| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84.9 LAdmitted-Finance | -38.20% | ₹84.9 L | L1 | Admitted-Finance |
| 2 | L2₹86.2 L+₹1.3 L (1.54%)Admitted-Finance | -37.25% | ₹86.2 L+₹1.3 L (1.54%) | L2 | Admitted-Finance |
| 3 | L3₹86.6 L+₹1.7 L (1.96%)Admitted-Finance | -36.99% | ₹86.6 L+₹1.7 L (1.96%) | L3 | Admitted-Finance |
| 4 | L4₹90.2 L+₹5.3 L (6.23%)Admitted-Finance | -34.35% | ₹90.2 L+₹5.3 L (6.23%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹20.2 L (23.9%)Admitted-Finance | -23.46% | ₹1.1 Cr+₹20.2 L (23.9%) | L5 | Admitted-Finance |
Tender Value
₹1.4 Cr
EMD Value
₹3.3 L
Closing Date
11 Mar 2026, 5:00 pmClosed
GM CIVIL
Administrative Building Sector-6, Noida
Construction of Service Road On 45.00M Wide Road and Painting at Central Verge under Metro Line in Sec.-147, Noida
2026_NOIDA_1120104_1
31/GM/SM-WC-10/ET/2025-26
Open Tender
Civil Works
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.3 L
7 Apr 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
11 Mar 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and samplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 5,109 | Sqm | 3.1 | ₹15,837.9 |
| 2 | Earth work embankment in ordinary soil embankment to be in 20 cm layers incluiding ramming dressing the surface to required levels with half tonne steel or wooden rammer and rolling every third and top most layer in roller 8 to10 tonne capacity and including 1.50mtr, lift and all lead ( earth shall be brought from a place which including cartage of earth be machanically transport and T & P. labour etc. required for proper completion. (earth shall be arranged by the contractor at his own cost (CR) | 3,051 | Cum | 363.05 | ₹11,07,665.55 |
| 3 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 635 | Cum | 4,093.5 | ₹25,99,372.5 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 4,068 | sqm | 82.38 | ₹3,35,121.84 |
| 5 | providing and applying primer coat with SS1 grade bitumen on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00kg / sqm using machanical maens. | 4,920 | Sqm | 42 | ₹2,06,640 |
| 6 | P/L applying tack coat using hot straight run bitumen of grade 80/100: on bituminous surface @ 0.50 Kg/Sqm. | 11,720 | Sqm | 32.35 | ₹3,79,142 |
| 7 | Providing and laying danse graded Bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading. Premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a Hydrostatic paver finisher with sensor contral to the required grade. level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification, clause No.505 comlete in all respects. | 259 | Cum | 10,231.1 | ₹26,49,854.9 |
| 8 | providing and laying Bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading. Premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with Hydrostatic paver finisher with sensor contral to the required grade. level and alignment, rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction and density compaction as per MORTH specification, clause No.507 comlete in all respects. | 262 | Cum | 11,438.8 | ₹29,96,965.6 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work | 9,180 | Sqm. | 50.72 | ₹4,65,609.6 |
| 10 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 1,240 | Cum | 120.55 | ₹1,49,482 |
stage.html
html • 0.03 MB
techsummary_2083360.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
31TD.pdf
Tender Documents • 12.99 MB
BOQ_2083360.xls
BOQ • 0.25 MB
C.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .