ADDITIONAL CITY ENGINNER - SOUTH ZONE (AMC)
Repair Works Of Breakdown of Drainage Lines and Storm Water Lines in Various Wards of South Zone (ARC)
339794
AMC SZ - TN 05/ 2026-27 ; T.No 326
Open
Miscellaneous Works
Works
Ahmedabad
₹6,000
Municipal Commissioner, Ahmedabad
₹5 L
28 Aug 2026
28 Aug 2026
28 Aug 2026
7 Sept 2026
28 Aug 2026
(4) Date of e-Tender (Technical Bid) Opening : Dt. 08-09-2026 upto 17.00hours
(5) Date of e-Tender (Price Bid) Opening : To be intimated after technical
echnical bid evaluation
AUTHORITY ENGINEER
DEPUTY MUNICIPAL COMMISSIONER ADDITIONAL CITY ENGINEER
SOUTH ZONE SOUTH ZONE
AHMEDABAD MUNICIPAL CORPORATION AHMEDABAD MUNICIPAL CORPORATION
SOUTH ZONE OFFICE SOUTH ZONE OFFICE
Dr SHYAMA PRASAD MUKHRJEE BHAVAN Dr SHYAMA PRASAD MUKHRJEE BHAVAN
OPP. MANINAGAR FIRE STATION, RAMBAG OPP. MANINAGAR FIRE STATION, RAMBAG
AHMEDABAD – 380008 AHMEDABAD –
A-1 : SLA PENALTY CLAUSE
A-2 : GENERAL INSTRUCTION FOR BOQ
A-3 : BILL OF QUANTITIES
A.1 Penalty Clause for SLA
Department Category Problem for
1 Engineering Drainage Drainage- Manhole Cover Missing 24
Drainage- Frequent breakdown &
2 Engineering Drainage 96
Blockage of drain
3 Engineering Drainage Drainage-Other 48
4 Engineering Drainage Drainage- Choking Of Line 48
Drainage-Public Toilets and
5 Engineering Drainage Urinals - Drainage Line Blockage 72
Building-Municipal Schools
6 Engineering Building 168
Public Building-Public Toilets and
7 Engineering Urinals - Repairing of Doors, 360
Windows, Tiles or Sheets
8 Engineering No water supply in public building 24
9 Engineering Footpath Road-Footpath Repairing 168
10 Engineering Road Road-Bhuva On Road 48
11 Engineering Road Road-Other 48
12 Engineering Road Road-Repair Require 72
13 Engineering Road Road-Potholes on the road 24
Road- Deep pit large settlements of
14 Engineering Road 48
Road- Removing of waste-dust
15 Engineering Road from both side of road after 72
resurfacing work
16 Engineering Road-Waterlogged Due To Rain 24
17 Engineering Road-Catch Pit Repairing 96
18 Engineering Water Water-Pollution In Supply 24
19 Engineering Water Water-Leakage In Main Line 48
20 Engineering Water Water -Other 72
21 Engineering Water Water-low pressure 240
22 Engineering Water Water-No Supply 240
Water-Requirement of Water
23 Engineering Water 6-12
Drainage- overflowing of mainline
24 Engineering Drainage 48
and distribution line on road
Note: If the total penalty amount goes above 10.00% of sanctioned tender amount, the said tender will
be called off & will be reinvited for the same at that particular stage of tender.
Seal and Signature of the Bidder Add. City Engineer
A.2 General Instruction for the BOQ
1. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders, Conditions of Contract,
Technical Specifications.
2. The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its
own responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidders own expense. No claim in
future for unknown with the site by the bidder shall be granted in any case.
3. The quantities given in the Bill of Quantities are estimated and provisional and are given to provide a common
basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as
measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced
Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the
terms of the Contract. Contractor shall not raise any claim for too less or too more quantities executed by
him. Quantity may vary with respect to BOQ as well as place of work also may change cited in the
4. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is otherwise, provided under the
Contract, include all constructional plant, labour, supervisions, materials, all temporary works and false works,
erection, maintenance, establishment and overhead charges, profit, any taxation and levies, octroi and other
charges together with all general risks, liabilities and obligations set out or implied in the Contract and
including remedy of any defects during the Defects Liability Period.
5. The stipulated rates in BOQ are entirely in India Rupee Currency.
6. Rates shall be entered both in figures and words against total amount of Bill of Quantities. However, Items
6. Rates shall be entered both in figures and words against total amount of Bill of Quantities. However, Items
(for which rate has been provided) against which no quantity is entered will be paid for by the Employer on
actual measurement onsite when executed.
7. The whole cost of complying with the provisions of the Contract shall be deemed to have been included in the
items provided in the priced Bill of Quantities.
8. General directions and descriptions of work and materials are not necessarily repeated or summarized in the
Bill of Quantities. Reference to the relevant sections of the contract documentation shall be made before
quoting the bid against each item in the Bill of Quantities.
9. The method of measurement of completed work for payment shall be in accordance with the requirement as
stated in the individual sections of the Technical Specifications.
10. Contractor shall credit the material dismantled during the work in progress in AMC store suggested by
Engineer in charge of the work.
11. AMC reserves the right to decrease the scope of work or to incase of any condition. AMC may start it after
approval of competent authority.
Detailed technical specification for all the Items above shall be relevant to PWD manual general material specification
there in during the construction period of the contract. Contractor should adhere to the specifications and same shall be
considered as the tender document.
In case of any discrepancy the decision of engineer in-charge shall be considered as final.
In case of any dispute the decision of City Engineer shall be considered as final.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
A.3 BILL OF QUANTITIES
AHMEDABAD MUNICIPAL CORPORATION
Name Of work :- REPAIRING WORK OF BRECKDOWN AND DRAINAGE LINE AND STROM WATER
LINE IN VARIOUS WARDS OF SOUTH ZONE (ARC)
Items Qty Unit GST (Rs.)
Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using siterails and stacking
1 excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as
specified and direction of engineer incharge. In all
sorts of soil and soft murrum (GWSSB SOR 2022-23
Part 1-B Item No.1 Page 32)
a Upto 1.50 mt depth 5000.00 Cmt 89.00
b 1.5 mt to 3 mt depth 3500.00 Cmt 98.00
c 3.00 mt to 4.50 mt depth 3000.00 Cmt 103.00
d 4.50 mt to 6.00 mt depth 1000.00 Cmt 109.00
Conveyance charge of earth, lime, murrum, building
rubbish , manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc
complete. Internal conveyance above 50 mt done
within the work site is not payable. Note : Quantity
Shoud not be more then the quantity equal to
excavation minus back filling. (no bulkage) (R&B
Ahmedabad City SOR 2023-24 Statement 5 Item Code
030201A2 Page No.6)
a Lead up to1 Km. 100.00 Cmt 320.20
b Lead From 1 Km to 2 Km. 100.00 Cmt 347.73
c Lead From 2 Km to 3 Km. 100.00 Cmt 370.53
d Lead From 3 Km to 4 Km. 100.00 Cmt 390.56
e Lead From 4 Km to 5 Km. 100.00 Cmt 408.41
f Lead From 5 Km to 10 Km. 50.00 Cmt 417.67
g Lead From 10 Km to 15 Km. 40.00 Cmt 425.67
Extra rate over item of excavation of earth if
excavation is to be done in wet condition without
3 resorting to pumping out incl. of bailing out of water. 1000.00 Cmt 17.86
(SOR-(Jan. 2016) Rates for work of Drainage / SWD
pipe line Drainage Work Item No.3 Page 1)
Demolition incl. stacking of serviceable materials &
4 disposal of unserviceable materials with all lead and
R.C.C. Work (20002, 20.3, Page 140) (R & B SOR
Brick work in cement mortar (20003B, 20.11, Page
Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and
lift. (20.23, Page 140) (R & B SOR 2023-24)
Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet,
5 metal, soiling /cutting reinforcement etc.comp. with
stacking the material as directed. (based on previously
approved rate by CE sir (AMC Drainage SOR Jan-
2016) and As per Road Project Rate W/O GST
a up to 0.20 meter thickness (By Manual) 5000.00 Smt. 71.10
Up to 0.30 meter (By any type of Breaker Machine or
b R.C.C.Cutter machine including cost of operator, fuel, 3000.00 Smt. 177.76
& transportation etc complete.
0.30 meter & above (By any type of Breaker Machine
c or R.C.C.Cutter machine including cost of operator, 2000.00 Smt. 311.08
fuel, & transportation etc complete.
Providing and laying cement concrete work 1:2:4 (1-
Cement: 2-Coarse sand:4-graded stone aggregates
20mm nominal size) and curing complete excluding
6 cost of formwork and rein for cement for reinforced 200.00 Cmt. 3661.30
concrete work in (A) Foundations,footings, Base or
columns and Mass concrete (upto 10 ton) (Based on
Building SOR 2023-24) It.NO.05010AA, Pg.No.53
C.C. M-25 Control concrete for water retaining
7 structures (GWSSB SOR 2022-23 Sec-1.C Item no.6
Providing and cast in situ C.C. in grade M-25
proportions of ingredients as per mix design by weigh
batching using granite, quartzite trap metal of size
mm to 20 mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle vibrated
consolidation, curing and hydraulic testing etc.
complete (excluding cost of reinforcement) with
centering and shuttering/ deshuttering etc. comp. up to
6 meter height /depth Av. G.L.for all water retaining
1. Bottom slab or floor slab with shuttering 100.00 Cu. M 8077.00
2. Bottom slab or floor slab – without shuttering 100.00 Cu. M 6705.00
3. Bottom dome / roof dome 50.00 Cu. M 8281.00
4. Slant slab/conical wall or conical shell 50.00 Cu. M 8266.00
5. Beams /Ring beams/Ring girders 50.00 Cu. M 8347.00
6. up to 15 cm thick 50.00 Cu. M 8597.00
7. Above 15 cm and up to 20 cm 50.00 Cu. M 8262.00
8. Above 20 cm and up to 25 cm 50.00 Cu. M 8006.00
10. Columns 50.00 Cu. M 9195.00
Providing and laying in position Ready Mixed M200
grade concrete for reinforcedcement conctere \work
using cement content as per approved Design Mix
manufactured in fully automatic batchingplant and
transported to site of work in transit mixer for a lead
up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforcedcement concrete work including pumping of
R.M.C. from transit mixer to siteof laying,excluding
the cost of centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions asper IS: 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and durability
as per direction of the Engineer- in- charge.Without
FlyAsh (Min cement level as per latest IS 456 shall be
maintained) (Based On Building Works Ahmedabad
City R & B SOR 2023-24) It.Code.5056, Pg No.67
Providing and laying in position Ready Mixed M250
grade concrete for reinforced cement conctere work
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead
up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforcedcement concrete work including pumping of
R.M.C. from transit mixer to site of laying,excluding
9 the cost of centering shuttering finishing and 200.00 Cu. M 4853.56
reinforcement including cost of admixtures in
recommended proportions asper IS: 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and durability
as per directi on of the Engineer- in- charge.Without
FlyAsh (Min cement level as per latest IS 456 shall be
maintained) (Cement level 450 kg ) (Based On
Building Works Ahmedabad City R & B SOR 2023-
24) It.Code.5055, Pg No.66
Providing & Applying Tri mix with Dewatering
Machine floter machine on constructed RCC work
including Machine & Labour etc Comp as directed
Making 15 mm Groove on RCC work on road and fill
11 it with poly sulfied selant and finished it good include 1000.00 Rmt 30.00
all labour charges etc Comp as directed
Labour work of fixing kurb any design of central
verge, (both side) footpath kurb, items includes
necessary excavation, asphalt cutting of any thickness,
erecting in line and position and pointing with cement
mortar (1:3), watering, etc complete, filling with zari
along the side of the kurb, the kurb stone fix prepared
with bitumnious top surface, as directed by engineer in
Labour work for fixing interlocking blocks / any kind
of pavement on up to 50 mm th sand bedding,
13 levelling, watering and fixing in line & level as well 4000 Smt 68.64
cleaning the site etc.comp. as directed.(AMC approved
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other
areas as mentioned in the drawing/instruction of
engineer in charge. Cost includes formworks using
rubber mould, Rate providing and laying paver blocks
as per required grading and specification. The paver
block shall be mechanically compacted. The work
of paving blocks shall be executed in line and level
by skill mason of flooring work only. It should be laid
in such a way that the no cutting of the paver block to
be necessary. if cutting of paver block necessary then
it should be cut by machine only and carting. The
finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall be
compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for
production. Laying on 5 cms thick sand beddding.
Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb Block for Footpath in M-20 grade using
mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory
system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of
15 asphalt, fixing the Kerb stones in line and level on 5 cm 500.00 Rmt 758.93
thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing in
CM (1:3) for all joints of the kerbstones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous
concrete mixed in proper position as directed by Engineer
in change to form a portable mixture. In any case Gravel or
such type of materials shall not be allowed for production.
a) Laying on 5 cm thick Sand Bedding.
Providing and fixing 1.20 Metre high fencing with
Metre long M.S. Angle posts 40mm x 40 mm x6 mm
and oil painting 3 coats fixed at 2.5 Mt,C/c. with five
Horizontan lines and two diagonals of galvanised steel
16 barbed wire weighting 9.38 Kg. per 100 Metre, 1000.00 Rmt 385.40
strained and fixed to posts with G.I,staples including
fixing the postsin ground with 0.5 M x 0.5.M x 0.5 M.
block in C.C1:5:10 etc complete.(R&B SOR 2023-24 PG
Steel /Reinforcement bars (GWSSB SOR 22-23 Sec-
1.C Item no.9 pg.45 )
Supplying cutting, bending, binding and placing in
position steel as per plan and design and as per ISS
2502 including cost of steel and binding wire for
reservoirs/structures only including lift up to 6 meter
height or depth below G.L. for all diameters.
9.4 Do – deformed (TMT) bars confirming to relevant
IS Fe – 500 grade for all diameters.
Brick work using common burnt clay building bricks
having crushing strength not less than 35 kg./Sq.Cm.
in foundation and plinth in Cement Mortar 1:5. (1-
Cement : 5 -fine sand) (A) Modular (Based On
Building Works Ahmedabad City R & B SOR 2023-
24) It.No.6.12 It.Code.06001AA, Pg No.70
Cement Plaster ((I.No.17.6 + 17.69 R & B SOR 2023-
Providing 15mm thick cement plaster in single coat on
Rough (Similar)side of single or half brick walls for
interior plastering upto floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-
cement:3-sand) finishing with a floating coat of neat
B) – do – Without water proofing compound. 500.00 Sq.m 195.00
Providing and supplying Lowering, laying and jointing
ISI marked only standard length StonewaRe pipes in
standard lengths of following class and diameter with
cement joints in C.M.1:1 proportion in proper position,
grade and alignment at all level as directed by
Engineer- in-charge including conveyance from stone
to site of work, Jointing material etc. comp. including
all taxes ,insurance , transportiton, fright charges,
octroi , inspection charges, loading, unloading,
conveyance to departmental stores , stacking
etc.complete (IS-651-1989) Class AA (GWSSB SOR
2022-23)Part-1 & 2A (Material Sec) It.No.11.1,Class
A,Pg.No.17+ (GWSSB SOR 2022-23) SECTION:1 &
2.B-LABOUR It.No.14, Pg.No.40
Providing and supplying ISI Standard R.C.C, pipes (of
Sulphate Resisting Cement) in standard lengths of
following Class and diameter suitable for either collar
21 joints or rubber ring joints including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading , conveyance
for departmental stores, stacking etc.
Note : One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates
below. One rubber ring should be supplied with each
full length socketed pipe, cost included in rates below.
(GWSSB SOR 2022-23 MATERIAL SECTION :-1A
Item No.10 Page No.15)
10.1.D Class NP3 Test Pressure 0.7 Kg/sq.cm
Lowering, laying and jointing R. C. C. pipes in C. M.
1:1 1/2 of following diameters in proper position,
grade and alignment at all level as directed by
22 Engineer-in-charg including conveyance from stores to
site of work, labour, giving hydraulic testing as per ISI
code. (GWSSB SOR 2022-23 SECTION : 1 & 2.B -
LABOUR Item No.11 Page No.39)
Providing and supplying ISI Standard R.C.C, pipes (of
Sulphate Resisting Cement) in standard lengths of
following Class and diameter suitable for either collar
23 joints or rubber ring joints including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading , conveyance
for departmental stores, stacking etc.
Note : One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates
below. One rubber ring should be supplied with each
full length socketed pipe, cost included in rates below.
(GWSSB SOR 2022-23 MATERIAL SECTION :-1A
Item No.10 Page No.15)
Lowering, laying and jointing R. C. C. pipes in C. M.
1:1 1/2 of following diameters in proper position,
grade and alignment at all level as directed by
24 Engineer-in-charg including conveyance from stores to
site of work, labour, giving hydraulic testing as per ISI
code. (GWSSB SOR 2022-23 SECTION : 1 & 2.B -
LABOUR Item No.11 Page No.39)
Filling available excavate dearth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
exceeding 20cm. in depth consolidating each
disposited layer by ramming and watering. (Based On
Building Works Ahmedabad City R & B SOR 2023-
24) It.No.4.12 It.Code.4006, Pg No.48
Refilling the pipeline trenches incl. ramming, watering
, consolidating desposal of surplus stuff as directed
26 within a radius of 3 km.(GWSSB SOR 2022-23
SECTION : 1 & 2.B - LABOUR Item No.14 Page
a Refilling as directed 5000.00 Cu.m 22.00
--do-- with selected soil brought from outside
b including 2000.00 Cu.m 175.00
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc..completed. (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line Drainage
Work Item No.11 Page 2)
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90 meter for pipe dia <=150 mm.
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to
0.90 meter for pipe dia <=230 mm.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
1.20 meter for pipe dia <=230 mm
Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation , Refilling
Brick Bats Cement Concrete (1:5:10) of thickness
C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside
(Only for shaft) In Cm 1:3, Finishing With Cement
Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps
35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5,
Rcc Slab In Cc 1:1.5:3 of thickness 15 C.M., Including
Cantering & Reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.) But Excluding The Cost Of
Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00 Meter (Inside Clear, M.H. length should be
parallel to the flow) (SOR - (Jan. 2016) Rates for work
of Drainage / SWD pipe line Drainage Work Item
1.00 to 2.00 meter depth, (Slab at Ground level) (for
pipe dia <=230 mm)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From
G.L.) (for pipe dia <=300 mm)
Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 0.75 mt for constructing
slab @ depth more than 0.60 mt below Ground Level
29 (Max. 3 unit of DM should be reduced in this item) 15.00 DM 460.71
(As Per R.A. Based on Building SOR 2015-16) (SOR -
(Jan.2016) Rates for work of Drainage / SWD pipe
line Drainage Work Item No.13 Page 3)
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside & outside (Only for
shaft) in CM 1:3, finishing with cement slurry, P/F
mm dia M.S.Steel HDPE coated steps 35 cm c/c at
cm staggered in masonary CM 1:5, RCC Slab in CC
1:1.5:3 of thickness 23 C.M., including Cantering
& reinforcement (double jalli at 15 C.M. c/c bothway
12 mm dia.) but excluding the cost of Manhole seat
cover etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear , M.H. length should be parallel to the
flow, for pipe dia <= 800 mm) (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line Drainage
Work Item No.14 Page 3)
a 1.00 to 2.00 meter depth, (Slab at Ground level) 100.00 No 10177.68
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From
3.00 to 4.00 meter depth,(Slab at below 1.00 mt. From
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From
7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From
Extra rate over item of Constructing Slab Type M.H.
Chamber of following size for constructing M.H.
Chamber, per 1.00 Decimetre of additional depth or
31 part thereof. etc. complete. Of size 1.00 x 1.40 mt.
(inside clear) and Depth from (SOR - (Jan.2016) Rates
for work of Drainage / SWD pipe line Drainage Work
Item No.15 Page 3)
a 4.00 to 5.00 meter depth, 20.00 DM 521.43
b 6.00 to 7.00 meter Depth 10.00 DM 536.61
c 8.00 to 9.00 meter Depth 10.00 DM 551.79
d 9.00 to 10.00 meter Depth 10.00 DM 564.29
Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 1.40 mt for constructing
slab @ depth more than 0.60 mt for (MH 2 to 3 mt
depth) and 1.0 mt for (MH above 3.0 mt depth) below
Ground Level (Max. 5 unit of DM should be reduced
in this item) (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line Drainage Work Item No.16
Dismantling of existing Arch type manhole upto Arch
and then Const. Slab type manhole of following size
incl. excavation , refilling and & finished 15 mm thick
cement plaster inside in CM 1:3,P/F 4 mm dia M.S.
Steel HDPE coated steps 35 cm c/c at 35 cm staggered
33 in masonry CM 1:5, incl. cost of RCC Slab in CC
1:1.5:3, including Cantering & reinforcement as
directed by engineer in charge. Rate includes carting
of debris and excavated soil (SOR-(Jan. 2016) Rates
for work of Drainage / SWD pipeline Drainage Work
Item No.17 Page 4)
1.00 x 0.75 mt (inside clear) RCC Slab of thickness
C.M & reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
1.00 x 0.75 mt (inside clear) RCC Slab of thickness
C.M & reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10mm dia.) From 2 to 3mt depth (Slab at
below 1.00 mt.From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness
CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
below 1.00 mt. From G.L.)
Constructing Bombay Pattern Type CatchPit of size
0.60 x 0.60 depth upto1mt including excavation
B.B.C.C. (1:5:10), 23 cms thick brick maso.wall in the
prop.of CM (1:6) with 40 mm thick IPS flooring in the
34 prop M15 at bottom and 15 mm thick cement plaster 100.00 No 3125.00
inside the catchpit in the proportion of CM (1:3)
without jali etc. comp. as directed. (As per R.A. Based
on Building SOR 2015-16) (AMC Drainage SOR-Jan-
CatchPitJali (Heavy duty) Fixing P/F FRC catch pit
35 jali with frame 600 mm x 600 mm clear opening etc. 50.00 No 1522.00
comp. As directed by engineerin charge.
Cutting the pipes of following dia coming in the new
M.H. in running sewer including cutting bars,
including removing debris / silt from the M.H. and
carting at a suitable distance etc..complete as directed.
No payment for M.H. work will bemade until pipe is
not cut completely in all respect. (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line Drainage
Work Item No.17 Page 4)
a 150 mm to 300 mm dia. 50.00 No 1133.93
b 400 mm to 600 mm dia. 20.00 No 1687.50
c 700 mm to 900 mm dia. 5.00 No 2008.93
F.R.C. Strom Water Grating Set:- Grating(Jali):
740 x 740 x 90mm square jali, 20:00 MT load
design, 90x2 mm MS flat all round, Frame: 600 x
37 600mm clear opening, outer size- 900 x 900 x 165 30.00 Set 5173.73
mm. On the upper periphery of frame 25 x 3mm
wide MS flat should be well embded in concrete to
protect the edges of frame
F.R.C. Strom Water Grating
Set : Grating (Jali): 690 x 690 x 70mm square jali,
20:00 MT load design, 70x2mm MS flat
38 allround,Frame: 600 x 600mm clear opening, outer 30.00 Set 4741.52
size- 800 x 800 x 120 mm. On the upper periphery
offrame 25x3mm wide MS flat should be well
embed in concrete to protect the edges of frame.
F.R.C. Strom Water Grating
Set : Grating(Jali): 620 x 620 x 75 mm square jali,
20:00 MT load design, 75x1.2mm MS flat
39 allround,Frame: 500 x 500mm clear opening, outer 30.00 Set 4734.75
size- 770 x 770 x 135 mm. On the upper periphery of
frame 25x1.5mm wide MS fl7at should be well
embed in concrete to protect the edges of frame.
Making connection to the ex.M.H.in running sewer
incl. Dewatering and other required machinery etc. of
following dia pipes at any convenient time. All
40 damaged work shall be well repaired as per
instructions. etc..complete. (SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line Drainage Work
Item No.19 Page 4)
b 400 mm to 600 mm dia. 50.00 No 2232.14
c 700 mm to 900 mm dia. 10.00 No 3125.00
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same as
directed (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line Drainage Work Item No.21
a up to 0.15 mt. (@ Two Coarse) 100.00 No 732.14
b up to 0.35mt. (@ Four Coarse) 100.00 No 1160.71
c up to 0.65 mt. (@ Seven Coarse) 100.00 No 1794.64
d up to 0.90 mt. (@ Ten Coarse ) 100.00 No 2160.71
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5
and plaster in C.M. 1:3 and fixing C.I. steps and
42 existing chamber sheet cover,removing the debris from 20.00 No 401.79
chamber and carting the same asdirected. (SOR - (Jan.
2016) Rates for work of Drainage /SWD pipe line
Drainage Work Item No.22 Page 5)
Providing Kachha of Pakka Dummy in the following
dia pipes and removing the same after completion of
43 the connection work as directed. (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line Drainage
Work Item No.26 Page 5)
a 100 mm to 300 mm dia. 100.00 No 199.11
b 350 mm to 600 mm dia. 50.00 No 302.68
c 650 mm to 900 mm dia. 20.00 No 642.86
Providing & Constructing Precast RCC Manhole in
RCC M-40 grade Controlled concrete as per drawing,
in OPC including excavation, 80 mm thick P.C.C. in
M-15, Reinforcement in TMT-500, PVC Foot steps,
Providing & fixing FRC Manhole frame & cover
complete etc. (Drainage Project Approved Rate)
a For 300,450 & 600 dia. Pipe (upto 4 m. depth)
i 1.2 dia x 2.0 m Depth 5.00 No 38936.00
ii 1.2 dia - 2.01 to 2.99 m Depth 5.00 Rmt 9034.00
For 900 mm dia.pipe for any depth & For 300,450 &
600 dia. Pipe (more than 4 m. depth)
i 1.5 dia x 2.0m Depth 5.00 No 50265.00
ii 1.5 dia - 2.01 to 2.99 m Depth 5.00 Rmt 10666.00
iii 1.5 dia x 3.0m Depth 5.00 No 58129.00
iv 1.5 dia - 3.01 to 3.99 m Depth 5.00 Rmt 10680.00
v 1.5 dia x 4.0m Depth 5.00 No 67414.00
vi 1.5 dia - 4.01 to 4.99 m Depth 5.00 Rmt 12383.00
Constructing Scrapper Slab Type M.H. Chamber of
following size incl. excavation, refilling, brick bats
cement concrete (1:5:10) of thickness
C.M.,C.C.channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside
(only for shaft) in C.M.1:3, finishing with cement
slurry,P/F4 mm dia M.S Steel HDPE coated steps
cmc/c at 35 cm staggered Masonry in C.M.1:5, RCC
slab in CC 1:1.5:3 of thickness 23 C.M, including
Cantering & reinforcement (double jalli at 15 C.M c/c
both way 12 mm dia.) but excluding the cost of
Manhole seat cover etc. completed (Inside Clear, M.H.
length should be parallel to the flow (Drainage Project
a <= 1000 mm dia.
c <= 1400 mm dia.
d <=1600 mmdia.
Extra rate over item of Constructing Scrapper Slab
Type M.H. Chamber of following size for constructing
46 M.H. Chamber, per 1.00 Decimeter of additional depth
or part there of etc.complete. (inside) and depth
from (Drainage Project Approved Rate)
a For Pipe dia. <= 1200 mm
i 1.8 m x 1.8 m Manhole depth from 4.0 to 5. 0 m 10.00 DM 732.25
b For Pipe dia. <= 1400 mm
ii 2.0 m x 2.0 m Manhole depth from 4.0 to 5. 0 m 10.00 DM 801.69
c For Pipe dia. <= 1600 mm
iii 2.2 m x 2.2 m Manhole depth from 4.0 to 5. 0 m 10.00 DM 872.03
Temporary / Permanent Plugging for blocking of
sewer line, branch connections and diversion of
flows and removal of all plugs,etc. (GWSSB SOR
a 300 mm dia & below sewer line 100.00 No. 1210.00
b 400 to 500 mm dia.sewer line 100.00 No. 1452.00
Providing Dead Cantering using good quality Country
Wood Planks, wall Plate of required thickness and size
including placing the nece. supports of reqd. size,
nailing, fixing with mortar, levelling. All specification
for dead centring as per standard engg. practice etc.
comp. as directed. (SOR - (Jan. 2016) Rates for work
of Drainage / SWD pipe line Drainage Work Item
Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max.2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
49 temporary sufficient nos of lighting arrangement 500.00 Rmt 80.36
through out the work with necessary required
arrangement. The same shall be removed after
completion of work. (Only for break down work from
start to complete) (SOR- (Jan. 2016) Rates for work of
Drainage / SWD pipe line Drainage Work Item No.29
Providing Dummy or Plug the Running Sewer by
using M.S. Plate , safety measures , Labour , mud
pump , D.G. set & Transportation of the same
50 machinary also inclues removing of dummy when
required and placed labour & Supervisor remain
present till the work comp.etc. as directed.(Drainage
Project Approved Rate)
a 300 mm dia to 600 mm dia 10.00 No. 40000.00
b 600 mm dia To 1200 mm dia 10.00 No. 60000.00
c Above 1200 mm dia 10.00 No. 90000.00
Dewatering by pumping set (GWSSB SOR 2022-23
Sec-E Item no.1 pg.104 )
Dewatering by pumping set of required capacity
including temporary platform carting pumping at site
and fixing the same in position including all
accessories, and fuel and labour etc.complete.
Pump set of Capacity 20000.00 HP/Hr. 18.32
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging diesel
52 to run the D.G.Set Do As Directed. 8 Hrs Shift. (No 500.00 Shift 2500.00
payment should be allowed for non working condition
of machinery ) (Based on Previously approved rate by
Hiring and operating the 60 KV 3 Phase Electric
Generator for operating desilting machinery and
lighting and other requirements with Arranging diesel
53 to run the D.G. set Do As Directed. 8 Hrs Shift.(No 100.00 Shift 8400.00
Payment should be Allowed for non workinh
Condition of machinery) (Based on Previously
approved rate by C E sir)
supply super sucker machine incl. fuel , machine
operator, driver , loading unloading of pipe ,suction
machine , two silt loader , removing silt from loader at
perticular place etc.comp.as directed.
Hiring of Tractor with trolley considering 8 hrs. as
55 working day hours incl. Driver (GWSSB SOR 22‐23 100.00 Day 2104.09
It.No.7 Pg.no.105 Part.2 E. misc)
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece.
shifting, fuel and operating charges and stacking of
56 useful & non-useful materials separately up to store. 250.00 Hour 535.71
(No payment should be allowed for non working
condition of machinery and for pipe line excavation
and laying work) (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line - Machinery Item No.4 Page
Providing & Supplying Hitachi Machine -110 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
57 includes all nece. shifting, fuel andoperating charges . 200.00 Hr 1785.71
(No payment should be allowed for non working
condition of machinery ) (SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line - Machinery Item
No.5 Page no.7)
Providing & Supplying Hitachi Machine -200 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
58 includes all nece. shifting, fuel and operating charges. 200.00 Hr 2410.71
(No payment should be allowed for non working
condition of machinery ) (SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line - Machinery Item
No.6 Page no.7)
Providing & Supplying Any Type Of Hitachi Machine
capacity on rental basis in case of emergency situation
and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges.As Per Market Rate.
Providing & Supplying hydra carne Machine of
tone capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of engg.
incharge , rate includes all nece. shifting, fuel and
operating charges . (No payment should be allowed
fornon working condition of machinery) (Based on
central work shop rate ) (SOR - (Jan. 2016) Rates for
work of Drainage /SWD pipe line - Machinery Item
No.7 Page no.7)
Supplying electric breaker machine for RCC slab or
asphalt demolishing work on site by using operator,
fuel, power supply etc.complete as directed. (no
payment should be allowed for non working
61 condition of machinery and for pipe line 100.00 Shift 1071.43
excavation and M.H. work. Allowed only for break
down work) (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipeline - Machinery Item No.9 Page
Supplying Pneumatic Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
62 working condition of machinery and for pipe line 200.00 Hour 535.71
excavation and M.H. work. Allowed only for break
downwork) (SOR - (Jan. 2016) Rates for work of
Drainage / SWD pipe line - Machinery Item No.10
Providing & Supplying JCB Breaker Machine on
rental basis for demolish RCC , asphalt etc.demolition
63 type work & also during unvoidable condition as per 200.00 Hour 1500.00
instruction of engg, incharge , rate includes all nece.
shifting , fuel and operating charges.
Carting and Fixing M.H. Chamber or Catchpite Seat
and Cover in line and level to match exisisting road
level in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as directed.M.H.
seat cover will be supplied by A.M.C.(from any store)
(AMC Drainage SOR Jan-2016)
Providing F.R.C. MH seat cover incl. carting to the work
65 site etc. comp. Directed.(Based On Rate Of Central Store
Circular No.01/2025-26 , Dt.21-04-2025)
(SET cover and frame) F.R.C. Extra Heavy Duty
[EHD-35] Machinehole Covers & Frame-560 mm ø
a clear opening, The dimension of frame and cover as 50.00 Set 6165.25
per mentioned in Amend No.1 to IS 12592 : 2002 table
( Only Cover ) F.R.C. Extra Heavy Duty [EHD-35]
Machinehole Covers & Frame-560 mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
Only Frame ) F.R.C. Extra Heavy Duty [EHD-35]
Machinehole Covers & Frame- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Cover) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames- 560mm ø clear
b1 opening, The dimension of frame and cover as per 50.00 No 3177.97
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Frame ) F.R.C. Heavy Duty [HD- 20]
Machinehole Covers & Frames- 560mm ø clear
b2 opening, The dimension of frame and cover as per 50.00 No 3029.66
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Machinehole Covers & Frames- 560mm ø clear
c opening, The dimension of frame and cover as per 100.00 Set 4025.42
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame)
(Only Cover ) F.R.C. Medium Duty [MD- 10]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Frame ) F.R.C. Medium Duty [MD- 10]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Cover ) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only frame ) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames- 560mm ø clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Cover ) F.R.C. Medium Duty [MD- 10]
Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Frame ) F.R.C. Medium Duty [MD- 10]
Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 600 x 450mm clear
opening,The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Cover ) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 600 x 450mm clear opening,The
dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592 : 2002 table
(Only Frame ) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 600 x 450mm clear opening,The
dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 450 x 450mm clear
opening,The dimension of frame and cover as per
mentioned in Amend No.1 to IS 12592 : 2002 table
(Only Cover ) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 450 x 450mm clear opening,The
dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592 : 2002 table
(Only Frame ) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Fr0ame - 450 x 450mm clear opening,The
dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592 : 2002 table
Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris
from trench backfilling etc.comp. as directed by
Mazdoor At Day/Night (Ahmedabad City SOR-2023-
24,Page No.39, Sr.no.1065, Code L037)
Makadam/supervision at day/Night (Ahmedabad City
SOR-2023-24, Page No.39, Sr.no.1058, Code L029)
Basic Rate for Labour (SOR Ahmedabad City year
23-24 Page No.39)
Labour charges - Blacksmith 1st Class 20.00 Nos. 681.00
Labour charges - Blacksmith 2nd Class 20.00 Nos. 612.00
Labour charges - Breaker 20.00 Nos. 578.00
Labour charges - Extra labar sinking and chisselling 20.00 Nos. 2500.00
Labour charges - Mason 1st Class 20.00 Nos. 713.00
Labour charges - Mason 2nd Class 20.00 Nos. 633.00
Labour charges - Welder 20.00 Nos. 689.00
Labour charges - Mazdoor (Female) 20.00 Nos. 450.00
Labour charges - Mazdoor (Male) 20.00 Nos. 493.00
Filling in plinth with sand under floors including
watering ramming, consolidating and dressing
68 complete ((Based On Building Works Ahmedabad 100.00 Cu.M 455.63
City R & B SOR 2023-24) It.No.4.24
It.Code.04007A, Pg No.48)
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC
in mechanical mix plant carriage of mixed Material by
69 tipper to site, laying in uniform layers in sub- base /
base course on well prepared surface and compacting
with vibratory roller to achieve the desired density as
per Codal Provision (Road Project Approved Rate)
Based On Reso.No. St.Comm. :-189 Dt.19/05/2022
a Production & Supply of WMM 1000.00 Cmt. 1708.13
b Laying of WMM 1000.00 Cmt. 31.25
Structural steel work (Confirming to IS4923-1997)
riveted, bolted or welded in builtup for all type
sections , in framed work, including cutting , hoisting,
fixing in position and applying a priming coat of
70 approved steel primer all complete as per the structural 5000.00 Kg 126.68
designs and directions of Engineer in charge.Column (
122 x 61 x 3.6mm ) (Based On Building Works
Ahmedabad City R & B SOR 2023-24) It.Code.20054,
Providing and fixing cast iron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35 FRC
MH cover, rate also incl. loading, unloading and fixing
the frame in line and level to match exisisting road
level in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as per instruction
by engg. in charge. (Approved Rate) (AMC Drainage
Raising of Existing manhole item includes,cutting of
existing road surround by Manhole by diamond cutter
machine dismantling of road in confined area by
breaker machine and carting of dismantal
material.item also included necessarey brick work to
raise the manhole at road level in CM 1:3 item also
included fixing of Manhole frame at exact road level
by using MaserEmaco S 488 trowable fibre reinforced
72 thixotropic repair mortal material Laying of concrete 10.00 No. 6815.32
made form Master Emaco 5 346 flowable micro
concrete material in desired thickness and laying of
hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte
compactor machine .Rate also included necessary
plaster at inside of manhole in CM 1:3 in 20 MM
thickness on raised brickwork.(As per Road Project
Approved rate w/o GST)
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Add.City Engineer
mobile no. (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
AMC SZ TN NO 05 202627 T.No 326.pdf
Financial bid.pdf
Technical bid And Techinical Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].