Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.7 LAdmitted-Fee/PreQual/Technical/Finance KHUDIRAMPALLI WARD NO 04 AMARPUR GOMATI DISTRICT TRIPURA | GOMATI | TRIPURA | 799013 | -12.30% | ₹24.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.3 L+₹64,968.15 (2.63%)Admitted-Fee/PreQual/Technical/Finance SACHINDRA PARA WEST HARINA G P SABROOM SOUTH TRIPURA PIN 799143 | SABROOM | SOUTH TRIPURA | TRIPURA | 799143 | -9.99% | ₹25.3 L+₹64,968.15 (2.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹25.6 L+₹93,092.89 (3.77%)Admitted-Fee/PreQual/Technical/Finance | -8.99% | ₹25.6 L+₹93,092.89 (3.77%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹29.8 L+₹5.1 L (20.9%)Admitted-Fee/PreQual/Technical/Finance | +5.99% | ₹29.8 L+₹5.1 L (20.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹28.1 L
EMD Value
₹56,249
Closing Date
7 Aug 2026, 3:00 pmClosed
Executive Engineer, DWS Division, Amarpur,
O/O The Executive Engineer, DWS Division, Amarpur,
Water Supply Scheme of JJM under Ampi RD Block /SH-Construction of 2(Two) Nos. intermediate PVC Water Storage tank (40000 Litre capacity) in/c electrical panel board and other allied works etc. at Tangpaiya Para and Rangjuha para of Ekjancherra VC un
2026_CEDWS_75117_1
31/DNIeT/EE/DWS/AMP/2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Ampi
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹56,249
28 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
31 Jul 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kind of soils. | - | Cum | 231.6 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kind of soil | - | Cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - i) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 8,980 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | Cum | 11,080.4 | - |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for :i) Foundations, footings, bases for columns etc. for mass concrete with timber plank for foundation trenches | - | sqm | 333.9 | - |
| 6.01 | ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 1 | sqm | 391 | ₹390.61 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding allcomplete above plinth level. i) Thermo-Mechanically Treated bars of grade Fe-500D or more | - | kg | 103.9 | - |
| 8 | First class brick work in foundation and plinth including cost of all materials as required complete:- i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 1 | cum | 9,845.2 | ₹9,835.35 |
| 9 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete: i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | 11,410.19 | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.PDF
pdf • 1.81 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.87 MB
FDNIeT31.pdf
Tender Documents • 4.02 MB
BOQ_76471.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .