Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | -27.11% | ₹2.1 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹6,207.39 (2.89%)Admitted-Finance | -25.00% | ₹2.2 L+₹6,207.39 (2.89%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹35,626.29 (16.6%)Admitted-Finance | -15.00% | ₹2.5 L+₹35,626.29 (16.6%) | L3 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
26 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
PLSE REFER NIT
2026_RDPR_320957_16
e-NIT No. 47 REW Rajouri of 2026 Dated 13-08-2026
Open Tender
Civil Works
Percentage
90 days
RAJOURI
PLS REFER BOQ
2 documents required · 2 mandatory
₹500
Yes
Revenue Head
₹6,000
Yes
17 Sept 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 30% ordinary rock & 70 % AKOS | 50.4 | Cum | 479 | ₹24,141.6 |
| 2 | Providing and laying hand packed stone solling | 12 | Cum | 650 | ₹7,800 |
| 3 | Providing and laying M 10 mix c/conc 30 % Stone | 30.7 | Cum | 5,733 | ₹1,76,003.1 |
| 4 | Providing and laying supply and placing of stone in plumb conc | 13.1 | Cum | 937 | ₹12,274.7 |
| 5 | Providing and laying shuttering with ordinary planks | 96.8 | Sqm | 286 | ₹27,684.8 |
| 6 | Carriages of Sand/Aggragates by 35km MT 100 | 41.4 | Cum | 701 | ₹29,021.4 |
| 7 | Carriage of stone from an avg distance of 500 mtr by H/L | 23.3 | Cum | 698 | ₹16,263.4 |
| 8 | Add cost of sign board | 1 | No | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1070995.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .