| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | ₹25.2 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹25.8 L+₹63,210.14 (2.51%)Rejected-AOC KERALA | IDUKKI | KERALA | 685533 | ₹25.8 L+₹63,210.14 (2.51%) | L2 | Rejected-AOC second lowest bidder |
| 3 | L3₹27.1 L+₹1.9 L (7.43%)Rejected-AOC | ₹27.1 L+₹1.9 L (7.43%) | L3 | Rejected-AOC highest bidder |
| Sl No | Description | Qty | Unit | AZEEZ M .M L2 | C.K. NANDAKUMAR L1 | NITHIN.P.JOHN L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix-A- Reactive Maintenance / Initial rectification work. | ||||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 16.82 | cum | 2,558.72 ₹43,035.11 | 2,392.4 ₹40,237.78 Lowest | 2,558 ₹43,023 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 4.7 | cum | 2,646.11 ₹12,444.66 | 2,474 ₹11,635.22 Lowest | 2,646 ₹12,444.14 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 16.82 | cum | 5,286.01 ₹88,905.4 | 5,200 ₹87,458.8 Lowest | 5,561 ₹93,530.46 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 4.7 | cum | 11,907.81 ₹56,002.43 | 11,719.5 ₹55,116.81 Lowest | 12,534 ₹58,947.4 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 593.15 | sqm | 12.37 ₹7,337.3 | 11.57 ₹6,862.78 Lowest | 12.37 ₹7,337.3 |
| 1.01 | OD198105/2025-2026:Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means | 593.15 | sqm | 272.04 ₹1,61,361.34 | 267.75 ₹1,58,816.72 Lowest | 290 ₹1,72,014.37 |
| 1.01 | OD198106/2025-2026:Supplying and fixing of DLP board | 2 | each | 4,984.29 ₹9,968.58 | 4,660 ₹9,320 Lowest | 4,984 ₹9,968 |
| 2.00Appendix-B- Pre-monsoon works | ||||||
| 2.00 | OD198095/2025-2026:Engaging man mazdoor for clearing chocked culvert, clearing vegetation, removing the RCC slab and cleaning drain etc. | 16 | Day | 1,127.36 ₹18,037.76 | 1,054 ₹16,864 Lowest | 1,127 ₹18,032 |
Tender Value
₹27.0 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 3:00 pmClosed
Executive engineer
Executive Engineer Roads Division, Pathanamthitta
GENERAL RM 2025 26 RC2 Ph 2 One Year Running Contract for Thumpamon Kozhencherry Road Ch 8000 to 13 500 RC General Civil Work
2026_PWD_844198_1
PWD/RB/TR/20289/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
90 days
Kozhenchery
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
19 Jun 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-A- Reactive Maintenance / Initial rectification work. | |||||
| 1.001 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 1 | cum | - | - |
| 1.002 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | - | cum | - | - |
| 1.003 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 1 | cum | - | - |
| 1.004 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.005 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 0.2 | sqm | - | - |
| 1.006 | OD198105/2025-2026:Mix Seal Surfacing: Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and nishing to required level and grades as per Technical Specication Clause 509 of MORD.(Total usage of bitumen is 22.00kg/10m2) :-By Manual Means | 0.2 | sqm | - | - |
| 1.007 | OD198106/2025-2026:Supplying and fixing of DLP board | - | each | - | - |
| 2Appendix-B- Pre-monsoon works | |||||
| 2.001 | OD198095/2025-2026:Engaging man mazdoor for clearing chocked culvert, clearing vegetation, removing the RCC slab and cleaning drain etc. | - | Day | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1425190.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
EPY.pdf
Tender Documents • 0.01 MB
PRE.pdf
Tender Documents • 0.12 MB
BOQ_1425190.xls
BOQ • 0.32 MB
viewsbd.pdf
Tender Documents • 1.63 MB
AFFI.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .