-charge and his staff against all
actions, proceedings, claims, demands, costs and expenses
whatsoever arising out of or in connection with the matter
referred in above clauses and elsewhere and against all
actions, claims demands, cost and expenses which may be
made against the G S E C L by any workman/ employees of
contractor or any sub- contractor and or from any liability any
wise to any workman/employees of the contractor or sub-
contractor under any laws, rules or regulation having in force of
law including but not limited to claims against the owner under
employee compensation Act, 1923. The Employee’s Provident
Fund Act.1952, and/or the contract labour (Abolition and
Regulation) Act,
The G S E C L shall not be liable for or in respect of or in
consequence of any accident or injury to any workmen or other
person in the employment of the contractor or his sub-contractor,
and the contractor shall indemnify and keep indemnified the
G S E C L against all such damage and compensation and
against all claims, demands proceedings costs, charges and
expenses whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to
comply with all the labour laws as above- m en t io n ed and keep
the G .S . E.C .L . indemnified in respect thereof.
G S E C L : shall be entitled / empowered to deduct directly from the
bills, the amount to be paid to engaged bonafide contract workers
or the contract workers engaged by Sub-contractor; any sum or
sums payable by main contractor / sub-contractor and which
sum/sums the Corporation is required to pay in capacity of
Principal Employer on account of the default
of contractor in respect of all liabilities incurred out of non-
compliance regarding any provisions of Labour Laws and
same amount shall be recovered from the pending dues of the
contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are
in force at present and that may be framed by the G S E C L from
time to time in connection with contracts will be binding and
acceptable to contractor.
The above are some of the major liabilities of the contractor in
addition to other liabilities prescribed under the various labour
EW- 266 PUR-F-006 RFQ-
laws in force from time to time from Statutory Authorities like
State Government / Government of India, which the contractor
shall have to comply with.
The contractor shall provide the name of authorized
representative, as provided to other statutory Government
authorities and will be notified to Engineer In-Charge time to
14) Submission of Statutory documents to ensure the
The contractor shall upload statutory documents, work order-
wise, under Labour Laws and EPF in CLIMS / prevailing system at
Required documents shall be u p l o a d e d by the contractor in
existing portal /prevailing system at relevant time invariably each
month to Engineer In-Charge for onward process and smooth
clearance by HR Department.
List of documents required for gatepasses of contract
workers through clims /prevailing system
Description of documents attached
Copy of Work Order
2 Copy of P. F. Code No.
Insurance Policy as per subject of work order under the
Workmen Compensation Act,1923
Contract agreements/ subletting work contract documents
with approval copy
Copy of Id proof of Aadhar card or Election voting card or
driving license or Passport only
Copy of Police Verification in respect of each contract
15. The contractor whose work order value is above Rs. 5 lacs shall
have to submit “Declaration cum Indemnity Bond” on Rs. 300/-
Non-Judicial stamp paper in prescribed Performa (Annexure- “B”)
with Agreement and Indemnity Bond before the commencement of
EW- 266 PUR-F-006 RFQ-
D ECL A R A T I O N C UM INDEM NITY BOND
( On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECL AR AT ION CUM INDEM NITY BOND made at -------------------------
(mention location) by M/S. ------------------------- having its Reg. office at--------
----------------------------------------------(hereinafter referred to as “Contractor”
which expression shall unless it be repugnant to the context or meaning
thereof, be deemed to mean and include their respective assigns, successors,
executors, subcontractors and / or administrators) of the ONE P A RT in favour of
State Electricity Corporation Limited having its power
Station at … …… …… . . T h e r m a l Power Station (hereinafter referred to as
the “Company” ), which expression shall unless it be repugnant to the
context or meaning thereof be deemed to mean and include its assigns,
successors) of the OT HER P A RT.
W H E RE A S the COMPANY has entered into a contract with the Contractor for
---------------------- dated-------------------------“hereinafter called the “Contract”);
AND W H E R E A S it is one of the essential conditions of the Contract that the
Contractor shall comply with all the provisions of the Labour & Industrial
Laws, as may be applicable from time to time for the discharge and
completion of the works and completion of the Works and Services covered
under said Contract Labour (R & A) Act 1970,Child Labour (Prohibition and
Regulation) Act 1986,The Employees Provident Funds & Miscellaneous
Provisions Act,1952,Employees State Insurance Act 1948, Minimum Wages
Act,1948,Payment of Bonus Act,1965,Payment of Wages Act,1936,
Employees Compensation Act.1923, Factories Act,1948 and other Labour
Laws, Rules, Notifications and Codes which are at present applicable to the
contractor and which may be applicable during the tenure of the contract
(hereinafter referred as the ‘Laws’).
AND W H ERE A S the Contractor has agreed to execute this Declaration cum
Indemnity Bond to this effect and has agreed to indemnify and Company, it’s
Directors, Officers and employees and representatives indemnified and hold
harmless against all third party claims, charges ,penalties, fines, expenses
,losses, damages costs, suits or any other levy against the Company and/or
the management due to the failure of the Contractor to observe or follow all
applicable laws.
NOW T HIS DEE D WIT NESSET H A S UNDER
1. The Contractor hereby declares that all acts, deeds, actions, activities,
conduct and lapse, delays, misdeeds, faults, breaches, inactions etc done by
his assigns, successors, executors, subcontractor and / or administrators
shall be construed to be have been done by the contractor and he
alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the
Contractor subject to the condition of execution of this Declaration cum
Indemnity bond, the Contractor declares and represents to the Company
that the Contractor has obtained all Statutory registrations, Certificates,
licenses and approvals required under the Laws enabling the Contractor
to execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of non-compliance of any ‘Laws’ of the
land by the Contractor in connection with the Performance of the contract, the
EW- 266 PUR-F-006 RFQ-
Contractor shall bear all the resultant liability (ies) whatsoever, if any and that the
company , its Directors, Officers and employees, representatives, shall not be liable for
any such liability(ies). The Contractor undertakes to indemnify and keep the
Company and its Directors, Officers and employees, representatives
indemnifies, defend and hold harmless, against all losses, costs,
damages, claims, penalties, interest, expenses, demands, fines, legal
liability, causes of action, injury to persons, suits etc., which may be
suffered, incurred, undergone and / sustained by the Company including
the Costs and expenses that may be incurred in defending any such
liability(ies) claim(S), Proceeding (S) etc. that maybe made or taken or
taken or arise on the same by any Person, body, authority,
government, judicial / quasi - judicial authority due to the failure or
non-compliance of any such laws and rules there under (including any
amendments in acts, laws, statutes & rules there under) of whatsoever
kind and nature arising out of or in any way connected with, whether
or not such acts or omissions are actual or alleged, active or passive
with regard to the discharge of the said Contract.
4. The Contractor further declares that in case of any suit / claim / right
/ damages / compensation / fine / levy / charges / expenses / losses
/ penalties / costs raised by the third party, including contract
labours engaged by the contractor, he shall join such proceedings in
such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any
loss, damage, claims, suits, demands, decrees, expenses that the
Company may suffer to the fullest satisfaction of the Company and if
the Contractor fails to make good the same then the Company shall
have the right to recover the same from and or any other loss
sustained, without any restriction or limitation, together with any other
incidental expenses, costs, and all incidental logistic expenses etc that
may be suffered by the Company from the Contractor and the Contractor
hereby further confirms and declares that this Declaration cum
Indemnity Bond is irrevocable and shall be final and binding on him,
his heirs, executors, administrators, legal representatives, successors,
subcontractors and assigns, wherever the context applies. any claims,
demands, shall be adjusted against any amount due and payable to the
Contractor and the Company shall have the right to withhold any
amounts due and payable to the Contractor, till the settlement of such
claims, disputes to the Contractor towards discharge of such claims,
obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the
laws of India and any dispute between the parties with regard to this
Declaration cum Indemnity Bond shall be resolved through the dispute
resolution process mentioned in the General Conditions of the Contract
IN W I TN ESS W HEREOF, the said Contractor has hereunto set their hand the
day and year first hereinabove written.
SIG NE D S E A L E D AND D EL IV ERE D By the within named “CON TRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
EW- 266 PUR-F-006 RFQ-
In presence of Witness
Name & Address of Witness Signature
Residential Address:
Residential Address:
The labour codes recently implemented by the Central Government of India shall become
applicable to this contract as and when the same are notified and brought into force by the
Government of Gujarat, along with the Rules framed thereunder. The Contractor shall ensure
full compliance with all such applicable provisions, including any amendments issued from
time to time, and shall be solely responsible for adherence to statutory requirements under
the said Labour Codes and Rules. Any financial or legal liability arising out to due to non-
compliance shall be borne exclusively by the Contractor, and GSECL shall stand fully
indemnified in this regard
To ensure the successful implementation and operation of CLIMS, the following guidelines are
1. CLIMS is a web-based system that can be accessed by agencies from any
location using a desklop, laptop, or mobile device.
2. To begin using the system, agencies must register by entering their EPO (EUrja
Order) number. All other necessary details are automatically fetched from the E-
3. The issuance of gate passes for contract labour is managed entirely through
CLIMS. Agencies can generate and track gate passes within the system.
4. In order to enable gate pass issuance, agencies are required to input and upload
the necessary details of their contract labourers into the system.
5. Once the required information is submitted, the gate pass approval process is
initiated and managed through the system. The request automatically moves
through the predefined workflow levels. Agencies can monitor the real-time status
of their gate pass applications via CLIMS.
6. Upon completion of all required approvals within the system, the gate pass is
issued to the agency.
B. Attendance and wages of workers:
1. Once contract workers gate passes are approved in the system, they are
required to be registered in Bio-Metric/Tace Reader Punching machines by HR
2. The attendance of all contract workers can be monitored and maintained
through CLIMS by contractors.
3. Access to data of Bio-Metric is given to agencies. It should be the duty of
EW- 266 PUR-F-006 RFQ-
agencies or his supervisor to ensure the supply of specified number of manpower
and to ensure their Bio-Metric punching and reporting at the location of work.
4. Attendance register and wage register of the worker will be generated by CLIMS
from the login of agency only.
C. Compliance to various labour laws:
l. All the contractors have to comply various labour laws and they shall submit the
attached Declaration-cumJndemnity Bond before staring of work. This Bond may
also be made part of ensuing tenders/contracts.
2. Contractors shall upload the CLIMS generated previous month attendance sheet,
wage register duly signed by workers, wage bank statement, ECR copy, PF Challan
and Remittance slip.
3, The said submined documents in CLIMS will go to user department, after
verification of completeness of documents, user department will forward it to HR
Department for further verification and approval.
4. If the documents are complete, HR Department will approve in CLIMS and send
to Account Department for further process of bill.
5. If non-compliance is found in submitted documents, it will be returned to user
department in CLIMS with specific remarks and user department will forward it to
contractor for compliance. In such cases, 7 5Yo of the bills may be released subject
to a maximum ceiling of 20Vo of the contract values. Such system of payment shall
be allowed only for 3 monthly Running Accounts (RA) bills (Maximum cumulative
amount up to 20%o of the contract value) of the contractor in a period contract
(AMC) of 12 months or 6 RA bills in a period contract (BMC) of 24 months if there
is non-compliance. All other RA bills and specifically final bill shall not be processed
if the previous & current compliances are not made by contractor. No such
relaxation will be granted for non-periodic, one time or overhauling type contract.
D. Special Case:
In case of work order issued for expert services to PSU or OEM/OES following
procedure may be adopted.
I. If officers / specialized manpower / expert Engineers from Govt / Semi Govt
Companies / PSUs / OEM / OEs/foreign experts are deployed for short-term,
specialized, or ad-hoc technical / consultancy services (e.g., commissioning.
maintenance, consultancy or inspections), concerned Engineer In-Charge (EIC)
shall certify the same.
2. The EIC must obtain following documents from the concerned Govt / Semi Govt
Companies / PSUs / OEM / OES etc:
(D Declaration cum undertaking (As per Annexure-A) that visiting experts are their
regular employees with documentary proof; and
(ii) Declaration towards compliance of applicable labour laws.
The above documents shall be submitted along with the bill / Invoices by EIC to HR
EW- 266 PUR-F-006 RFQ-
Declaration-cum- Undertaking
This is to certify and declare that Shri [Employee's Full Name], son/daughter of
[Father's Name], is a permanent/regular employee of [Company Name], employed
in the capacity of [Designation]. His/Her Employee identity Card is attached
herewith for reference.
It is further declared that his/her Universal Account Number (UAN) under the
Employees'Provident Fund and Miscellaneous Provisions Act, 1952, is [UAN
Number] as applicable.
We hereby undertake and declare that:
1. We have complied with all applicable provisions of all the labour laws,
including but not limited to the Employees' Provident Fund and Miscellaneous
Provisions Act, 1952; the Employees ‘State Insurance Act, 1948; the Payment
of Wages Act, 1936; the Payment of Bonus Act, 1965; the Contract Labour
(Regulation and Abolition) Act, 1970; the Minimum Wages Act, 1948; and
other relevant labour and industrial legislations, in respect of Shri
[Employee's Full Name] as applicable to us.
2. We further undertake to produce, as and when required, all statutory
records, registers, challans, and returns as proof of compliance to the Gujarat
State Electricity Corporation Limited (GSECL) or any other
statutory/government authority.
3. We hereby indemnify GSECL in respect of any civil or criminal liability which
may arise due to any non-compliance of the law of the land in respect of our
above-mentioned employee.
This Declaration-cum-Undertaking is issued in good faith and to the best of our
knowledge and belief and shall be binding upon us.
Authorised Signatory,
For [Company Name]
[Authorised Signatory Name]
[Seal/Stamp of Company]
[contact Details]
47. MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by EIC at
EW- 266 PUR-F-006 RFQ-
site. The Contractor shall make all necessary arrangements at site to mobilize labour,
operators, divers and materials and maintain necessary number of machinery and
equipment, barge, pontoons etc., to guarantee the agreed rate of progress of work as per
b) A detailed work schedule showing how he proposes to carry out the work, specifically
mentioning time periods as well as date of commencement and completion of each activity
and such approved schedules must be strictly adhered to by the CONTRACTOR. After the
owner has agreed with the schedule, the Contractor shall prepare detailed program of each
work front/activity breaking it down giving daily quantifiable/measure of progress. The
schedules are to be reviewed periodically with the OWNER / ENGINEER to ensure that the
completion date will be met or to institute corrective steps (at no extra cost to the
ENGINEER) to adhere to the completion dates. The OWNER reserves the right to revise the
schedule at his discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed time
limit mentioning date of commencement, activity to be carried with its time period, starting
& finishing event for each activity, completion of total project in critical path etc, shall be
jointly fixed and approved by the GSECL. Such approved schedules must be strictly adhered
by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare detailed
program of each work front / activity breaking it down to daily quantifiable measure of
progress. The schedules are to be reviewed periodically with the Owner / E.I.C to ensure
that the completion date will be met or to institute corrective steps (at no extra cost to the
GSECL) to adhere to the completion dates. The Owner reserves the right to revise the
schedule at his discretion in order to keep up to the completion date and to suit the project
requirement and such alterations shall not entitle the Contractor to any extra payment.
e) The GSECL reserves the right to delete any item of schedule-B for which contractor shall
not have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for lay out of
work, which shall be maintained without disturbance by the CONTRACTOR during the
tenure of the contract. CONTRACTOR shall establish local bench marks as directed by the
ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the written
permission of the Chief Engineer (Gen.) GSECL, GANDHINAGAR TPS or his authorized
representatives.
h) During the execution of the work if it is found that the work is not progressing as per the
scheduled program approved by the GSECL & planned by the contractor, due to the reasons
attributable to the contractor, suitable action shall be taken as per Clauses in this tender
elsewhere & other relevant clauses appearing in the section of “Terms & condition of tender
& works contract, Legal conditions of works contract” of tender document. And the GSECL
may also take such action as it may deem fit to ensure that the work is completed in time
at Risk and Cost of the contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed by the
EIC, as and when required for review, discussion, coordination etc. Attending these
meetings shall be obligatory on the part of the Contractor, at no cost to the GSECL.
j) The Contractor shall take all requisite & necessary care to observe that no damage is
caused to the existing, pumps, existing works, service road, or any other structure etc. For
any damage to the existing structures of the GSECL, the Contractor shall be held
responsible and he will have to rectify the damage immediately up to the satisfaction of
Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site clearance
arranged according to the progress of work at site. Therefore, the contractor has to
organize & coordinate the work to suit these circumstantial conditions. In the event of any
delay due to the above or due to any other reason not attributable to the contractor,
reasonable extension in completing the work may be given at the discretion and as decided
by the GSECL but no compensation or idle charges will be payable to the contractor on this
account or any site conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any circumstances.
The corporation will not pay any type of advances including mobilization advance
48. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of GSECL or any
public property due to negligence of contractor or any other reasons attributed to
EW- 266 PUR-F-006 RFQ-
contractor, the decision of E.I.C. regarding the amount of recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the time frame
given, the GSECL shall get the work done through any other contractor at the risk and cost
of the contractor and the cost of execution of such work along with 15% overhead charges
shall be deducted from contractor’s monthly bill over and above recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the one in
which the bill is prepared shall be made from bills approved for payment every month or
at other periods when the bills are prepared, for the various items in the following
order of priorities and extents.
d) Deduction on account of security deposit in full together with shortage, if any, to be made
e) Penalty in full, if levied.
f) Expenditure, if any, incurred by the Corporation on Contractor’s behalf in labour or
materials in full.
g) Charges for services such as water and power supply etc. in full.
h) Charge on account of supply of materials like cement and steel in case of shortages found
in balance or excess consumption than specified.
i) Hire charges for Corporation or Government machinery if any.
j) Recoveries of advance and secured payment or payments for preliminary work in full or the
installment due if and as the same as may have been allowed.
k) Rent recovery on account of allotting quarters on rent as per Corporation’s rules.
l) Income tax and sales tax in full as per Government rules.
m) Outstanding recoveries in respect of other contracts awarded by the Corporation if any.
n) Other recoveries. (If any)
49. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-CHARGE:
The contractor shall proceed with the work with diligence and expedition and the
whole of the work herein specified as well as the mode of execution shall be under
the supervision and direction and shall be carried on to the entire satisfaction of the
Engineer-in-charge, who shall have full power to order the contractor to alter, enlarge
or diminish the form, dimensions, positions, or quantities of any of the work or to make
use of material and workman-ship of different descriptions and qualities from this herein
The whole of the works, together with any temporary works, associated therewith, shall
be carried on in the most substantial proper and mannered workman like manner, with
the best materials and workmanship and to the entire satisfaction of the Engineer-in-
charge and in such order of time as he may direct. The contractor shall attend to and
execute without delay all orders and instruction which may from time to time be issued by
the Engineer-in-charge.
50. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and
workmanship of best quality and strictly in accordance with the specifications and with the
drawings, or with such other drawings or written instruction as may from time to time be
furnished to the contractor, in accordance with terms of this contract and shall be
completed in every respect with all materials and workmanship implied and necessary
according to the fair interpretation and meaning of the same and should there be any
discrepancy between the drawings and specifications or any difference or disputes as to
the dimensions to be worked to or the quality of the materials to be used, or the mode of
doing periodical quantity of the work to be executed or with respect to any subject arising
out of this contract, the decision of the Engineer-in-charge shall be final and binding on all
parties. Rejected material shall be so disposed off as to obviate any possibility of their use
on works. The place, method and period of disposal shall be as directed by the Engineer-in-
51. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor to the
Engineer-in-charge in good time before the use of such material for inspection and
permission of testing if required. The samples shall be properly marked to show the
name of the material, manufacture, place of origin, and place where to be used etc.
Failure of any sample to pass specified tests will be sufficient cause for the refusal to
consider any further sample from the same source.
52. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified, be
responsible for the proper fencing, guarding, lighting and taking of the necessary safety
measures for all works comprised in the contract and or the proper provision of temporary
roadway, footways, guards fences, caution notices etc. as far as the same may be
EW- 266 PUR-F-006 RFQ-
rendered necessary by reasons for the work for the accommodation and protection of
workman foot passenger or other traffic and of the owners and occupiers of adjacent
property and of the public and shall remain responsible for any accidents that
may occur on account of his failure to take proper and timely precautions.
All the arrangements made for fencing, lighting and ventilation shall be maintained by
the contractor throughout the tendency of the contract till physical taking over of the
work by the department.
53. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and protect the
work, and plant, and materials placed at his disposal or acquired for him by the
Corporation, from injury by exposure to the weather, or any cause what so ever and shall
take every reasonable proper timely and useful precaution against accident or injury to the
same from any cause and shall be and remain answerable and liable for all accidents, or
injuries thereto which until the same be or be deemed to be, taken over by the
Corporation, may arise or be occasioned by the acts or omissions of the contractor or his
workmen of sub-contractors, and all losses and damages to the works or such plant or
material arising from such accidents or injuries as aforesaid shall be made good in the most
complete and substantial manner by and at the sole cost of the contractor and to the
reasonable satisfaction of the Engineer-in-charge. If the contractor fails to make good
such losses & damages within the time given by the Engineer-in-charge, the Corporation shall
be at liberty to recover the amount fixed by the Engineer-in-charge for such losses or
damages or any part thereof by deducting it from any sum due by the Corporation to the
contractor under this contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant and
equipment that he may himself have procured for the execution of the work. All reasonable
requests of the Engineer-in-charge to enclose or especially protect any of the above shall be
expeditiously compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not sufficiently
protected by the contractor, he shall be entitled to arrange for such protection at his
unfettered discretion and recover the cost thereof from the contractor.
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor shall also
be liable for and shall be deemed to have indemnified the Corporation in respect of all
damage or injury to any person or any property of the Corporation or of others, occasioned
by the negligence of the contractor or his workmen, or his sub-contractor, or by defective
design, work or materials.
54. EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored strictly in
accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper magazines which are
required for the storage of explosive and arrange for proper storage facilities for oils, fuels
etc. for use in connection with the work.
iii) The contractor shall at his own expense obtain such license or licenses as may be necessary
for strong and using explosives, oils, fuels etc. The department shall not take any
responsibility whatsoever in connection with the storage or use of explosives on the site, or
any accident or occurrence whatsoever in connection therewith. All operation of the
contractor in which or for which Explosives are employed shall be at risk of contractor and
upon his own responsibility.
55. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon the site for
the purpose of the work shall from the time of their being so brought shall be deemed to
be the property of the Corporation in its possession to be used for the purpose of the work
and for that purpose only and shall not on any account be removed or taken away by the
contractor or any other person without the written permission of the Engineer-in-charge
but the contractor shall nevertheless be solely liable and responsible for and loss
destruction thereof or damage thereto. The Corporation shall have a lien on such
materials, tools and tackle for any sum of sums which may at any time prior to the
completion of the works be due or owing to the Corporation by the contractor, under in
respect of and dispose of any such materials, tools and tackle in such manner as the
Corporation may think fit and to apply the proceeding in or towards the satisfaction of
EW- 266 PUR-F-006 RFQ-
such sum or sums so due or owing as aforesaid but subject to such lien and power of sale
and disposal such surplus materials, tools and tackle shall belong to the contractor and
may be removed and disposed off by him as he may think fit.
56. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit from time to
time enter upon any lands which may be in the possession of the contractor under
this contract, for the purpose of executing any work not included in this contract and
may execute such work not included in this contract by agents, or by other contractors at
his option and the contractor shall in accordance with the requirements of the
Engineer-in-charge, afford all reasonable facilities for execution of the works including
occupation of lands by structure or otherwise for any other contractor employed by the
Corporation and his workmen or for the workmen of the Corporation who may be
employed in the execution on or near the site of the work not included in the contractor’s
any contract in connection with or ancillary to the works and in default, the contractor
shall be liable to the Corporation for any delay or expense incurred by reason of such
default. Provided always that if the exercise of those power shall cause any damage to the
contractor he may within fifteen days of such damage arising make a statement of the
same to the Engineer-in-charge who shall from time to time assess the value in his
Judgment of such damage and the Corporation shall from time to time shall pay to the
contractor the amounts (if any accepted as justified) by the Engineer-in-charge. The
contractor shall not however, on account of any such modified, new or extra work
executed by or for the same of the Corporation be entitled to claim relief from the
obligation to execute other works.
57. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full power to
inspect the works, wherever in progress, either on the site, on the contractor's premises or
at the premises wherever situated, of any firm or Corporation where work in connection
with this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit entry on site of
work, any person except authorized agents of the Corporation of the Engineer-in-charge or
the contractor's staff and labour directly engaged on and in connection with the work.
The contractor shall, during working hours, maintain supervisors having sufficient training
and experience to supervise the various items and operations of the work and the said
supervisors shall remain present during the inspections of the Engineer-in-charge. All
orders and directions given to such supervisors or other staff of the contractor shall be
deemed to have been given to contractor. Further the Engineer-in-charge may be due
notice, desire a higher ranking members of the supervisory staff of the contractor to be
present on any specified inspection and the contractor shall comply with such direction.
58. CLEANING UP
The contractor shall at all times keep the construction area and his power house and storage
areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from and about
the premises, and all tools, scaffolding, equipment and materials which are not part of
permanent structure. The premise will be left in a manner fully satisfactory to the Engineer-
in-charge, thereafter only the completion certificate will be issued.
59. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials temporary rolling
stock, plant purchased or hired for use of employment or for any of the purposed for this
contract and such inventory or a copy thereof shall at all times be available for inspection
by the Engineer-in-charge. A complete and up to date copy of the inventory shall be
submitted to the Engineer-in-charge in the beginning and once a year; thereafter changes
in the interim period, if any shall be communicated on every three months.
60. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all appliances,
materials, and plants which may have been loaned or hired to him by the Corporation
and make good all damages which may have occurred to them, except such as shall be
caused by fair wear and tear in execution of the works.
61. PROGRESS SCHEDULE
EW- 266 PUR-F-006 RFQ-
i) The contractor shall furnish, within one week unless extended by the Engineer of the order
to start the work, a progress schedule in quadruplicate indicating the date of start the
weekly progress expected to be achieved and the anticipated completion date of each
major items of work to be done by him, also indicating dates of procurement and setting up
of materials, plant and machinery. The schedule should be such as is practicable of
achievement towards completion of the whole work in the time limit and of the particular
items on due dates specified in the contract and shall have the approval of the Engineer.
Further, the dates for the progress as in this schedule shall be kept up-to-date. In case it is
subsequently found necessary to alter this schedule, the contractor shall submit in good
time a revised schedule incorporating necessary modifications proposed and get the same
approved by the Engineer. No revised schedule shall be operative within such acceptance in
Detailed schedules for each week showing the progress proposed to achieve shall be
submitted to the Engineer and got approved. The Engineer is further empowered to ask for
more detailed schedule or schedules any week by week, for any items or items, and the
contractor shall supply the same as and when asked for.
ii) The Engineer shall have, at all times the right without in any way vitiating this contract,
or forming grounds for any claim to alter the order of the works or any part thereof and the
contractor shall after receiving such direction proceed in the order directed. The contractors
shall also revise the progress schedule accordingly and submit four copies of the revised
schedule to the Engineer within seven days of the Engineer's direction to alter the order of
iii)The contractor shall furnish sufficient plant equipment and labour and shall work such
hours and shifts as may be necessary to maintain the progress on the work as per the
approved progress schedule. The working and shift hours shall comply with all GSECL's
regulations in force and shall be such as may be approved by the Engineer. They shall not
be varied without the prior approval of the Engineer.
iv)The contractor shall from time to time as may be required by the Engineer, furnish the
Engineer, with a statement in writing of the arrangement he proposes to adopt for the
execution of this contract and the Engineer may if he considers, necessary at any time
advise alteration in the same, which the contractor shall adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms, statement
and/or reports as may be approved by the Engineer. Further, the contractor shall submit
four copies showing the progress of work in forms and charts etc. at periodicals intervals as
may be specified by the Engineer.
62. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works and hand
over them to the Corporation on or before the date specified in the tender document
including "Special Conditions" and save as herein provided, in no circumstances whatever
shall extend or alter the date for the completion of works. Provided always that if in the
opinion of the Engineer-in-charge the completion of the works shall be delayed by any
change of original design or by the order of the Engineer-in-charge, of any altered,
modified substituted or additional works or materials omitted or by strikes, lock outs or
stoppages of labour, or revolution, riots, civil or political disturbance or by causes
directly due to war or by the contractor not being given possession of the site or any part
there-of or by the Corporation taking possession of and using the site or any part thereof
or the works or any part thereof, whether any nonperformance of work under the
powers herein contained or otherwise or by any nonperformance of work or non-supply of
materials to be performed or supplied by the Corporation or by the contractor not
receiving any orders, drawings, instructions or directions in time or by the suspensions
of the works or by fire, flood exceptionally bad weather tempest, storm, or by from
unforeseen circumstances (and whether the same shall be due to any act or omission of
the Corporation or its agents or those in their respective service or not) the Engineer-in-
charge may, if in his unfettered discretion, he thinks fit either forthwith or at any later
time and from time to time not withstanding that the prescribed or extended time for
completion has expired or that the work have been completed, by writing under his
hand, extend the time for the completion of the works to such date as he shall appoint.
Provided always that unless the contractor makes a written application to the Engineer-
EW- 266 PUR-F-006 RFQ-
in-charge within one month of the cause of delay and unless the time is extended by the
Engineer-in-charge, the prescribed time shall not be extended notwithstanding delays
from the aforesaid foregoing or any other causes of whatsoever kind.
63. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being given
over to responsible sub-contractors but Corporation shall under no circumstances
recognize these sub-contractors and the responsibility of executing the work in the
accordance with the conditions of contract will entirely rest on the main contracts. The
main contractors will therefore always have the very responsible member, preferably a
technical hand present on the works with power to sign all work orders issued on the site
of work and to take requisite actions in the interest of very efficient execution of
work. However, the subletting of the contract can be made only with the prior approval of
the competent authority of the Corporation.
64. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR CURTAILMENTS
If during the tendency of the contract the Engineer-in-charge shall for any reasons
(which shall be unquestioned) whatsoever require the whole or any part of the work
as specified in the contract to be suspended for any period or shall not require the
whole or any part of the work as specified in the contract to be carried out at all by the
contractor, he shall give notice in writing of the fact to the contractor who shall
thereupon suspend or stop the work totally or partially as the case may be. In any,
case, except as provided hereunder, the contractor shall have no claim to any payment or
compensation whatsoever on account of any profit or advantage which he might have
derived from the execution of the work in full but which he did not so derive in
consequence of the full amount of the work not having being carried out, or on account
of any loss that he may be put to on account of materials purchased or agreed to be
purchased or for unemployment of labour recruited by him. He shall not also have any
claim for compensation by reason of any alterations having been made in the original
specifications, drawings, designs and instruction which may involve any curtailment of the
work as originally contemplated. Where, however, materials have already been
purchased or agreed to be purchased by the contractor, before receipt by him of the
aforesaid notice, the contractor shall be paid for such materials at the rate determined
by the Engineer-in-charge, provided they would have been useful for the work curtailed
or stopped are not in excess of requirements, are of approved quality and cannot be
used on other contract works or otherwise by the contractor and/or shall be compensated
for the loss if any, that he may be put to, in respect of materials agreed to be purchased
by him, the amount of such compensation to be determined by the Engineer-in-charge,
whose decision shall be final.
The Engineer-in-charge may grant extension of time for the execution of any item or items
of work affected by such suspension of work. The decision for the Engineer-in-charge,
regarding the granting of extension and the period thereof shall be final. The Engineer-in-
charge may order the contractor to suspend any work on account of bad weather; rain or
storm and such other adverse climate conditions and the contractor shall comply with the
The contractor shall not be entitled to an compensation for such suspension of work,
concrete lining at the junctions of the different works under different contract shall be
done with particular care regarding forms, construction joints, interconnecting
reinforcement etc. If any and the joint planning of such work shall be with prior approval
of the Engineer-in-charge.
65. OTHER CONTRACTORS
Apart from this work, the other works connected with the power house will be
simultaneous going on either departmentally or through agencies inside or outside the
power house. Each contractor or agency shall co-operate with others to the fullest
extent and shall allow to each other every facility and co-ordination for execution of
their works simultaneously and satisfactorily, during their action of machinery or execution
of any other co-ordination works of the power house, the contractor will have to work
only at places as directed by the Engineer-in-charge. He will have some time to
suspend his work partially or totally in the interest of the work at large.
EW- 266 PUR-F-006 RFQ-
In such cases and at such time, he will be informed from time to time and directed by the
Engineer-in-charge where to work. He may also be required to remove the scaffolding or to
erect the scaffolding and shuttering in such a manner as to be of little obstruction and
inconvenience for erection of machinery. In such cases he shall not be given any
compensation on account of reduction or stoppage or labour force or removal and
reinstatement of scaffolding shuttering etc. It will be seen that contractor is not put to
unnecessary inconvenience.
In the matter of dumps, haul, roads, drainage, diversion and the like, each contractor shall
take into consideration the needs and requirements of the other constructors, if any
working in the vicinity. Further no contractor shall take or cause to be taken any stops
or action that may cause disruption, discontent or disturbance to the work, labour of
arrangements etc. or other contractors in the neighboring project localities.
Any action, by any contractor, which the Engineer-in-charge in his unquestioned discretion
may consider as infringement of the above code, would be considered as a breach of the
contract conditions and the Engineer-in-charge may take such action as he may deem fit
against the contractor and the action taken shall be considered as final and binding.
66. SPEED OF WORK
The contractor shall at all times maintain the speed of work to confirm to the latest
operative progress schedule but the Engineer-in-charge may at any time with sufficient
notice in writing direct the contractor to slow down any part or the whole of the work for
any reason (which shall not be question whatsoever, and the contractor shall comply with
such orders of the Engineer-in-charge. The compliance of such orders shall not entitle
the contractor to any claim or compensation.
67. CONTRACT DOCUMENT AND MATTERS TO BE TREATED AS CONFIDENTIAL
All documents, correspondence, decisions and other matter concerning the contract shall
be considered as of confident and restricted nature by the contractor and he shall not
divulge or allow access there to any unauthorized persons of any kind.
68. ACCESS TO THE CONTRACTOR'S BOOK
Whenever it is considered necessary by the Engineer-in-charge to ascertain the actual cost
for execution of any particular item of work of supply of plant or material shall direct the
contractor to produce the relevant documents such as pay rolls records of personnel,
invoices of materials and any other data relevant to the item or necessary to determine
its cost etc. and the contractor to the aforesaid items in the mode and manner that may
69. INTEREST ON MONEY DUE TO THE CONTRACTOR
The contractors shall not be entitled to get interest on any amount either of their bills or
arrears whatsoever because of delay in payment by the Corporation. Similarly they shall
not be entitled for any interest on amount of bank guarantees given by them. Non-
payment of interest by the Corporation therefore, shall not cause breach of contract.
70. MEASUREMENTS TO BE PROVISIONAL AND SUBJECT TO CORRECTION
Every measurements for running payment on account of work, done or supplies made,
shall be subject to adjustment or final measurements. In case of disagreement between
such intermediate and final measurements, the latter shall prevail. All works shall be
measured, met by standard measure and according to rules and custom and usual in the
use in Gujarat State Electricity Corporation Ltd., and no proposal to adopt alternative
method will be accepted, the Executive Engineer’s decision as to what is “the usual method
in use in the Gujarat State Electricity Corporation Ltd.” shall be final.
71. BREACH ON PART OF CORPORATION NOT TO ANNUAL CONTRACT
No breach or non-observance on the part of the Corporation of any of the agreements
contained herein, shall annul this contract or discharge the contractor from the
observance and performance thereof, or of any part thereof, but on application by the
contractor and in the unfettered discretion of the Engineer-in-charge an extension of
time may be given to the contractor in respect of such breach or non-observance by
the Corporation.
72. PROFORMA RETURNS
The contractor shall maintain Performa, charts and details regarding machinery equipment
materials, labour personnel and other matters as may be specified by the Engineer-in-
EW- 266 PUR-F-006 RFQ-
charge. He shall further, submit returns of Performa and details as may be specified
by the Engineer-in-charge from time to time.
All local laws in force at the time of entering into the contract and those enacted thereafter
shall be binding on the contractor and he shall abide by the same.
All import duties, sales tax and other local taxes shall be borne by the contractor and
they shall be deemed to have been covered by this quoted tender rate
74. WORKS IN SHIFT DUTY
Works shall be planned in shift duties, if possible in three shifts, depending on emergency
of the work with prior approval of Eng. - in- charge. 0n Sunday or any other holidays work
shall be continued in order to maintain progress with prior permission of Eng.-in -charge.
Such works shall not form any grounds for complaint, compensation or extension of time
If on the other hand, the Engineer-in-charge directs that the work shall be proceeded
with on days and during hours which are not permissible under this contract, the
contractor shall proceed with the work as directed without in any way vitiating this
contract or forming any grounds for compensation of claim.
The contractor shall in his dealing with labour, atall times, during the period of this
contract, have due regard to local festivals and religious and other customs.
A working day shall consist of two shifts each of eight hours, a working day shall constitute
any day on which in the opinion of the Engineer-in-charge, work can be carried out in one
or more shifts.
Final payment to the contractor shall not be made until the contractor shall deliver to the
purchaser or receipts in full in lieu thereof, and in either case, an affidavit that so far he
has knowledge or information the releases and receipts include all the labour and material
for which in lien could be filed. If any lien remains unsatisfied after all payments are made,
the contractor shall refund to the purchaser all moneys that the latter may be compelled to
pay in discharging such a lien, including all costs and a reasonable attorney's.
76. MISCELLANEOUS:
1. In case of conflict / discrepancies among clauses of different specifications given in this
document, the stringent specification shall be followed and under such circumstances, the
decision of the EIC shall be final and binding to the Contractor
2. The Notice inviting tender, general instruction to bidders and all other documents of this
tender shall form part of the contract
3. No receipt for any payment alleged to have been made by a Contractor in regard to any
matter relating to tender of the contract shall be valid and binding on the Corporation
unless it is signed by the Engineer-in-Charge.
4. As per provisions of Income Tax Act, Corporation shall deduct Income Tax at the
applicable rate.
5. Agency has to note that the extension of Time limit/excess saving in the works if required
to approve, than it shall be processed as per the provision of DoP and will take time for
process the same.
6. The contract is inclusive of the cost of materials required to complete the work in totality.
7. It will be absolutely incumbent on the contractors to have on the site of work only such of
the materials as have been duly passed by the Engineer-in-charge. Materials that have
been rejected must on no account be allowed to remain on the site, and in spite of written
order to do so, any such rejected materials is on the site beyond a period of 48 hours’
notice, the Engineer-in-charge shall have the right to remove it, at the risk and cost of the
contractors and even to destroy it.
8. It must be distinctly understood that conditions of contract and of claims in respect of
extra work, will not be allowed unless the works to which they relate is clearly without the
spirit and meaning of the specifications or unless such works are ordered in writing by the
Engineer-in-charge and claimed for in specified manner.
9. Contractor will be asked to present the sample of materials, and the approved samples will
be preserved at the site of work, and no change in the approved sample will be allowed,
without the written permission of the Engineer-in-charge.
EW- 266 PUR-F-006 RFQ-
10. The department reserves the right to make any change in the design and the plans of the
works. The contractor shall be bound to carry them out at the rates tendered. No claim or
compensation will be allowed on this account.
11. The contractor shall keep instruction book on site, for taking site instructions from time to
time. This book shall be made available on site whenever asked for.
12. Above construction equipment brought to site shall be allowed to be taken out only after
the work for which it has been brought is over. The equipment shall be taken out only with
the specific permission in writing from the E.I.C. Only the equipment required for the work
and in fit condition shall be brought to the site. The Contractor shall ensure that proper
documentation is followed at entry gate of GSECL's premises for such items which shall be
carried back by Contractor after completion of work.
13. The Contractor shall provide all temporary ladders, scaffolding materials, platforms,
supports and other necessary facilities required for trimming & cutting of trees. The
Contractor shall provide sufficient, strong and safe staging so as to ensure safety of the
14. The Contractor shall provide sufficient fencing, notice Corporations and lights to protect
and warn others as may be considered necessary by the GSECL and safety authority.
15. The GSECL may during the progress of work, order the removal of part or whole of the
work executed, found not in accordance with the approved drawings, specifications/
instructions. No extra claims shall be entertained for re-executing or altering of such work.
16. On completion of the work, the site shall be left in good order and the excess materials,
scraps, debris, if any shall be removed and dumped by the Contractor at place/places as
designated by the GSECL. The Contractor shall also dismantle and remove the staging and
other temporary facilities like stores, offices, labor camp etc. on completion of work.
17. Contractor is required to maintain proper records at site of work in addition to normal
routine requirement of own office. The records to be maintained shall include but not
limited to the following:
(a) Daily Progress Record.
(b) Work Site Order Book.
(c) Instruction by GSECL's Officers.
(d) Test Registers of other materials/fittings, fixtures, equipment as stipulated in the
(e) Register for Working Details.
(f) Log Book of Defects.
(g) Hindrance Register giving details of commencement and removal of each hindrance.
(h) Supply and consumption registers of all materials shall be maintained.
(i) Day to day Record of used/received materials shall be entered in the register and
signed by the Site Engineer of the GSECL as well as contractors' representative at
(j) Measurement Book.
77. SALES TAX ON WORK CONTRACT
The Gujarat Government by its amendment to the Gujarat sales tax act has also made
works contract subject to Sales Tax. However works contract tax shall be liability of the
contractor and shall be born by the contractor. More ever you shall also have to submit
form No 702 as prescribed by Gujarat Sales Tax act while submitting invoice.
More ever the purchaser will not pay any composite tax/turnover tax/works contract tax
which contractor has to pay as per act. Hence the incidence of sales tax or such type of
taxes shall not be payable by the purchaser in any case even if such taxes are levied on the
party/contractor at a future date.
Chief Engineer (Gen)
Signature Of Contractor
EW- 266 PUR-F-006 RFQ-
TERMS AND CONTRACT FOR WORKS
GENERAL SAFETY RULES
LIST OF SAFETY TOOLS
EW- 266 PUR-F-006 RFQ-
TENDER & CONTRACT FOR WORKS
I/We hereby tender for the Gujarat State Electricity Corporation Ltd. (herein Referred as
“Corporation”) of the work specified in the underwritten memorandum within the time specified in
Schedule B (memorandum showing items of work to be carried out) and in accordance, in all respect,
with the specifications, design, drawings and instructions in writing and as per annexed conditions of
contract and agree that when the materials for works are provided by the Corporation, such materials
and rates to be paid for them shall be as provided in Schedule A hereto.
(a) General description of work : “Providing Service on job work for cement used repairing
item, for carpentry work & plumbing work for civil colony at Gandhinagar TPS.”
(b) Estimated Amount Rs. :Rs.
(b) Earnest money (3%) : Rs. 98,928/-
(c) Security deposit : As per cl no.7 of Section C (i.e General condition of contract).
(d) Time allowed for the completion of work from date of written order to commence.:
(Eleven) Months
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and provision
of the conditions of contract annexed hereto as applicable and in default thereof forfeit and pay to the
Corporation, the sums of money mentioned in the said conditions.
Receipt No. Date from the Gujarat State Electricity Corporation Ltd. In respect of the sum of
Rs____________________________________. (The amount to be specified in figures and
words) is herewith forwarded representing the earnest money (the full value of which is to be
absolutely forfeited to the Corporation, should I / we do not execute / commence the work after
issuance of date of commencement by GSECL.
Signature of the Contractor:
Address of the Contractor:
Signature of Witness:
Address of the Witness:
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation Ltd.
For & On behalf of GSECL
Chief Engineer (Gen)
GSECL GANDHINAGAR TPS
his duly authorized Assistant
EW- 266 PUR-F-006 RFQ-
General Safety Rules & List of Safety Tools.
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTORS
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety
Rules. Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged, if
any, by them for the work contract awarded to them. Prior to commencement of the work, Contractor
shall have to submit a written assurance on their letterhead to the concerned Sectional Head /
Engineer-in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their sub contractor and will strictly observe the said Rules while execution of
work under work contract awarded to them. They will have to indemnify the company for any loss or
damage / accident / injury to the company’s property / employee or employee of their own in default
of non – observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL Factory
Manager as per Gujarat Factories rules, 1963 & details shall be filled up in
GSECL gate pass format as per Aadhar c ard /Election car d id proof & to follow
the ga te pass issue procedure through concern department EE & SE, Security Officer,
LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of Gujarat
Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all contractor workers
before commencement of work & examination responsibility shall be taken by contractor as well
as concerned Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory Medical Officer after
every six (06) months of contractor with their contractor workers. Contractor shall be fulfilled all
health requirements before commencement of work. After completion of medical examination in
form no.32/33, GSECL Factory Medical Officer shall be signed in contract worker gate pass
procedure format.
(04) Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(05) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the issue
PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles, Driving
license, Electrical contractor license, Electrical trade qualifications, Safety induction training, SOP,
supervisor qualifications etc. After fulfillment of all Safety compliances, Safety Officer/Dy. Safety
Officer shall be signed in Contract worker Gate pass procedure format.
(06) Work Contract shall be completed by principle contractor/agency/person who is awarded the
work order. Subletting of contract shall be allowed only if prior approval of Power station chief
before execution of work. Contractor/agency shall be submitted the entire subletting contract
documents with gate pass application through concern department EE & SE, LWO/DGM, Safety
Officer/Dy.Safety Officer & Factory Manager.
(07) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass by
agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical
License photocopy shall be checked by Concerned HOD of Electrical Department/Electrical Safety
Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
(08) As per nature of job/work, qualified supervisor (Diploma (Electrical/ Mechanical/Civil/C&I) +
3 years experiences or ITI + 10 years) shall be engaged by contract agency & qualification
certificate with experience certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/
Dy.Safety Officer /Safety Officer/Factory Manager at the time of apply gate pass.
(09) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the
work on electrical lines and Apparatus, Contract person/worker possesses a certificate of
competency or electrical work permit, issued by the Appropriate Government. That means,
EW- 266 PUR-F-006 RFQ-
Electrical trade Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to concern
EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory Manager at the time of apply for
photo gate pass procedure.
(10) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7
round the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor
(BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by
contractor during dangerous operations/dangerous works as well as day to day dangerous
activities, safety supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(11) License of driver shall be submitted with gate pass issue application as per nature of vehicles & to
follow the Motor vehicle Act,1988, the Central Motor Vehicles (Amendment) Rules,2016 as well as
Gujarat Motor Vehicles rules,1989 & driver license shall be checked every day by security shift in
charge before entry in the Factory premises.
(12) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person as
per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences. SOP will
review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
(13) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective Equipments /
Safety Gadgets suitable to give sufficient protection against hazards involved in their work / job to
their staff, as per the job requirement and insist / enforce their workers to put on the same while
The ongoing work is liable to be stopped at any time if your contract workers/staffs found working
without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved
only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 05 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug to their workers/supervisor compulsory & it will
check by concern section HOD & Dy.Safety Officer /Safety Officer at the time of gate pass
Industrial Safety Helmet For protection of head against falling objects or during fall of
person from height. Yellow Colour helmet is used for
contract worker with agency logo.
Safety Goggles/welding For protection of eyes against flying particles / dust, chemical
goggles/chemical splash splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical
splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high noise
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp edged
/Fire proximity suit/FR Boiler objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged
objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged
Oil/Chemical/water/heat/ objects, heat, hot metals/objects, electricity etc..
Electrical resistance etc.
Safety Belt(full body hardness For fall prevention while working at heights or in depth,
with double lanyard & shock working in vessel or in confined space.
absorber) / Rope / Life line /
Fall arrestor etc.
Dust Mask/Respirator with Protection of respiratory system against dust.
EW- 266 PUR-F-006 RFQ-
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases/vapors/dust
with full face mask type etc.
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of confine
( LEL,O2,CO,H2S,SO2, etc) space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of electrical
equipments/ bus/switch gears from 01 (one) feet distance
before starting the any electrical work .
Auto darkening welding helmet The new auto darkening welding helmet combines legendary
(EN 379 & EN 175 Level-B) with Speed glass quality and auto darkening technology with an
PAPR as per EN 12941:1998, innovative wide-view grinding visor to give welders an all-in-
class TH2 and AS/NZS 1716 one solution for more flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in welding.
The unit is equipped with a particle filter which removes
particles from the air. The unit provides a constant airflow
independent of filter combinations and clogging. The unit can
also be equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting breathing
tube. The airflow creates a slight positive pressure which
together with the sealing to the face prevents particles and
other contaminants from entering the head top.
(14) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by party/agency/contractor
to their contractor workers as per nature of job and allotment of PPE list shall be submitted to
Safety Officer, Dhuvaran on his letter head as per below mentioned format by Contractor before
commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Design Name of Name of PPE IS Make Qty Uni Date Receivin
no. of ation Section :Code of t of g
worker under work no. of PPE issue signature
s execution PPE
Safety Helmet No
Safety goggles No
Reusable Ear Pai
Safety Shoes Pai
(15) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
EW- 266 PUR-F-006 RFQ-
(16) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(17) During the work execution, one trained & competent supervisor of agency should always remain
present at work site. Concern JE/DE of GSECL shall be supervised the contract work as per SOP .
(18) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/C&I/Environment
survey/Chemical etc measuring /testing equipments/instruments which are used during contract
work shall be submitted before starting the work & shall be checked by concern JE/DE/EE before
starting work & it’s record shall be maintained in concern section.
(19) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
(20) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & it’s control measure (mentioned in HIRA) before starting
the job work and records shall be maintained for each & every job works.
(21) Display Safety instructions shall be strictly followed by all workers who are working in factory
(22) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief Chemist/Control
room & work related Chemical information shall be taken by contractor & contractor workers from
Concern EE/Chief Chemist before starting of chemical handling work.
(23) The contractor shall be checked & securely covered or securely fenced any opened fixed vessel,
sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each & every
days or after interval/recess. Contractor supervisor shall be informed to concerned HOD regarding
any unsafe conditions.
(24) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
(25) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all
the inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in fire
prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments & fire
extinguishing media / material like sand / water buckets or other appropriate equipment at such
(26) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space /
Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be
used. For taking care of the persons working inside the confined space / vessel, a supervisor /
person capable to keep continuous watch on person(s) working inside, assist them in case of
emergency or arrange to get immediate outside help, shall remain present at entry point. Use full
body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers
etc shall remain available near entry point or the entry point shall be cordoned by a barricaded
tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits
opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of
the work and leave the work place in safe condition in all respect, so as to prevent accident to
fellow workers.
(27) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall
be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading tape &
display suitable caution notice or keep a person to restrict / divert the traffic on this route through
other safe passage.
EW- 266 PUR-F-006 RFQ-
(28) The contractor shall see that he / his persons do not work on or block (by stacking material, spare
parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases /
ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on which there is
traffic movements or possible traffic movements in case of emergency. Such passages are meant
for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area
with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall
be obtained. To demarcate / declare the area as “UNSAFE”, cordon it using barricading tape &
display suitable caution notice or keep a person to restrict / divert the traffic on this route through
other safe passage.
(29) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor’s Mains Board on which it is compulsory
to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably be
earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be used
shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire power cord for three
phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting machine,
Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work execution
shall be of standard make & bear ISI certification mark on it. The consumables like welding
electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be used in
any case if its expiry date is over.
(30) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall be
submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits shall
be checked by JE/DE before commencement of Electrical work.
(31) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it
shall be checked and used only if found safe to use. Also, ensure that these are tested, examined
& certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat Factories
Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior to lifting the
weight. Valid Test certificate of all Lifting machines used by Contractor to be submitted
to Dy.Safety Officer/ Safety Officer before commencement of work through concerned
(32) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard & Fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
(33) Contractor or their employee shall not interfere in day-to-day routine plant activities / works
except the work assigned to them, shall not loiter in the areas other than their work jurisdiction,
as well as shall not temper / operate / touch the machineries/equipments/auxiliaries with which
they are not concerned. Also, the contractor shall strictly instruct their staff for not to sit or take
rest at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous &
prone to accident.
(34) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene,
LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due care. To handle /
shift such cylinders a special trolley /cage meant for it must be used but in no case it should be
(35) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated area,
Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on each vehicle
by party/agency and it will check by shift security in charge before entry of vehicles in the factory
EW- 266 PUR-F-006 RFQ-
(36) No women or young person shall be employed or permitted to work in Lead-compound area like
battery room etc. as per schedule VI of GFR
(37) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act
(38) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift –in-charge well in advance.
(39) In case of noticing smoke or fire during their work execution, they shall make immediate efforts to
extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station Fire
Officer or Emergency Control room no which is displayed at prominent place of factory like Main
Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All security
gates, Occupational Health Centre.
(40) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 &
ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall
be filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of injured
person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety Officer/Safety
Officer/Electrical Safety Officer then after injured person may allow for work.
(41) For any incident occurred but have no injury to any persons should also reported as per GSECL
format and informed to Dy.Safety Officer/Safety Officer as Near Miss Incident.
(42) Safety penalty shall be imposed against violation by contract workers: if any contract worker
worked in a factory contravenes any provision of factories act or any rules or orders made there
under. Imposing any duty or liability on workers, contractors/agency shall be punishable with fine
which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job like Rs.1000/-per day
mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles (like Rs.2000/- per
C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT crane equipment
etc) & its attachments (like D-shackles, slings, U-clamps, Eye
bolts or any fixtures) in Form No.10 of Gujarat Factories
(ix) Work without Double lynyer Safety belt during working at Rs.3000/-per person
Height work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard/ machine Rs. 500/- per
guard equipment/ per set
(b) Unsafe welding machine like open body. Knob without
insulation. Connection without plug
EW- 266 PUR-F-006 RFQ-
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket.
(e) Electrical supply without 3 pin plug/industrial plug.
(f) Use of damaged electrical wire for lighting/equipments.
(g) Use of lighting lamp without cage.
(h) Use of open halogen tube.
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB. Etc
During plants visit/supervision of concern JE/DE/EE,SE. Safety officer/Dy. Safety officer. Electrical
safety officer , factory manager, if they will observed any safety violations as per CO
circular/statutory requirements then they must imposed safety penalty through office note directly
against contract workers/contract agency and Office Note process through proper channel to
concern sectional head and Account head for recovery purpose. Photograph/CCTV Footage is to
be put a with penalty note by imposing officer.
(43) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
(44) All the relevant labour and industrial laws shall also be followed compulsorily.
(45) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces, scrap
etc. are to be removed by contractor and scrap shall be deposited to scrap yard of Main Store.
(46) For performance evaluation of contractor, safety factors of work accident, fire incident & near
miss accident will be considered. Steps can be taken to review the job assignment up to
cancellation for negligence.
(47) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the provisions
of The Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
obey the rules / regulations / instructions of the local Competent Authority for safety & health
(48) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy.Safety Officer/Safety Officer/Electrical Safety Officer in case of any
ambiguity or needs further guidance in this regard.
Chief Engineer (Gen)
Signature Of Contractor
EW- 266 PUR-F-006 RFQ-
PERFORMA FOR BANK GUARANTEE
INTEGRITY PACT
CERTIFICATE – A
EW- 266 PUR-F-006 RFQ-
ON STAMP PAPER OF Rs.300/-
FORM OF BANKER’S UNERTAKING
(For Security Deposit for work period as per Terms and Conditions of Tender)
We, Bank of ______________________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs.__________ (in words) Rupees
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract
for the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive of________________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given conceded or
agreed, with or without our knowledge or consent, by or between parties to the said within written
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs._______________ (Rupees
_______________________________________________________ only). Our guarantee shall remain
in force until _______________ (date of validity of the Guarantee). [Unless demands or claims under
this Bank Guarantee are made to us in writing on or before _____________ (date of validity of the
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under]:
Please Mention here Complete Postal Signature of
Address of the Bank with Branch Code, Bank’s Authorized Signatory
Telephone and Fax Nos. with Official Round Seal
EW- 266 PUR-F-006 RFQ-
List of Banks for acceptance of Bank Guarantee as security deposit(SD)/ EMD :
As per Finance department GR No: FD/MSM/e-file/4/2024/2589/DMO dt: 01.05.2025
2. A U Small Finance Bank
3. Bandhan Bank
4. Barclays Bank
5. City Union Bank
7. DBS Bank India Limited
9. Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
16. IDFC First Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
27. Ahmedabad Mercantile Co-Operative Bank
28. Nutan Nagrik Sahakari Bank Ltd.
29. Rajkot Nagrik Sahakari Bank Limited.
30. Sarswat Co-Operative Bank Ltd.
31. SBPP Co-operative Bank LTD
32. SVC Co-Operative Bank Ltd.
33. The Cosmos Co-op Bank Ltd.
34. The Gujarat State Co-Operative Bank
35. The Mehsana Urban Co-Operative Bank Ltd.
36. The Surat District Co-operative Bank
37. The Surat Peoples Co-operative Bank Ltd.
38. The Kalupur Commercial Co-operative Bank
39. The Panchmahal District Co-operative Bank
40. The Baroda District Co-operative Bank
41. Baroda Gujarat Gramin Bank
42. Saurashtra Gramin Bank
EW- 266 PUR-F-006 RFQ-
EMD BANK GUARANTEE FORMAT
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300)
(Name and Address of the Firm) having their registered Office at
_________________________________________________(Address of the Firm’s registered Office)
(hereinafter called the Tenderer) wish to participate in the Tender No.__________________________
for______________________________________ of (supply / Erection / Supply & Erection / Work) of
__________________________________ (Name of the material / equipment / work) for
_________________________ Gujarat State Electricity Corporation Limited and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs. _____________ (Amount of EMD) valid till
____________ (mention here date of validity of this Guarantee which will be 4 (FOUR) months
beyond initial validity of Tender’s offer) which is required to be submitted by the Tenderer along
with the Tender.
(Name of the Bank and address of the Branch giving the Bank Guarantee) having our registered Office
at _____________________ (Address of Bank’s registered Office) hereby give this Bank Guarantee No.
_________________dated ____________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation Limited or any Officer
authorized by it in this behalf any amount not exceeding Rs.____________ (amount of EMD) (Rupees
State Electricity Corporation Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the tender or part thereof by the Tenderer within its validity or non-submission of
Security Deposit by the Tenderer within one month from the date of tender or a part thereof has been
accepted by the Gujarat State Electricity Corporation Limited would constitute a default on the part of
the Tenderer and that this Bank Guarantee is liable to be invoked and encased within its validity by the
Beneficiary in case of any occurrence of a default on the part of the Tenderer and that the encased
amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of____________________
(mention here the date of validity of Bank Guarantee) and shall not be terminated by notice or by
Guarantor change in the constitution of the Bank or the Firm of Tenderer or by any reason whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or variations
or alterations made, given, conceded with or without our knowledge or consent by or between the
EW- 266 PUR-F-006 RFQ-
Tenderer and the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice
this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL or Subsidiaries).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to
Our Guarantee shall remain in force till _____________ (date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ___________
(date of validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under.
Please mention here complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s authorized
Telephone and Fax Nos. Signatory with Official Seal.
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED- GTPS
To create an environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their
users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations
standards in business and professions. from outside GSECL to influence its
Ensure maximum transparency to the Not to use intimidation, threat, inducement
satisfaction of stakeholders. or pressure of any kind on GSECL OR ANY
OF it’s employees under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in fulfilling
agreement/contract and to consider the contract, agreement, legal obligations.
objectively the view point.
To ensure regular and timely release of To provide goods and / or services timely
payments on due dates for work done. as per agreed quality and specifications at
minimum cost to GSECL.
To ensure that no improper demand is To abide by the general discipline to be
made by employees or by anyone on maintained in our dealings.
To give maximum possible assistance to To be true and honest in furnishing
all the Vendors/Suppliers/Service information.
Provider and other to enable them to
complete the contract in time
To provide all information to Not to divulge any information, business
suppliers/contractors relating to details available during the course of
contract / job which facilitate him to business relationship to others without the
complete the contract / job successfully written consent to GSECL.
To ensure minimum hurdles to vendors Not to enter into carter / syndicate
/ suppliers / contractors in completion /understanding whether formal / non
of agreement / contract / work order. formal so as to influence the price.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
EW- 266 PUR-F-006 RFQ-
On Firm’s Letter Head
CERTIFICATE – A
I / We ________________________________________________ authorized signatory of
M/s. _____________________________________________ is not related with other firms who have
submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
With Designation
Seal of the Firm
EW- 266 PUR-F-006 RFQ-
GENERAL GUIDELINES RELEVANT TO I.S.
SPECIAL CONDITIONS FOR USE OF CEMENT
APPROVED NAME OF MANUFACTURERS OF
EW- 266 PUR-F-006 RFQ-
GENERAL GUIDELINES RELEVANT TO IS
Please refer latest edition of relevant Indian Standard Specification of Code i.e. B.I.S.
General relevant I.S. of B.I.S. shall prevail for all items including materials,
measurements etc.
The Item wise detailed specifications are intended for full description of items covered by
Schedule “B”. The specifications are not however intended to cover every detail and the
works shall be executed according to the spirit of the specifications below and the best
prevailing P.W.D. practice. The clarification to any clause in detailed specifications shall be
sought from the latest edition of relevant I.S. specification and codes. Where these
specifications are at variance with the specification laid down in the I.S. Books stated
above, the former will be applicable. As regarded matters not covered by any of the
above specification, the decision of the Engineer-in-charge shall be treated as final and
shall be binding upon the contractor. The contractor is expected to get clarified any doubt
about specification, etc. before tendering by discussing with Engineer-in-charge.
For detail technical specification, the item wise description along with above general
specifications shall hold good.
Chief Engineer (Gen)
Signature Of Contractor
EW- 266 PUR-F-006 RFQ-
SPECIAL CONDITIONS FOR USE OF CEMENT IN WORK
1 The rates in Schedule – ‘B’ is inclusive of cement cost. Contractor has to purchase
fresh 43 grade cement confirming to as per IS 8112 Or PPC IS 1489 (Part-I) or as per
tender condition.
2 Contractor has to construct pucca Go down at site of work so that cement bags can be
properly preserved to avoid damage due to any kind of water/Humidity.
3 Contractor has to bring sufficient quantities of cement bags to maintain progress of
work. The work should not suffer for want of cement.
4 Cement should be used to achieve required strength in cement concrete or as per item
5 To bring sufficient & timely cement at site is full responsibility of contractor. Nothing
extra will be paid on account of any reason to maintain progress of work and to
complete the work in schedule time.
6 Contractor has to submit material A/c. For consumption of cement used with every bills.
In case of not submitting the same, bill will not be passed. Party has to submit the copy
of cement purchased bill and Challan/invoice along with each RA Bill/Final Bill.
7 No negative variation will be allowed for consumption in cement less then prescribed as
per R & B SoROR Corporation/mix design and nothing will be paid extra for over
8 Contractor is fully responsible for safety of cement at site; nothing will be paid extra on
account of safety.
9 If Corporation’s authorized representative wants to check cement stock at site,
contractor has to allow for the same at any time.
10 Contractor has to maintain day to day cement consumption / balance account at site.
11 As far as possible, contractor has to maintain supply of cement of only one brand &
grade throughout the work and on account of closer/shortage of approved brand,
cement of other brand in accordance of condition No. (1) Will be allowed by Engineer –
12 Minimum cement consumption considered for cement concrete having grade of M–15 /
M – 20 / M – 25 is 320 Kgs. / 375 Kgs / 400 Kgs. Respectively. Contractor has to use
minimum cement as above. Contractor should not use less than the prescribed
quantities of cement even in the case of mix design recommends lower quantity. For
other items cement consumption shall be as per provisions of SoR without any negative
variation. Nothing will be paid extra for over consumption.
13 Contractor will be allowed to carry out work only after physical verification of cement
brought at site.
14 Full cement bags brought by contractor shall be entered at IN GATE of
Gayatri/Control/Sangol of Wanakbori, TPS.
Chief Engineer (Gen)
Signature Of Contractor
EW- 266 PUR-F-006 RFQ-
Approved Name of Firms of Manufactures of Civil Items Allowed to use being
supplied by contractors in civil works
Sr. Name of approved Vendor List of Company & their Brand Name in Market
01 A.C.C. Cement A.C.C
02 Ambuja Cement Ambuja
03 Binani Cement Binani
04 Birla Cement Birla A-1
05 Gujarat Sidhee Cement Sidhee
06 J.K. Cement J.K.
07 J.K. Laxmi Cement J.K.Laxmi
08 Sanghi Cement Sanghi
09 Saurastra Cement Hathi
10 Shree Digvijay Cement (SDCC) Kamal
11 India Cement Corromandal King
12 Ultratech Cement (L&T) Ultra-tech
13 HI-BOND Cement Hi-Bond
14 Shree Cement Limited Shree/Bangur/Rock
Strong/Roofon/Bangur Power
15 Midland Concrete Pvt. Ltd., Rajkot S O L ID
CONSTRUCTION CHEMICALS
01 RedWop Chemicals Rajkot
02 Samrock Chemicals Ahmedabad
Water Proofing &Wrapping Coating
01 Bitumag Industries Vadodara
02 A.R. Industries Vadodara
03 Tiki Tar Danosa (India) Pvt. Ltd. Halol
04 STP Ltd., Ankleshwar
01 Asian Granito Sabarkantha
02 Somany Kaloal
03 Simpolo Morbi
04 Varmora Morbi
05 Sunheart Morbi
07 Cengres Ahmedabad
EW- 266 PUR-F-006 RFQ-
01 Tata Iron & Steel Co. Ltd TATA
02 Jindal Jindal
03 Lloyds Llyods
04 Essar Steel Ltd. Essar
05 Steel Authority of India. SAIL
06 Parmeshwar Steel Pvt ltd. God TMT
07 Gallant Ispat Ltd. Gallant TMX
08 Aditya Ultra Steel Pvt. Ltd. KAMDHENU NXT & Kay 2 TMT
09 Mono steel India Ltd. MONO TMT
10 Aashiana Rolling Mills Ltd. Friends Steel
11 Electro Therm (I) Ltd. ET TMT
12 H.K. Ispat .Pvt. Ltd. Kothi
13 SRJ peety steel Pvt. Ltd. SHREE OM TMT/SRJ TMT/KAPILA
14 NilkanthConcast Private Limited Nilkanth
15 Shreeyam Power & Steel Industries National
16 Utkarsh Bars Private Limited Utkarsh
17 Bhagyalaxmi Rolling Mill Pvt. Ltd Polad
18 ShriKhatuShyam Alloys Pvt. Ltd., Khatu TMT
19 Steefo Steels LLP, Ahmedabad STEEFO TMT
20 Haq Steel &MetaliksLtd.,Kutch GERMAN TMX
21 K.B. Ispat Private Ltd., Bhavnagar KB TMT
22 VMS TMT Private Ltd., Ahmedabad KAMDHENU NXT & Kay 2 TMT
23 BriskonMultimetals LLP
24 Kalika Steel Alloys Pvt. Ltd., Jalna KALIKA 500 TMT
25 Anjar TMT Steel Pvt.Ltd.,Anjar Welspun Shield
26 ShriBajrang Power &Ispat Ltd. Goel TMT & Pipes
27 Rajuri Steels &TMT Bars Pvt. Ltd. Rajuri Steel
28 SMW Steel Sangam
29 Rathi Steel & Metal Pvt. Ltd. Icon Steel
30 MetarollsIspat Pvt. Ltd. Metarolls TMT
31 SaiBandhanInfinium Pvt. Ltd., BANDHAN TMX
32 Gajkesari Steels & Alloys Pvt. Ltd GAJKESARI TMX
33 Rudra Global Infra Product Ltd., RUDRA TMX
34 Varrsana Ispat Ltd.,Gandhidham VARRSANA TMT
35 Jay Bharat Steel Corporation, Kutch JAY BHARAT TMX &
36 Jideep Ispat & Alloys Pvt Ltd, Indore MOIRA CRS &TMT
37 N.N. Ispat Pvt. Ltd., West Bengal U L T R AMAX TMT
38 R S VIRLA Pvt Ltd, Rajkot R S VIRLA TMT & R STMT
In addition to the above Approved Vendor List of GSECL, the approved vendor list of GUVNL
and its subsidiary company i.e. GSECL/GETCO/MGVCL /PGVCL/DGVCL & UGVCL which
are available on their website- in tender head including above mention various manufacturers
are also to be treated as Approved Vendors.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LTD
GANDHINAGAR THERMAL POWER STATION
GANDHINAGAR-388239
Name of Work “Providing Service on job work for cement used repairing
item, for carpentry work & plumbing work for civil colony
at Gandhinagar TPS..”
DEVIATION FROM BIDDER (IF ANY)
1. GSECL does not bind to accept the deviation offered by bidder for evaluation of tender.
2. If there is any deviation from bidder, it should be clearly mentioned on this page.
3. Deviation mentioned on other page should not be considered and order will be placed according to
the tender documents.
4. If there is no any deviation from bidder, than it must be clearly mentioned in this page “NO
DEVIATION OFFERRED”
Signature of the Contractor
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LTD
WANAKBORI THERMAL POWER STATION
PO :THERMAL, TA:GALTESHWAR,
DI:KHEDA-388239
Name of Work “Providing Service on job work for cement used repairing item,
for carpentry work & plumbing work for civil colony at
Gandhinagar TPS..”
(UNDERTAKING IN REGARD TO STOP DEAL / BLACK LIST
All Bidders will have to furnish the following Undertaking duly filled in, signed and stamped for
each quoted item of the Tender along with the Technical Bid.
Sub:- Undertaking in regard to Stop Seal / Banned for Business Dealing / Black List Thereof.
Ref:- Tender No:
Authorized signatory of M/s. _________________________________ _____________
And their proprietor / any partner / any directors of the firm is not stop deal and/or banned for
business dealing and/or black listed by GUVNL and/or their any subsidiary company viz. GSECL
/ GETCO / DGVCL / MGVCL / UGVCL / PGVCL”.
Seal of the Firm.
Signature of the Tenderer.
EW- 266 PUR-F-006 RFQ-
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATION
DETAILED TECHNICAL SPECIFICATION.
EW- 266 PUR-F-006 RFQ-
GENERAL SPECIFICATIONS
01. In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved”
by the Engineer-in-charge.
02. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
03. In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points or
aspects in the relevant Indian Standards shall be referred to.
04. All measurements and computations, unless otherwise specified, shall be carried out as per
05. The distance which constitutes lead shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
06. Where no lead is specified, it shall mean “all leads”.
07. Lift shall be measured from plinth level.
08. Up to “floor two levels” means actual height of floor up to 6.5 Mt. Above plinth level.
09. Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specification shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material
and prefix ‘M’ e.g. ‘M-5’.
11. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to
any payment or compensation whatsoever on account of any such materials being rejected by
the Engineer-in-charge.
12. The contract rate of the item of work shall be for the work completed in all respects.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign
matter and to ensure the preservation of their quality and fitness for the work.
15. Cement, reinforcements bars & all other materials to be used shall be got approved from EIC
before starting of work. The cement, reinforcement steel & other materials to be brought at
site shall be entered at GANDHINAGAR, TPS main entry gate.
16. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
17. No materials shall be stored prior to, during and after execution of a structure in such a way as
to cause or lead to damage or overloading of the various components of the structure.
18. All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
19. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
20. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
21. Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any
adverse effects and consequences of adopting the same in the course of execution of
completion of the work.
EW- 266 PUR-F-006 RFQ-
22. All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
23. The contractor shall be responsible for observing the rules and regulations imposed under
‘Minor Minerals Act’ and such other laws and rules prescribed by Government from time to
24. All necessary safety measures and precaution [including those laid down in the various relevant
Indian Standards shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
25. The testing charge of all materials shall be borne by the Contractor unless recovery at one
percent towards using charges is separately made.
26. Approval to any of the executed items for the work does not in any way relieves the contractor
of his responsibility for the correctness, soundness and strength of the structure as the
drawings and specification.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
TECHNICAL SPECIFICATIONS
NAME OF WORK: “Providing Service on job work for cement used repairing item, for carpentry work
& plumbing work for civil colony at Gandhinagar TPS..”
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from objectionable
quantities of silt and traces of oil and injurious alkalies, salts, organic matter and other deleterious material which
will either weaken the mortar or concrete or cause efflorescence or attack the steel in R.C.C Container for
transport, storage and handling of water shall be clean. Water shall conform to the standards specified I.S 456-
1.2 If required by Engineer-in-charge it shall be tested by comparison with distilled water. Comparison shall
be made by means of standard cement tests for soundness, time of setting and mortar strength as specified in
I.S.269-1976. Any indication of unsoundness, change in time of setting by 30 minutes or more or decrease of
more than 10 per cent in strength of mortar prepared with water sample when compared with the results obtained
with mortar prepared with distilled water shall be sufficient cause for rejection of water under test.
1.3 Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be free of
elements which significantly affect the hydration reaction or otherwise interfere with the hardening of concrete
during curing or those which produce objectionable stains or other unsightly deposits on concrete or mortar
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland cement as per I.S. 8112 or Pozzolana Portland cement as per I.S.
6.1 Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from injurious
amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic matter, loam, mica or other
deleterious substance and shall be got approved from the Engineer-in-charge. The sand shall not contain more
that 8 percent of silt as determined by field test. If necessary the sand shall be washed to make it clean.
6.2 Coarse Sand: The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed 3.0.
The sieve analysis or coarse shall be as under:
I.S. Sieve Percentage by I.S. Sieve Percentage by weight
Designation weight Designation Passing sieve
6.3 Fine Sand : The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as
I.S. Sieve Percentage by I.S. Sieve Percentage by weight
weight Passing through
Designation Passing through Designation
M-11. Cement Mortar :
11.1 Water shall conform to specification M-1. Cement :Cement shall conform to specification M-3.Sand :
Sand shall conform to M-6.
11.2 Proportion of Mix : 11.2.1 Cement and sand shall be mixed to specified proportion, sand being measured
by measuring boxes. The proportion of cement will be by volume on the basis of 50 Kg./Bag of cement being
equal to 0.0342 Cu. M. The mortar may be hand mixed or machine mixed as directed.
11.3 Preparation of Mortar: 11.3.1 In hand mixed mortar cement and sand in the specified proportions shall be
thoroughly mixed dry on a clean impervious platform by turning over at least 3 times or more till a homogenous
mixture of uniform color is obtained. Mixing platform shall be so arranged that no deleterious extraneous material
shall get mixed with mortar or mortar shall flow out. While mixing, the water shall be gradually added and
thoroughly mixed to form a stiff plastic mass of uniform color so that each particle of sand shall be completely
covered with a film of wet cement. The water cement ratio shall be adopted as directed.
EW- 266 PUR-F-006 RFQ-
11.3.2 The mortar so prepared shall be used within 30 minutes of adding water. Only such quantity of mortar
shall be Prepared as can be used within 30 minutes.
M-12 Stone Coarse Aggregate for Nominal Mix Concrete:
12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard, strong, dense,
durable, clean and free from skin and coating likely to prevent proper adhesion of mortar.
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular quarries are
mentioned aggregates shall be machine crushed from the best black trap or equivalent hard stone as approved.
Aggregate shall have no deleterious reaction with cement. The size of the coarse aggregate for plain cement
concrete and ordinary reinforced cement concrete shall generally be as per the table given below, However in
case of reinforced cement concrete the maximum limit may be restricted to 6 mm. Less than the minimum lateral
clear distance between bars or 6 mm. Less than the cover, whichever is smaller.
I.S. Sieve Percentage passing for single I.S. Sieve Percentage passing for single
Designation sized aggregates of nominal Designation sized aggregates of Nominal
Note: This percentage may be varied somewhat by Engineer-in-charge when considered necessary for
obtaining better density and strength of concrete.
12.3 The grading test shall be taken in the beginning and at the change of source of materials. The necessary
test indicated in I. S. 383-1970 and I.S. 456-2000 shall have to be carried out to be carried out to ensure the
acceptability. The aggregates shall be stored separately and handled in such a manner as to prevent the
intermixing of different aggregates. If the aggregates are covered with dust, they shall be washed with Water to
make them clean.
M-13. Black Trap or Equivalent Hard Stone Coarse.
13.1. Aggregate For Design Mix Concrete : Coarse aggregate shall be of machine crushed stone of black
trap or equivalent hard stone and be hard strong dense, durable clean and free from skin and coating
likely to prevent proper adhesion of mortar.
13.2. The aggregates shall generally be cubical in shape. Unless special stones of particular quarries are
mentioned, aggregate shall be machine crushed from the best, black trap or equivalent hard stones as
approved. Aggregate shall have no deleterious reaction with cement.
13.3. The necessary tests indicated in I.S. 383-1970 and I.S. 456-2000 shall have to the carried oat to
ensure the acceptability of the material.
13.4. If aggregate is covered with dust it shall be washed with water to make it clean.
M-18. Mild Steel Bars
18.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S, 432 (Part-II) 1966 and §hail be
of tested quality. It shall also comply with relevant part of I.S. 456-
18.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose or thick rust at the
time of placing.
18.3 For the purpose of payment, the bar shall be measured correct up to 100 mm length and weight payable
worked out at the rate specified below:
1. 6 mm. 0,22 Kg./Rmt. 8 20 mm. 2.47 Kg./Rmt.
M-19A High Yield Strength Steel Deformed Bars:
19.1 High yield strength steel deformed bars be either cold twisted or hot rolled, shall conform to I. S. 1739-
1966 and I. S. 1139-1966 respectively.
19.2 Other provision and requirements shall conform to specification No. M-18 for mild steel bars.
M-19B TMT BARS:
19.1 TMT BARS shall confirm to I.S. 1786-1985 of Fe- 500/500D Grade or above form Approved quality.
19.2 Other provision and requirements shall conform to specification No. M-18 for mild steel bars.
M-21 Mild Steel Binding Wire:
21.1 The mild steel wire shall be of 1.63 mm. or 1.22 mm. (16 or 18 gauge) diameter and shall conform to I. S.
EW- 266 PUR-F-006 RFQ-
21.2 The use of black wire will be permitted for binding reinforcement bars. It shall be free from rust, oil paint,
grease, loose mill scale or any other undesirable coating which may prevent adhesion of cement mortar.
M-22 Structural Steel:
22.1 All structural steel shall conform to I. S. 226-1965. The steel shall be free from the defects mentioned in I.
S. 226-1975 and shall have a smooth finish. The materials shall be free from loose mill scale, rust pits or other
defects affecting the strength and durability. Rivet bars shall conform to I. S. 1148-1973.
22.2 When the steel is supplied by the Contractor test certificates of the manufactures shall be obtained
according to I. S. 226-1975 and other relevant Indian Standards.
M-26. Shuttering
26.1. The shuttering shall be either of Wooden planking of 30 mm. minimum thickness with or without steel lining
or of steel plates stiffened by steel angles. The shuttering shall be supported on battens and beams and props of
vertical bellies properly cross braced together so as to make the centering rigid. In places of bullies props, brick
pillar of adequate section built in mud mortar may 6e used.
26.2. The form work shall be sufficiently strong and shall have camber, so that it assumes correct shape after
deposition of the concrete and shall be able to resist forces caused by vibration of live load of men working over it
and other incidental loads associated with it. The shuttering snail have smooth and even surface and its joints
shall not permit leakage of cement grout.
26.3. If at any stage of work during or after placing concrete in the structure, the form work sags or bulges out
beyond the required shape of the structure, the concrete shall be removed and work redone with fresh concrete
and adequately rigid form work. The complete form work shall be got inspected by and got approved from the
Engineer-in-charge, before the reinforcement bars are placed in position.
26.4. The props shall consist of bullies having 100 mm. minimum diameter measured, at mix length and
80 mm, at thin end and shall be placed as per design requirement. These shall rest squarely on wooden sole
plates 40 mm; thick and minimum bearing are if 0.10 sq. m. laid on sufficiently hard base.
26.5. Double wedges shall further be provided between the sole plate and the wooden props so as to facilitate
tightening and easing of shuttering” without jerking their concrete.
26.6 The timber used in shuttering shall not be so dry as to absorb water from concrete and swell or bulge nor
so green or wet as to shrink after erection. The timber shall be properly sawn and planed on the sides
and surface coming in contact with concrete. Wooden form work with metal sheet lining or steel plates
stiffened by steel angles shall be permitted.
26.7 As far as practicable, clamps shall be used to hold the forms together and use of nails and spikes avoided.
26.8 The surface of timber shuttering that would come in contact with concrete shall be well wetted and coated with
soap solution before the concreting is done. Alternatively coat of raw linseed oil or oil of approved
manufacturer may be applied in place of soap solution. In case of steel shuttering either soap solution or
raw linseed oil shall be applied after thoroughly cleaning the surface. Under no circumstances black or
burnt oil shall be permitted.
26.9 The shuttering for beams and slab’s shall have camber of 4 mm. per meter (1 in 250) or as directed by the
Engineer-in- charge so as to offset the subsequent deflection. For cantilevers, the camber at free end shall be
1/50 of the projected length or as directed by the Engineer-in-Charge.
44.1 (A) Oil paints:
44.1.1. Oil paints shall be of the specified colour and shade, and as approved. The ready mixed paints shall only
be used. However, if ready mixed paint or specific shade or tint is not available, white ready mixed paint with
approved strainer will be allowed. In such a ease, the contractor shall ensure that the shade of the paint so
allowed shall be uniform.
44.1.2. All the paints shall meet with following general requirements:
(i) Paint shall not show excessive setting in a freshly opened full can and shall easily be redispressed with a
paddle to a smooth homogeneous state. The paint shall show no curdling, livering, caking or colour separation
and shall be free from lumps and skins.
(ii) The paint as received shall brush easily, possess good leverling properties and show no running or sagging
(iii) The paint shall not skin within 48 hours in a three quarters filled closed container.
(iv) The paint shall dry to a smooth uniform finish free from roughness, grit, unevenness and other
44.1.3. Ready mixed paint shall be used exactly as received from the manufacturers and generally according to
their instructions and without any admixtures whatsoever.
44.2. (B) Enamel Paints:
44.2.1. The enamel paint shall satisfy in general requirements as mentioned in specification of oil paints. Enamel
paint shall conform to I.S. 2933-1975.
EW- 266 PUR-F-006 RFQ-
Technical Specification
Providing services to attend the complaints regarding Mason/ Carpenter/ Plumber / Welder
(A) mason work for repairing the damaged portion of cement used items i.e masonry work
plaster work, patch work etc. (B) plumber for plumbing items for G. I. Pipe, UPVC pipe,
CPVC pipe, C I Pipe line leakages etc.(C) carpenter attend the complaints regarding
carpentry work i.e. repairing of doors, windows, cupboards for colony quarters and public
building. (D) welding work, fabrication work for repairing the damaged portion of steel
frame for door, window cupboard, gate roofing work & fabrication work for shed etc. to
attend the complaints regarding of colony quarters and public building as directed by EIC &
as per requirement. Also as per requirement of the work which is more required will be
worked/operated from this quantity. The work shall be carried out as and when necessary &
item rate includes one job. i. e. one skilled mason/ Carpenter/ Plumber/ Welder with one
unskilled labor with each for one full day. (Eight hours shift). The agency has to arrange for
tools tackles, safety articles etc. required to carry out job work as per instruction of EIC of
work. The payment will be made per no’s of job work.Nothing extra to be paid for any
insurance or depreciation of tools etc. The necessary material will be supplied free of cost
by GSECL at GSECL Store.
The item includes the work of complains of colony quarters and public buildings, It includes to
attend the complaints regarding Mason/ Carpenter/ Plumber / Welder.
(A) The work of attending Repairing work plaster, RCC work, patch works, masonry, IPS, chajja
repairing, leakages from toilets, bath, rain water leakages from slab, making grooves,
crack sealing tub fixing, filling, tiles fitting, glazed tiles fitting and all other complain related
works at any height up to fourth floor.
(B) The work of repairing the damaged portion of G.I. pipe line and other items of Plumber
complains for colony quarters and public building. Items includes to attending all type of
G.I. pipe line, UPVC PIPE, PVC PIPE leakages, which is in below G.L., counseled in B.B.
Masonry or C.C. or tiles etc; and all other complain related works at any height up to
(C) the work of repairing the damaged portion of door, window, cupboard, ventilators and other
items of carpenter complains for colony quarters and public building. Items include to
attending all type of work and all other complains related works at any height up to fourth
(D) the work of repairing the damaged portion of door, window, cupboard, ventilators and
Other items of fabrication work of door framing & shutter & purlin, rafter etc, complains for
colony quarters and public building. Items include to attending all type of work and all
other complains related works at any height up to fourth floor.
Items include to attending all type of work and all other complains related works at any
height. Colony civil maintenance department shall issue the materials for completion of
above work but The agency shall be arranged for all tools, tackles, safety articles etc.
required to carry out job work as per the instruction of EIC. Nothing extra to be paid for
any insurance or depreciation of tools etc. For all these works skilled
carpenter/welder/plumber/mason is required as & when required. They have to maintain
complain allotted from civil office from complain register by his supervisor.They shall be
work for eight hours to solve complains allotted to them. There shall not be more change
without any difficulty. They shall have to be work strictly as per the instruction of EIC.
During emergency, Agency has to carry out work inside & outside area of colony as
directed by EIC. They should be well aware from quarter locations.The payment shall be
made per job of job work.
Job work for cleaning of drainage gutter line, catchpit and misc work with
labour(sweeper),hand bucket, lari & other required tool for completion of work i.e.Trikam,
Pavda, Rassa, G.T Salia, Battery etc as directed by EIC. Work to attend the various
complaint for colony gutter line, chamber etc. The sweeper for full day (eight hours) fo one
job. Nothing extra to be paid for any insurance or depreciation of tools etc.
Job work for cleaning of drainage gutter line, catchpit and misc work with labour(sweeper),hand
EW- 266 PUR-F-006 RFQ-
bucket, lari & other required tool for completion of work i.e.Trikam, Pavda, Rassa,G.T Salia,
Battery etc as directed by EIC. Work to attend the various complaint for colony gutter line,
chamber etc. Nothing extra to be paid for any insurance or epreciation of tools etc.The agency
shall be arranged for all tools, tackles, safety articles etc. required to carry out job work as per the
instruction of EIC. They shall be work for eight hours to solve complains allotted to them.They shall
have to be work strictly as per the instruction of EIC. During emergency, Agency has to carry out
work inside & outside area of colony as directed by EIC.The payment shall be made per nos. of
Item no.3 Labour charges to attend the work i.e. Housekeeping, cleaning work, gardening
work, loading/unloading work & any type civil maintenance work at inside colony area. The
work shall be carried out as and when necessary by engaging one unskilled labour full
day(Eight hours)work is engaged for such work with required tool tackles safety articles
etc.to carry out job work as per instruction of EIC. Nothing extra to be paid for any
insurance or depreciation of tools etc. The payment will be made as per day
The item includes the work of Housekeeping work cleaning work, gardening work,
loading/unloading work & related work to residence & garden at sachivaliya /dignitaries residence.
The agency shall be arranged for all tools, tackles, safety articles etc. required to carry out job
work as per the instruction of EIC. Nothing extra to be paid for any insurance or depreciation of
tools etc. For all these works unskilled labor (Helper) is required as & when. They shall be work for
eight hours to work allotted to them. They shall have to be work strictly as per the instruction of
EIC. During emergency, Agency has to carry out work inside & outside area of colony as directed
by EIC.The payment shall be made per Nos. of Job work
Item no.4 Job work for skilled civil supervision work in colony area. Skillset requirements
are site supervision, taking measurements, maintaining Daily progress reports of ongoing
The item includes supervision of Housekeeping work, cleaning work, gardening work,
loading/unloading work, taking measurements, maintaining Daily progress reports.. For all
these works skilled civil supervisor (minimum qualification is diploma civil) is required. They shall
be work for eight hours to work allotted to them. They shall have to be work strictly as per the
instruction of EIC. During emergency, Agency has to carry out work inside & outside area of
colony as directed by EIC. The payment shall be made per Nos. of Job work
Item no.5 Any item of GOG SOR(GOG SOR F Y 2024-25)
Work to be carried out as per Booklet for ‘General Technical specifications for building works’ of R
& B department, Items from GoG SOR FY 2024-25 & booklet of ‘General specification for Civil
works’ of GSECL will be applicable for relevant detail specifications of items shall be considered &
adopted in work.
The rate shall be for a unit of one Job.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
EW- 266 PUR-F-006 RFQ-
Name of Work: Providing Service on job work for cement used repairing item, for carpentry
work & plumbing work for civil colony at Gandhinagar TPS..
Sr. DESCRIPTION
No. Qty. Unit Rate Amt.
1 Providing services to attend the complaints
regarding Mason/ Carpenter/ Plumber / Welder
(A) mason work for repairing the damaged
portion of cement used items i.e masonry work
plaster work, patch work etc. (B) plumber for
plumbing items for G. I. Pipe, UPVC pipe, CPVC
pipe, C I Pipe line leakages etc.(C) carpenter
attend the complaints regarding carpentry work
i.e. repairing of doors, windows, cupboards for
colony quarters and public building. (D) welding
work, fabrication work for repairing the damaged
portion of steel frame for door, window cupboard,
gate roofing work & fabrication work for shed etc.
to attend the complaints regarding of colony
quarters and public building as directed by EIC &
as per requirement. Also as per requirement of
the work which is more required will be
worked/operated from this quantity. The work
shall be carried out as and when necessary &
item rate includes one job. i. e. one skilled
mason/ Carpenter/ Plumber/ Welder with one
unskilled labor with each for one full day. (Eight
hours shift). The agency has to arrange for tools
tackles, safety articles etc. required to carry out
job work as per instruction of EIC of work. The
payment will be made per no’s of job work.
Nothing extra to be paid for any insurance or
depreciation of tools etc. The necessary material
will be supplied free of cost by GSECL at GSECL
Store. 1000.00 Job 1477.00
2 Jobwork for cleaning of drainage gutter
line,catchpit and misc work with
labour(sweeper),hand bucket, lari & other
required tool for completion of work i.e.Trikam,
Pavda, Rassa,G.T Salia, Battery etc as directed
by EIC. Work to attend the various complaint for
colony gutter line, chamber etc. The sweeper for
full day (eight hours) fo one job. Nothing extra to
be paid for any insurance or depreciation of tools
3 Labour charges to attend the work i.e.
Housekeeping, cleaning work, gardening work,
loading/unloding work & any type civil
maintenance work at inside colony area.The
work shall be carried out as and when necessary
by engaging one unskilled labour full day(Eight
hours)work is engaged for such work with
required tool tackles safety articles etc.to carry
out job work as per instruction of EIC.Nothing
extra to be paid for any insurance or
epreciation of tools etc. The payment will be
made as per day 900.00 Job 723.00
EW- 266 PUR-F-006 RFQ-
4 Job work for skilled civil supervision work in
colony area. Skillset requirements are site
supervision, taking measurements, maintaining
Daily progress reports of ongoing works.
5 Any item of GoG SoR (GoG SoR FY 2024-25)
Total estimated amount Rs.
1 The rate of above all items are for any heights to carry out the various works at different
elevation or location irrespective of quantum of work and to be carried out as and when required
2 The GSECL will not be held responsible for any accident that may occur during carrying out the
3 The payment will be made on the base of quantity of actual work done.
4 The agency has to carry out the above all items in the running plant and due care has to be
taken from safety point of view. The GSECL will not be held responsible for any accident that
may occur during carrying out the works.
5 Penalty Clause: Contractor shall have to arrange manpower as per instruction of EIC. If the
contractor fails to arrange required skilled / unskilled labour, penalty shall be affected and net
recovery amount Rs.750.75 per labour per day for unskilled manpower and Rs. 783.75 for
skilled manpower shall be made from contractor bill for less number of labour.
6 The quantity of any item of schedule B is purely tentative and it may vary upto some extent and
utilise as per actual site requirement.
7 Above rates are exclusive of GST.
8 1% welfare cess will be applicable.
Chief Engineer (Gen)
Signature Of Contractor GSECL: GTPS
EW- 266 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
[email protected] Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
Safe Maintenance Procedure
NAME OF WORK: “Providing Service on job work for cement used repairing item, for carpentry work &
plumbing work for civil colony at Gandhinagar TPS...”
1. Scope: “ Providing Service on job work for cement used repairing item, for carpentry work &
plumbing work for civil colony at Gandhinagar TPS...”
1. Prohibit work on new and existing live circuits until all power is shut off and a positive permit to
work system is in place.
2. Do not use worn electrical cords or cables.
3. Use only 3-wire type extension cords.
4. Maintain all electrical tools and equipment in safe condition and check regularly for defects.
5. Remove broken or damaged tools and equipment from the jobsite.
6. Protect all temporary power (including extension cords) with circuit protection device.
7. Do not bypass any protection system or device designed to protect employees from contact
with electrical current.
8. Locate and identify overhead electrical power lines. Make sure that ladders, scaffolds,
equipment or materials never come into close proximity of electrical power lines.
9. Unsafe hand tools should not be used.
10. Impact tools, such as drift pins, wedges, and chisels, should be kept free of mushroomed
11. The wooden handles of tools should be kept free of splinters or cracks and should be kept tight
and fit in the tool
12. Electric power operated tools should either be of the approved double-insulated type and
clearly labeled or properly grounded using approved three-wire cord having the ground wire
permanently connected to the tool frame as a means for grounding the other end
13. All hydraulic or tools which are used on or around live power lines or equipment should be
equipped with suitable non-conducting hoses and properly maintained.
3. Work Procedure
(A) Disposal of building debris/waste/rubbish
1. Rubbish burning on worksites or cigarette butts left by workers igniting combustible waste on
site could cause fire.
2. Scrap wood or chips, saw dust waste, and paper bags or cartons should be removed from the
immediate work area as the work progresses.
3. All solvent waste, oily rags, and flammable liquids should be kept in fire resistant covered
containers until they are removed from the worksite.
1. provide stairways, ladders, ramps, or other safe means of egress to workplaces such as
working platforms position the means of egress within a reasonable distance from workers use
structural ramps solely for access or egress from excavations designed by a competent person ensure
that when two or more components form a ramp or runway, they must be connected to prevent
(C) Working platforms and Scaffolds
A contractor has to make and keep every place of work on construction site safe, and in particular, to
take suitable and adequate steps to prevent persons from falling from a height of 2m or more from
any of these structures
1. Provide safe access to and egress from all platforms.
EW- 266 PUR-F-006 RFQ-
2. Keep all work platforms free from load, such as construction wastes.
3. Suitably place platforms on sound base, such as scaffolds, to prevent displacements.
4. Prevent movement or tipping, especially surface dirt of platforms.
5. Erect and dismantle scaffolds and platforms only under the supervision of a competent person.
6. Each scaffold must be capable of supporting the load intended.
7. The competent person must inspect scaffolds before each use.
8. Use sound base plates to level or stabilize the footings.
1. Closely plank a scaffold to provide a safe working platform. The working platform decking must
be free from patent defects.
2. Extend planks or decking material sufficiently over the edges or cleat them to prevent
3. Avoid over extending the platform beyond the end supports to prevent tipping when workers
are stepping or working on it.
4. Avoid over extending the platform beyond the end supports to prevent tipping when workers
are stepping or working on it.
5. Be sure that working platforms are of a proper size and, for metal scaffolds, end hooks are
available and attached to the scaffold frame.
1. Secure ladders near the top and/or at the bottom to prevent them from slipping.
2. Place ladders at the proper angle (1:4 from base to vertical rise).
3. Extend ladders above the landing by 1 m.
4. Avoid using ladders near busy passageways or roads with busy car traffic, use other means or
otherwise fence off the area.
5. Keep ladders in good conditions and free of defects.
6. Check all ladders before use for broken rungs or other defects periodically.
(F) Cement and concrete Work
1. To protect skin from cement and cement grout, workers should wear:
2. suitable chemical resistant gloves
4. waterproof boots
5. suitable respiratory protective equipment against dusts, e.g. cement dust
6. suitable eye protectors such as shields and goggles with side-shields should be provided for
mixing, grouting, or cement and other activities
(G) Working with solvents and paints
1. Don’t touch solvents and paints with bare hands. Wear protective gloves.
2. Don’t try to suck solvents and paints with your mouth. Use appropriate liquid delivery tools.
3. Don’t use container with narrow opening as it traps heat and/or gases.
4. Don’t mix oxidizing agents with flammable/ combustible substances.
5. Don’t eat, drink and smoke while using solvents and paints.
Contractor supervisor reported to consult department site in charge engineer. After completion of
work all man and material removing from site and cleaning site as per direct site in charge.
EW- 266 PUR-F-006 RFQ-
JOB SAFETY ANALYSIS
JSA for: “Providing Service on job work for cement used repairing item, for Section:
carpentry work & plumbing work for civil colony at Gandhinagar TPS.” Civil Col
Job Step Hazard Risk Control responsibility
Plumbing, carpentry work Injury to High Wear Contractor
hands, safety supervisor
Prepared by Checked by Reviewed by Approved by
( ) SE ( ) Safety Officer Factory Manager Chief Engineer
EW- 266 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPES
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.:
Authorized signatory of M/s
Sr. No. Name of PPE IS: Code no. of PPE Make of PPE Qty Unit
1 Safety Helmet Nos.
2 Safety Goggles Nos.
3 Reusable ear Plug Pair
4 Dust Mask Nos.
5 Safety Shoes Pair
6 Hand Gloves Pair
7 Gum Boots Pair
lf our company is not provided above mentioned good quality of PPE's, Safety Officer and Factory
manager shall be empowered to stop the work without any notice.
Seal of the Firm
Signature of Authorized
EW- 266 PUR-F-006 RFQ-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-266_05_03_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .