Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
28 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer [C & O], Wanakbori TPS
Design, manufacture & supply of Air washery blowers & ducts, erection & commissioning of complete Air Washery blowers & ducts and dismantling of existing air washery blowers of 210MW Unit No.7 at WTPS.
216413
WTPS/S/ET/01/2025/SUPPLY-44 RFQ NO 72660M
Open
Miscellaneous Goods
Supply
Kheda
7 documents required · 7 mandatory
₹5,900
GUJARAT STATE ELECTRICITY CORP. LTD. [NEFT/RTGS/online payment -PAYABLE AT BANK OF BARODA WTPS BRANCH]
₹2.4 L
21 Aug 2025
21 Aug 2025
21 Aug 2025
28 Jan 2026
21 Aug 2025
No. Reqd.
If Any IN%
Supply (Part-A)
CENTRIFUGAL FAN WITH MOTOR
HAVING CAPACITY OF
M3/HRS(CMH) WITH COMMON
BASE FRAME, FAN & MOTOR
1 PULLEY DRIVE WITH SUITABLE 3 Set
BELTS,SPRING TYPE VIBRATION
ISOLATOR, CASING WITH MAN
HOLE AND SHROUD WITH BIRD
SCREEN FOR AIR WASHERY
GI INLET DUCT DAMPER I.E.
VOLUME CONTROL INSTALLED IN
AIR DUCT) MADE FROM
2 6 Number
GAUGE GI SHEET AND MS ANGLE
SUITABLE FOR EXISTING AIR
20 GAUGE GALVANIZED GI SHEET
FOR AIR DUCT(INCLUDING
REQUIRED HOT DEEP
GALVANIZED MS ANGLE SIZE 50 SQUARE
MM X 50 MM X 6 MM FOR METRE
SUPPORTING FRAME OF AIR
DUCT, MS BAR AND FASTENERS
Work (Part-B)
Removal of existing blower, Erection
and commissioning of new
Centrifugal fan & Motor assembly
4 having each of capacity of 1,50,000 3 Job
m3 / hr (CMH) or higher with
common base frame for fan &
motor...dynamically balanced
Removal od old existing damper and
5 Installation of GI Inlet air volume 6 Job
control Duct Damper in aie duct
Removal and Erection and SQUARE
commissioning of new ducting made METRE
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
from 20 Gauge GI sheet and MS
angle frame
The overall L1 will be considered as SUPPLY (PART-A) + WORKS (PART- B) = L1
(Grand Total ).
(Grand Total ).
[A] SUPPLY PART:
Item Sr No:01
Detail Technical Specifications:
Design, manufacture & supply of Centrifugal fan & Motor assembly having each capacity of
m3 / hr (CMH) or higher with common base frame for fan & motor, pulley drive with suitable belts,
spring type vibration isolator, casing with man hole, suction shroud should be covered with bird
screen, Belt Guard, Blowers with outlet volume control dampers and expansion bellows (canvass
connection) fan will be zinc sprayed and rotor of blower with fan pulley and Motor pulley should be
dynamically balanced for each blower. Party shall have to supply additional shaft with fitted
hub, Set of bearings, set of bearing housing and 06 set of V-belts as mandatory spares.
Following are required technical specifications:
(a) SPECIFICATIONS OF AIR WASHERY BLOWER/FAN/MOTOR:
DESIGN DATA OF AIR WASHERY BLOWER:
Capacity – 1,50,000 CMH or higher for each Fan.
Blower Type: DIDW
Static pressure: 65mm WC
Fan casing: 4 mm thick in split condition painted with 2 coat of anti-rust
primmer and 02 coat of black bituminous anti- corrosion paint / Zink
Center plate: 16 mm
Fan shroud: 5mm
Fan shroud mesh: SS
Fan Shaft: EN -8
Fan blade: 4 mm X 2 (aerofoil), Rotating assembly including Pulley
dynamically balance as per ISO 1940 Gr. 6.3 & Gr
Drive: V-belt drive
Belt pulley guard: Ms frame with SS 304 mesh
Base Frame: Made from M.S. Channel size 150 mm / 200 mm with vibration
DESIGN DATA OF AIR WASHERY BLOWER drive Motor
Motor: 100 HP/3Ph/415V/50HZ/TEFC or Suitable to meet Air Blower
requirement
Make: Crompton / Kirloskar/JYOTI / C.G./ G.E/ Marathon/NGEF/ Bharat Bijali/
Insulation : Class F
Connection : Delta
(b) Outlet / Discharge damper of air blower: Manually operated volume control dampers
made from 18 SWG hot deep galvanized GI sheets opposed blade type suitable for volume
control and isolation.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(c) Expansion bellow (canvass connection): Flexible canvas connection for providing
between fan outlet and outlet damper suitable to existing duct.
(d) Base Frame: Made from M.S. Channel size 150 mm / 200 mm mounting for Motor and
Blower, painted with 2 coat of anti-rust primmer and 02 coat of black bituminous anti-
corrosion paint. Base frame shall be mounted on Anti Vibration Mounting of appropriate
For item Sr no:1 Party shall have to supply additional shaft with fitted hub, Set of bearings,
set of bearing housing and 06 set of V-belts as mandatory spares.
For item Sr no:1 to 3 Delivery period for entire supply at item Sr No: 01, 02 & 03 is 06 months
from date of LOI Issued.
Item Sr No:02
Inlet Duct Damper: Supply of various sizes of 06 no of GI volume control Duct Damper suitable to
install in Air Duct made from 18 Gauge GI sheet and MS angle 50 mm. Frame shall be painted with
anti corrosion ZINK base paint as per instruction of eic. (Total area of 06 no of air volume control
damper = 200 sq. feet). Party shall have to measure actual size of existing dampers and supply
accordingly.
Item Sr No:
GI sheet for air Duct: Supply of new ducting made from 20 Gauge GI sheet and MS angle frame
support on appropriate distance. Party shall have to supply Hot Deep Galvanized MS angle size
mm x 50 mm x 6 mm for supporting frame of air duct and MS bar along with GI sheet as per
requirement. No separate loading is payable for supply of angle, Bar, turnbuckle, fasteners requited
to erect the GI Duct.
[B] Works Part:
Following major works are in the scope of the contractor for item Sr no:
(1) The contractor can visit WTPS site to measurement of components / specifications of job /
items / equipments of existing Air washery system for design, preparation of drawings,
fabrication and manufacturing of item mentioned at sr. no. 1 to 6 .
(2) Design, manufacture & supply of various components of Air washer system as mentioned in
Schedule-B. The dimensions / material grade / size of components etc should be as per item
description, site requirement.
(3) The supplied Air washer blower / fan should be run trouble free and should not be overload
during running condition. Party shall have to make necessary arrangement to witness the
desired Blower st. pressure and flow after commissioning if required by WTPS-GSECL.
(4) Party has to offer Air washery system suitable to above specifications only. Fan of blowers,
fan pulley & motor pulley should be statically & dynamically balanced. Party has to submit
balancing report along with the supply of materials. Routine test certificate of motor should be
submitted with supply.
(5) Party shall have to submit the Material Test Certificate whenever required for supplied
material from government approved laboratory / Manufacturer along with supply.
(6) Party shall have to supply additional shaft with fitted hub, Set of bearings, set of bearing
housing and 06 set of V-belts as mandatory spares.
(7) Packing, Forwarding, Transportation & Loading-unloading of new spares / components from
party‟s firm to WTPS site is in party‟s scope.
(8) Dismantling of existing components / equipments of Air washery system viz. Air washery
blowers & its MS foundation including motor from foundation, discharge dampers, outlet
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
connectors, air grills, damaged duct etc.
(9) Erection & commissioning of newly supplied air washery system equipments i.e. newly
supplied complete 03 no of air washer blowers & motors with base frame, outlet dampers(03
Nos.) , expansion bellows( 03 Nos.) & replacement of existing duct with associated works
repairing of damaged duct ,new ducts etc. The complete job should be carried out by party in
to the existing place available after dismantling the old air washer system as per our
specification.
(10) Erection and commissioning of new ducting made from 20 Gauge GI sheet and MS angle size
50mmX50mmX6mm frame.
(11) The new supplied Air washer system equipments should be erected in such a way that
running equipment / auxiliary piping should not be damaged. Any damages to GSECL
property will be at on your account & shall be recovered from your RA bill.
(12) Since all the equipments and entire system are supply and erect by you, any items /
accessories / equipment, materials including nut bolts, screws, consumable welding
electrodes, labours, scaffolding, tools and tackles, etc. required for erection and completing
job and commissioning of the system is in your scope and no extra charges/payment shall be
payable by GSECL.
(13) The newly supplied Air washery systems equipments shall fit completely, as per dimensional
requirement of the space available on removable of the old air washer system and shall also
include all the items which are not specifically mentioned but needed to make air washer
system complete and shall be treated as though included in supply; as well as functional
requirement. However you have to supply, erection & commission the complete system in the
existing place available after dismantling the old air washer equipment as per our specification
(14) Installation of motor on foundation, testing, commissioning work should be carried out by
contractor. Motor de couple and couple vibration should be taken by contractor and should be
within limit.
(15) If any leakage is observed in the air duct connection or duct erected by party, the same
should be rectified before commissioning of the air washer equipment. Party has to design
and installed the duct ending with wall shall be leak proof; necessary packing shall be used to
prevent the leakage of air from the joints. Packing materials are in party‟s scope.
(16) The time limit for completing the erection & commissioning of all 03 air washery blower
systems is 90days from the date of commencement letter issued from WTPS-GSECL .
(17) Major / Minor civil work for foundation of Air washery blowers are in party‟s scope. Party has
to arrange all civil work related to any alteration / new foundation required for all 03 air
washery blowers.
(18) Fabrication and installation of of GI duct and its support made from Hot Deep Galvanized MS
angle size 50 mm x 50 mm x 6 mm for supporting frame of air duct and MS bar along with GI
sheet as per requirement. No separate loading is payable for supply of angle, Bar, turnbuckle,
fasteners requited to erect the GI Duct. Required scaffolding is in party‟s scope.
(19) Party shall have to carry out erection and commissioning of supplied air washery System of
Unit#7 during winter season (i.e. November to February), Party will be informed well in
advance to carry out the work after supply of air washery blowers in written letter.
(20) After commissioning of Air washery system, necessary performance/tests shall be carried out
by party at their own cost.
(21) Party shall have to clearly note out that complete assembly of air washery blowers is not
physible to transfer to Air washery blower room. Hence party shall have to make necessary
consideration during Design and fabrication.
(22) Party shall have to make necessary arrangement for transportation of supplied material of
supply portion from mail store to Air washery room of unit no:07. GSECL will provide only
EOT crane up to approachable places in Turbine Building. Rest of all arrangement to shift the
material up to Air- Washery room -7 shall be in party‟s scope.
(23) Scaffolding required for installation of Blowers, Ducts, dampers, Air ducts and its support are
in party‟s scope
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(24) Special lifting tools and tackles, fixtures etc required to complete the subjected work shall be
in party‟s scope.
(25) Party shall have to remove the old / scrap blowers and ducts from the existing site and credit
to scrap yard as per instruction of EIC.
(26) Work Period to execute the entire work at item Sr no: 04, 05 & 06 is 90 days from the
date of commencement letter issued by WTPS.
Following works are in the scope of the GSECL.
(1) Civil works, such as breaking walls, making opening in walls for ducting & making them with
origin, plaster as per requirement.
(2) Electrical connection and supply of energy will be in the scope of GSECL. The lighting is to be
arranged by the party. The GSECL shall make arrangement for providing power supply to the
contractor for working their equipments, tools etc. as and when required as decided locations /
points by Engineer-in-charge. The contractor may arrange ICTP switches and ELCBs. Further
distribution shall be at the cost of contractor. Floods for lighting will be arranged by GSECL as
and where required. However contractor shall arrange 100 Watts / 24 Watts bulbs at own
(3) Service air, service water as per requirement at single point nearer to work site.
(4) Crane / forklift / EOT Crane facility for heavy parts shifting shall be provided up to available
approach if available.
Commercial & Other Terms & Conditions:
01. Time Limit: The time limit for the work contract will be 24 Months from the date of
commencement work.
Supply Part: Party has to supply all materials at item Sr no: 1 to 3 with all mandatory spares
related to item at Sr no:01 in all respect within 06 months from date of LOI.
Work Part: Party has to complete removal of existing air washery blowers, ducts & air control
dampers and transportation of new materials from main store to air washery room, erection and
commissioning and trial for all 03 air washery blowers in all respect, erection of air duct &
installation of air control dampers i.e. item Sr no: 04 to 06 within 90days from the date of
commencement letter issued from WTPS-GSECL.
02. Penalty: If the work is not done as per specification given by the Corporation in stipulated time
in all respects, the penalty will be levied as per Corporation's rules.
Supply Portion: Any delay that may take place in the supply activities beyond contractual
cutoff period as per above cl. No. 01 in order shall be subject to penalty at 0.5% of supply
portion per week or part thereof on delayed portion subject to a maximum of 10% of total supply
value on the delay portion (i.e. End cost including GST & Cess as applicable).
Work Portion: Any delay that may take place in work activities beyond contractual cutoff date /
stipulated period i.e. as per cl. No. 01 above in the order shall be subjected to penalty at the
rate Rs. 2000 per day subjected to a maximum of 10% on end cost of work portion including
03. Payment Terms:
For Supply: Payment shall be made as per corporation‟s standard only. Payment shall be
made by the Corporation for the material supplied at 80 % against TRC within 30 days and
Balance against S.R. Note within 45 days from the date of receipt of material at our site.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
For Work: As per corporation‟s standard payment term However Payment will be done for
actual works carried out on measurement basis after successful Commissioning of entire
04. Mobilization: Party shall mobilize site as early as possible on receipt of intimation from GSECL
for mobilization of site.
05. AGREEMENT AND INDEMNITY BOND: successful bidder shall have to execute agreement
and indemnity bond on stamp paper of Rs 300/- in the prescribed form before commencement
of work. The cost of stamp paper shall be borne by the contractor.
06. Guarantee period / Warranty Period: The party shall guarantee / warranty for installed Air
washery blowers for 12 months from date of successful trial. Any defects or observation found
during Guarantee period / Warranty Period of 12 months, Party shall have to rectify the same by
replacing / repairing at free of cost.
Party shall have to make the successful trial of Air washery blowers in the each pairs of 02 no of
Blowers ( i.e. Air Washery blower A & B, Air Washery blower C & B, Air Washery blower A & C)
for 72 Hrs without any problems / defects / constrains. After successful trial of all blowers in said
patterns, MOM will be carried out and PBG period will be considered as 12 months from the
date of MOM.
07. Performance Guarantee: The Performance Guarantee for 05% of contract value (End Cost)
shall be furnished in the form of D.D. / Bank Guarantee, by the bidder for satisfactory
performance of the equipments, which should be valid for 12 months from the date of Joint
MOM after successful commissioning of air washery blowers. The PG submitted should be for
the full period i.e.12 Months from date of MOM OR whatever applicable as per Technical
Specifications and should have a clear one time validity for the full period. PG for an interim
period will not be allowed. However, in case of expiry of PG before the said period the same
should be got extended / renewed till the completion of said period by you at least one month
before the expiry of the validity failing which GSECL will be at liberty to encash the same,
without entering into further correspondence, formalities, etc. in the matter.
08. Overall lowest party shall be considered for placement of order.
09. Income Tax: TDS at prevailing rates will be deducted & certificates will be issued as per
Income Tax norms.
10. Details of P.F. code No. from the appropriate provident fund authorities and details of P.F. paid
to the employees for last six months. Certificate of separate provident fund account number.
11. Party shall have to submit the past executed purchase order for supply of 1,00,000 CMH or
higher capacity centrifugal air blower otherwise offer will not be consider .
12. Contractor shall comply with the Factory Acts, Labour Laws and Safety Laws in force and
Amended From time to time.
13. Any other rules and Regulations, Conditions etc. that are in force at present and that may be
Framed by The GSECL from time to time in connection with the Contracts will be binding and
acceptable to the Contractor.
14. GSECL reserves the right to forfeit the security deposit in case of any breach of contract and
stop dealing with party in future.
15. Party has to submit the details of PAN No and copy of the same along with the offer.
16. Any other rules and Regulations, Conditions etc. that are in force at present and that may be
Framed by The GSECL from time to time in connection with the Contracts will be binding and
acceptable to the Contractor.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
17. Gate pass & medical test related terms:
(A) New photo gate pass procedure for contract workers, following guide line should be
implemented for pre-employment check-up of medical test(form attached) in old contracts &
for new contract and it shall be considered in estimate for as & when & AOH/COH contracts.
1. X-ray chest (PA) view in 14 X 17 inch plate with reporting by qualified Radiologist.
(Maximum Up to Rs. 300/- per worker once during contract period.
2. Pulmonary function test (Maximum up to Rs. 200/- Per worker once during contract
3. Eudiometry in Sound proof cabin with reporting by qualified audiologist. (Maximum Up to
Rs. 200/- Per Worker once during contract period).
4. Random blood sugar report, complete Blood count & Urine R/M(Maximum up to Rs. 200/-
per worker once during contract period)
5. Clinical examination & consultation charge for qualified doctor having minimum MBBS
with CIH/AFIH degree for issuing fitness certificate. (Maximum up to Rs. 100/- per worker
once during contract period.
18. If required, party may visit to WTPS for pre-bid meeting, site visit and for discussion regarding
scope of supply / work during office time.
19. Vendor gets to register in VMS System through vms.guvnl.com. For registration following
documents are required. After registration vendor have to upload the invoice in the VMS system
for smooth functioning of payment.
Documents required for VMS Registration:
(1) PAN Copy
(2) GST Certificate Copy
(3) Email ID
(4) Full Name of Vendor
If any query regarding registration please mail to [email protected];
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL CONDITION AT CONTRACT.
The following are the major obligations to be fulfilled by the Contractors as per the Contract Labour
(R&A) Act 1970 and rule mentioned there under:
1. The contractor should not be allowed to engage fifty or more contract labourers without initiating
to obtain the labour license under the Contract Labour Act from the Assistant Commissioner of
Labour Nadiad (the said number i.e. fifty or more includes Supervisor and other staff).
2. The contractors shall have to obtain group insurance under WC Act before starting the work.
3. All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory, preferably
situated in the premises of Wanakbori TPS area in case of ARC/BRC works Contract. The
Contractor shall supply cost of Bank Statement duly stamped by the Concerned Bank as a token
of proof towards payment of Wages to HR Department. In Case of Non ARC/BRC works
contract, it is also expected the same practice to be adopted by the contractor. If any problem
arise for payment of wages through bank, same to be informed to chief engineer (Gen) and after
approval the payment shall be disbursed in presence of the GSECL representative and obtain
their signature in Wages Register – Form No. XVII prescribed under the Contract Labour (&A)
Act, 1970. Prior to that Contractor shall intimate the Date, Time & Mode of Payment in advance
to LWO/IRO. Contractor has also required to get the wage register of respective month certified
from LWO/IRO as per the provision laid down under the Contract Labour (R&A) Act,
4. Payment to contract labourers has to be made through Bank/Cheque/RTGS only. Wages rate for
contract labourers are applicable as per the terms and conditions of the license. The contractor
shall have to pay wages to workers as notified by Government of Gujarat, from time to time.
5. It should be ensured that all the labourers engaged by the contractor are covered under the
provident fund scheme and employee‟s pension scheme and their contribution are remitted
regularly to the concerned RPFC. The Xerox copies of challan along with ECR in this regards
should be submitted regularly in G.S.E.C.L. office.
6. In case the contractor having more than one contract in the same TPS, the contractor shall have
to submit contract wise separate list of the workmen to the concerned Officer.
7. The contractor shall have to pay wages to workers as notified by Government of Gujarat, from
time to time.
The above instructions should be followed scrupulously to avoid any undue litigation for non
compliance of Labour Law.
GENERAL CONDITION OF CONTRACT
1. LABORS LAW :
(A) Person below the age of 18 years and above 60 years should not be employed for the
1. No female worker shall be employed in the night shift between 07-00 PM to 06-00 AM.
(B) Contractor shall maintain a valid labor license under the contractor labor (Regulation
and Abolition) Act for the employing necessary manpower to be required by him in the
absence of such license the contractor shall be liable to terminated without assign any
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
reasons thereof.
(C) The contractor shall at his own expense comply with all labour laws and keep the
GSECL indemnified in respect thereof. Some of the major liabilities under various labour
and industrial laws which the contractor shall comply are as under :
2. Payment of contributing of way of Employer‟s contribution towards provident fund, family
pension scheme, deposit linked insurance scheme, administrative charges etc. at the rates
made applicable from time to time by Government of Gujarat/ Government of India or other
Statutory Authorities.
3. Payment of deposit in respect of each contract labor at rate applicable with the office of
Commissioner of Labor are as per contract labor (Regulation and Abolition) Act.
4. License fee as prescribed under the contract labor (Regulation and Abolition) Act and rules
framed there under depending upon the number of workman employed by the contractor
.License is compulsory if ten or more labors engaged due date.
5. Identity cards as prescribed under the factories act. (with photo affixed there to the same for
identification) shall be issue to workmen.
6. Payment of retrenchment compensation, notice pay and other liabilities as per Industrial
Disputes Act. Any payment to the contractor‟s employees arising out of any claim or disputes
under the industrial Disputes Act. 1947 or any other labor laws.
7. Payment of compensation in case of accidental injury shall be made as per the WC act.
8. Provision of crèche if female labor employed is more than 30 numbers.
9. Maternity leave as per the provision of the Maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from time to time from statutory Authorities like
State Government / Government of India, which the contractor shall have to comply with.
2. PROVIDENT FUND AND FAMILY PENSION SCHEME.
The contractor shall submit along with his bill (month wise) statement regarding deductions
against employees‟ provident fund and family pension scheme in respect of each concerned
employee. Provident fund and family pension scheme at the rate of 12 % of wages (or at the
rates made applicable by the Government time to time). The contractor‟s contribution and his
workers contribution towards provident fund and family pension scheme shall deposited by the
contractor with Regional Provident Fund Commissioner, Ahmedabad. In case if the contractor
deposits the contribution to the Assistant Provident Fund Commission, the zerox copy of
challans and schedule must be submitted in the office. For maintaining the CPF Account of
contractor‟s employees the contractor will have to pay administrative charges as applicable of
the emoluments of the employer of the contractor's every month.
3. GROUP INSURANCE SCHEME:
The contractor has to take Group Insurance for all workmen engaged by him and copy of the
same shall be produced to Concerned Officer
4. PAID LEAVE FACILITY :
Paid leave facility at the rate of one day for every 20 days worked by the contract, labour shall
be provided by the contractor to his workers. It shall be duly verified and approved/certified by
the authorized officer of GSECL.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
5. The contractor shall employ adequate number of experienced staff at site for daily supervision
and for maintaining of various registers and records required under the law and contracts. No
payment for such supervision shall be admissible.
6. CONTRACTOR TO INDEMINITY THE GSECL.
The contractor shall indemnity and keep indemnified the Board and every member, officer and
employees of the G.S.E.C.L. also Engineer in charge and his staff against action proceeding
claims, demands, costs and expenses whatsoever arising, out of or in connection with the
maters referred in above clauses and elsewhere and against all actions claims, demands, cost
and expenses which may be made against the G.S.E.C.L. by any workmen / employees of the
contractor or any sub contractor and/ or contractor from any liability any wise any workman
employees of the contractor or sub contractor under any laws rules or regulation having the
force of low including but not limited to claims against the owner workmen compensation Act
The employees Provident Fund 1952, and or/ the Contract labor (Abolition and Regulation) Act.
1970 the G.S.E.C.L. shall not be liable for in respect of or in consequence of any accident or
injury to workman of other person in the employment of the contractor or his sub contractor and
the contractor shall identify workman in the G.S.E.C.L. against all such damage and
compensation and against all claims, demands, proceeding costs charge and expenses what
so ever in respect thereof or in relation there to.
7. WORKMAN‟S COMPENSATION & EMPLOYER‟S LIABILITY INSURANCE :
Insurance shall be affected for all the contractor‟s employees engaged in the performance of
this contractor. If any of the work is subjected, the contractor shall require the sub contractor to
provide workman‟s compensation and Employers Liability Insurance for the letter‟s employees
are covered under this scheme.
8. Any other rules and regulation, conditions, Circulars etc., that are in force at present and that
may be framed by the GSECL From time to time in connection with contracts will be binding
and acceptable to contractor.
9. The contractor must possess separate P.F. code for the above subject work.
10. Attendance rolls shall be maintained up to date. All the written registers, Performa etc…shall
be filled up and maintained up to date and kept ready for inspection at any time or submitted in-
time to the concerned authorities as per contract labour etc. Factory Act. etc... By contractor
11. It is the responsibility of the contractor to ensure that contractor‟s employees maintain strict
discipline as regards security, methods of safe working etc, and not to cause any hindrance to
smooth running of power station or in execution of duties by GSECL staff. Any lapse in this
regard will be viewed seriously and contract is liable to be terminated. If any of contractor‟s staff
is found unsuitable or not behaving properly, the contractor shall have to remove him from the
work-site on demand by GSECL. The contractor shall have to strictly observe the rules and
conditions specified in the enclosed works contract booklet of the GSECL, which are not
modified hereunder. To keep harmonious industrial relations amongst contract labours is the
sole responsibility of the contractor. Any breach of the same will be viewed seriously.
12. Before starting the work, the contractor should contact Industrial Relation Officer/ Labour
Welfare Officer for all formalities and obtaining the gate passes of all contract labourers and for
other formalities.
13. The contractor shall deposit 15 days salary at the rate of last drawn salary for every completed
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
two years of services for each worker for the liabilities of the gratuity ( * applicable to ARC/BRC
works contract only)
Follow the following procedure at each milestone for the execution of works contract.
(a) On Commencement of Contractual Work:
(1) The Contractors shall have to obtain Photo-Gate-Pass before the commencement of contractual
work awarded. Contractor shall have to apply for the gate passes in triplicate in a prescribed
application form which is to be available from Security Section for the entry of workmen in the
(2) Such application shall have to be proceeding for the approval of Factory Manager. After
obtaining approval of Competent Authority, contractor shall have to prepare the Gate Passes
and obtain the signature of Factory Manager.
(3) If Labours are required to be engaged in Emergency during Public Holiday , Contractors Can
apply for Temporary Gate-Pass for the period of only three days with recommendation of
respective EE/SE and the same shall have to be regularized after following the procedure of
Gate Pass applications on the office working day from HR Department. It is to note that No
Temporary Gate-Pass shall be issued for the work other than acute emergency to carry out the
work in power station premises.
(4) The Contractor shall have to obtain the Group Insurance Policy under the Employee
Compensation Act, 1923 prior to commencement of work.
(5) The Contractor who intend to engaged 10 or More than 10 labours to Carry out the awarded
contractual work then necessary - Form No. V under the Contract Labour (R& A) Act, 1970 /
Form No. VI under the Interstate Migrant worker (employment regulation) rule 1979 as applicable
is to be obtained from HR Department for the purpose of obtaining Labour License from the
Licensing Authority.
(b) During Contractual Work under the progress:
1) Bill Recording Officer of User department shall have to ensure as to whether contractor has
engaged minimum number of contract workmen per day as per the terms of work order.
2) All Contractors shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through Nearest Nationalized Bank compulsory,
preferably situated in the premises of Wanakbori TPS area in case of ARC /BRC works Contract.
The Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as a
token of proof towards payment of Wages to HR Department. In Case of Non ARC/ BRC works
contract, it is also advisable the same practice to be adopted by the contractor. However in case
of inconveniency in adopting such practice , Contractor shall have to disburse the wages to
labours engaged by them on or before 7th of every month in presence of Company
representative i.e. LWO/ IRO and obtain their signature in Wages Register - Form No. XVII
prescribed under the Contract Labour (R&A) Act, 1970. Prior to that Contractor shall intimate the
Date, Time & Mode of Payment in advance to LWO / IRO. Contractor has also required to get
the wage register of respective month certified from LWO / IRO as per the provision laid down
under the Contract Labour (R&A) Act,
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
3) Submission of Statutory documents to ensure the compliances:
1) The Contractor shall have to submit following statutory documents, work order wise, under the
labour laws and EPF to the recording officer of user department for ensuring the compliances of
provision of labour laws and EPF Act for the respective working period.
(duly signed & stamp by Contractor ) - Form XVI
Copy of Wage Payment Sheet – with signature of workmen, duly signed & stamped by
Contractor - Form XVII
Copy of Bank Statement of Wage Payment (duly signed & Stamp by Concern Bank)
Copy of PF Challan along with ECR Statement
Copy of Gate Pass Permission ( duly signed by Authorities ) -
Copy of Work Order ( First Time )
Copy of Valid W.C. Policy ( First Time)
Copy of Valid Labour License ( If Applicable in case of More than 9 manpower Engaged by
Contractor for said work ) ( First Time)
Form No. XIII – Register of workers employed by Contractor ( First Time)
Place of Work and Work order number in Muster Roll- Form No. XVI& Wage Register – Form No
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Gujarat State Electricity Corporation Limited
Wanakbori Thermal Power Station, Ta: Galteshwar, Dist: Kheda -388239
Ph: 91-2699-235522 Fax: 91-2699-235607
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL CONDITIONS OF CONTRACT-SECTION:II
1. The contractor shall at their own expense make all necessary provision for housing water supply
and sanitary arrangement for their employee as well as for works and shall pay direct to the
authorities concerned all rates and taxes.
2. The contractor shall make their own arrangements for the necessary approach road, for
transport of their materials and be responsible for the Compensation on account of damage to
crop on Corporations‟ property.
3. All the royalty charges octroi other duties will be paid by the contractor and no extra could be
claimed on this account.
4. The organization will supply articles at the place and rates mentioned in schedule „A‟ of Tender
5. In case of the materials issued either through or with the recommendation of this organization it
will be absolutely necessary for the contractor to maintain a correct and honest record of the
daily consumption of the said materials/with inside particular reference to the work during the
6. The Engineer-in-charge of this department or his authorized agent shall have the right to inspect
and check the stores containing these materials and the account for these materials shall be
presented for inspection whenever asked for by them. Every facility shall be afforded by the
contractors for all these inspections Engineer-in-charge will supply the materials in any quantity
as deemed fit.
7. Godown of sheds hired or constructed for storage of controlled materials and more/ particularly
of cement shall be such as would prevent the materials from getting damages in any way.
8. It will be absolutely incumbent o the contractors to have on the site of work only such of the
materials as have been dully passed by the Engineer-in-charge Materials that have been
rejected must on no account be allowed to remain on the side and in spite of written order to do
so any such rejected material is on the site beyond a period of 48 hours, notice the Engineer-in-
charge shall have the right to remove it at the risk and cost of the contractor and even destroy it.
9. It must be distinctly understood that the conditions of the contract and of claims in respect of
extra work will not be allowed, unless the works to which they relate is clearly without the spirit
and meaning of the specifications or unless such work are ordered in writing by the Engineer-in-
charge and claimed for in specified manner.
10. On completion of the work, the site shall be cleared by the contractors within the stipulated
period, and ground brought to original state and they shall not be entitled for any extra claim on
this account.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
11. General specification of the latest edition of the P.W.D. Hand Book volume I & II shall also apply.
12. When cement is obtained through or with the recommendation or issued by the Corporation it
should be understood that the contractors will have to be very careful regarding the handling of
the cement bag so as to preserve their serviceability and quality.
13. DAMAGE CAUSES TO WORKS: The work whether fully constructed or not, and all materials,
machinery plant tools, temporary building and other things connected there shall be at the risk
and in the sole charge of the contractor until the works have been delivered, completed to the
Engineer- in-charge and certificate from him to that effect obtained until such delivery the
contractor shall at their own cost take all the precautions reasonably necessary to keep all the
aforesaid works materials machinery, plant, tools, temporary building and other things connected
with the work, free from any loss or damage and in the event to the same or any part there of
being lost or damage shall from with within possible speed, reinstate and make good such loss
or damage at contractor‟s own cost.
14. Supply of controlled articles will be invariably recommended after the actual requirements have
been carefully scrutinized. In the event of any such materials remaining in surplus in charge of
the contract, on account of some modifications either in the design or changes in construction or
any other reason will be returned to the department.
15. There will be generally no objection on the component parts of the works being given over to
responsible sub contractors but it must be borne in mind that this department would under no
circumstances recognize these sub contractors and responsibility of executing the work in
accordance with the condition of the contract will entirely rest on the main contractors. The main
contractors will therefore always have the very responsible member preferably a technical hand,
present on the works with power to sign all work order issued on the site of work and to take
requisite actions in the interest of very efficient execution of works.
16. With a view to ensure rapid progress on the works purchaser may store at work sites certain
quantities of the materials such as cement etc. and it will be incumbent on the tender to
purchase these materials, at the rates mentioned in schedule „A‟ of tender form for supply of
necessary articles, all necessary help will be tendered but in must be clearly understood that the
purchases does not accepted and responsibility for the delay that may be cause in their supply
on account of circumstances beyond the purchaser‟s control.
17. The Engineer-in-charge will fix the hours of work and no work shall be executed beyond that
period during night time or in absence of the Engineer-in-charge or his authorized agent. The
box measures shall be filled only in the presence of the Engineer-in-charge or his authorized
18. Contractor will be asked to present the sample of materials and the approved sampled will be
preserved at the site of work and no change in the approved sample will be allowed without the
written permission of the Engineer-in-charge.
19. If any work is not executed according to the specifications and the directions of the Engineer-in-
charge the same will be rejected or reduced rate will be allowed as deemed fit by the Engineer-
in-charge.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
20. Contract will have to communicate the name of his authorized agent who shall be presentation
the works and shall be authorized to sign the materials requisitions receive instruction given
verbally, or on the order book on behalf of the contractor.
21. The materials issued to the contractor as per schedule „A‟ of the tender shall not be removed
from the work and all surplus material at the end of the works which is considered serviceable
shall be returned to the organization even the unserviceable material shall be removed only with
the prior permission to the E.E. in writing.
22. The contractor will have to sign the conditions of the contract and execute the agreement, send
the list of previous works executed solvency certificates and pay up the security deposits, failing
to that the tender will be rejected and earnest money deposit will be forfeited. The value of the
stamp paper and stamp duty charges shall be borne by the contactor.
23. The contractor must arrange for all transport of materials weighting of material issued at
department stores and all such cost include in the rates of schedule „B‟ with the loss or above
percentage quoted by the contractor for finished work.
24. The competent authorities can delete to any items in the schedule „B‟ of the tender order if they
fill that the items is not essential to be executed.
25. A schedule of quantities is included in the tender document it shall definitely understood that the
Corporation does not accept any responsibility for the correctness or complication of this
schedules and this schedule is liable to alterations by commissions, deduction or additions at the
description of the Chief Engineer of as set forth in conditions of contract specific percentage less
or above shall be quoted by the contractor below the total amount of schedule „B‟. The tender
or above shall be quoted by the contractor below the total amount of schedule „B‟. The tender
documents shall be written legibly and free from grouser, over written on conversion of figures
correction where unavoidable shall be made by crossing out initialing dating and rewriting both in
figures and in words in case of my discrepancy in figures the price quoted in words shall prevail.
26. This notice to tenders shall form a part of the contract.
27. The entire work is to be completed within the stipulated time limit from the date of work order.
The contractor will not be eligible for any extra for the idle period of work or waiting period that
may be required to suit other considerations and no claim for compensation on account of such
will be considered. However in case or delay due to circumstances beyond the control contractor
either in date of commencement or due to waiting during construction extension time may be
considered for completion of work.
28. In case contractor is unable to account for full quantity of materials issued to him from the
department stores, recovery will be effected from him at cost rates or market rates prevailing at
the time of issue whichever is higher, plus 15% to cover Corporation‟s departmental supervision
charges for all material unaccounted for.
29. Scrap from reinforcement (bars below 1.25 M lengths) not be accepted back and the contractor
will be authorized to remove it from the site after completion of works and rendering of accounts
with written permission of Engineer in charge not below the rank of Executive Engineer.
30. The corporation will not be responsible for any delay in supply of controlled materials such as
M.S. Reinforcement Bars cement etc. however it will hand over to see that there in no delay of
materials.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
31. Due consideration will be given in granting extension of time for completion of the work if found
necessary on account of delay supply of materials. No claim for compensation or for damages
for extension in time shall be entertained in this account.
32. All materials inquired by the contractor shall be drawn from the stores by requisition given in
writing by the contractor at least one week before the requirement of work. The recoveries will be
affected in running payment for all material issued up to the date of measurements for the
particular bill or the quantities used in the works measured at the description of the Executive
Engineer in charge of work.
33. The contractor shall keep one full time qualified engineer at site who shall be fully authorized to
receive and comply with such instructions as given by the Executive Engineer. The names of
such Engineer with his qualification and experience shall be intimated by the contractor. The
E.E. shall have the right to demand the removal of any technical person. Skilled or unskilled work
men who in his opinion are considered to cause bad workmanship in the execution of work or to
cause indiscipline.
34. Bill shall be submitted by the contractor monthly on or before the date fixed by the E.E., for all
works executed in the previous months.
35. SUPPLY OF WATER AND ELECTRICITY: If possible water for construction purpose only may
be supplied by the Corporation at one point as decided by the Engineer & recovery for water
charges shall be effected at two percent of cost of time as executed in which the water supplied
by the Corporation is used as certified by the Engineer in charge Electric supply is required the
contractor shall be given Free of cost by GSECL. (Applicable to CIVIL WORKS only).
36. Should this tender be accepted I/We have agreed to abide by and full fill all the terms and
provision of „Tender and Contract of works‟ as applicable and in default there to forfeit and pay to
the Corporation the some of money due.
37. The work will have to be carried out in co ordination with other Agencies on the same site on
account of this in case the contractor has to stop or delay his works for same time he will not
claim anything extra only Corporation may consider to give suitable extension in time limit if
necessary on such account.
38. Any disputes arising out of the contract if not settled mutually, than the same shall be settle by
Gujarat Public Work Arbitration Tribunal act-1992.
39. Payment Terms :Payment will be done by running account bill monthly after taking joint
measurement and the contractor will be paid 100 % amount on actual execution of the work
done on satisfactorily.
40. Party shall have to carry out health check up for preparation of gate pass. Necessary charges /
bills shall be reimbursed as per C.O. circular: CEG/ACE/GEN/403, Dt. 15.02.2020 or any
amendment time to time thereof.
Medical Health Check up Guidelines:
(1) X-Ray Chest (PA) view in 14 x 17 inch plate with reporting by qualified Radiologist. (Maximum
up to Rs. 300/- per worker once during contract period).
(2) Pulmonary function test. (Maximum up to Rs. 200/- per worker once during contract period).
(3) Eudiometry in Sound proof cabin with reporting by qualified audiologist. (Maximum up to Rs.
200/- per worker once during contract period).
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(4) Random Blood Sugar report, Complete Blood Count & Urine R/M. (Maximum up to Rs. 200/- per
worker once during contract period).
(5) Clinical examination & Consultation charge for qualified doctor having minimum MBBS with
CIH/AFIH degree for issuing fitness certificate. (Maximum up to Rs. 100/- per worker once during
contract period).
Terms & Condition for Reimbursement:
(1) For Pre-employment medical health check up, Bill shall be reimbursed once during total contract
period (for as & when and AOH/COH contract) maximum up to Rs.1000/- or actual cost per
worker/labour/person, whichever is minimum after verification & recommendation by concern doctor.
In case any worker left the work in between than for replacement Worker Company will not provide
any reimbursement, however it is compulsory to submit new reports of replacement worker for
Fitness certificate at contractor‟s own expenses.
(2) For Periodic Medical examination, No reimbursement for periodic Medical examination to be
given to contract employee for whom GSECL are conducting Periodic Medical examination at
company‟s cost at TPS level. If contractor fails to undergo periodic Medical examination, they have
to undergo prescribed investigation as per hazard analysis from outside. No reimbursement to be
given for these investigations.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Annexure- “A”
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
APPLICATION FORM FOR PHOTO GATEPASSES OF CONTRACTOR & CONTRACT
01 Name And Address of The Firm
02 Name And Mobile No. Of The Contractor
& Site In-charge
03 Work Order No. & Date
04 Subject of Work
05 Name of Section
06 Duration/period of Work
07 Date of commencement
08 Contract agreements/ subletting work contract documents
with approval copy
09 Total No. of Workmen required for this work order (In Local: Out State :
Figure and words) is to be given on letterhead of Male: Male:
contractor Female: Female:
10 Labour License /IMSW License Obtained for No. of
Labours and validity thereof.
11 BOCW Registration No. and date
12 Insurance Obtained for No. of Labours and validity
13 Detail of P.F. Code No.
CERTIFICATE
I, ……………………………………Prop./Manager/In-Charge of M/s.
……………………………….give assurance that all the details related to labours as per the
attached list herewith are true and also give assurance that none of the labours are involved in
any anti-social activities or having criminal records. I am solely responsible if any dispute will
arise in future.
Signature of Sub Contractor with Rubber Signature of Contractor with Rubber Stamp
Stamp Name :
For Office Use Only
M/s. ……………………………………………………………………………………………………..will
be issued Gate Pass for the Work Order mentioned in the List attached herewith for the
…………Nos. of Labours for the period of ………………. to ……………………(03 months
only).Documents are checked & verified as per GSECL photo gate pass procedure.
Executive Engineer ( ) Superintending Engineer ( )
Signature with Stamp Signature with Stamp
Electrical Safety Officer Safety Officer/Dy. Safety Officer
Factory Medical Officer: to maintain record in form no.32 &
Security Officer
Factory Manager/Occupier
Senior SecurityOfficer: To issue gate pass & maintain record of gate passes. If any remark put
up by any officer, it will convey to Factory Manager & Occupier.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Following details shall be provided by Contractor on Company’s letter pad
Work Order No.& Date:
Subject of Work:
No. of Labours:
Details of Contractor & Contract Labour
Sr. Full Permanent Present Date Employees Identification
No. Name of Address of Address of PF Code Mark on
Worker Worker of Birth No. Body
as per id Worker /
proof Age
LIST OF DOCUMENTS ARE ATTACHED WITH APPLICATION FOR PHOTO GATEPASSES
OF CONTRACTOR & CONTRACT WORKERS
Sr. Description of documents Attached
No. YES/NO
1 Copy of Work Order
2 Copy of P. F. Code No.
3 Insurance Policy as per subject of work order under the Workmen
Compensation Act,1923
4 Contract agreements/ subletting work contract documents with approval
5 Filled Gate Pass Application Form and List of Labours in 1 Copy.
6 Self-attested Copy of Id proof of Aadhar card or Election voting card or
driving license or Passport only
7 List of Indian Standard or International Standard mark PPEs provided
to contract worker in prescribe Format as per nature of hazardous
process and operations.
PPE undertaking of Contract Agency which submitted in work tender.
8 GSECL 3D animation Safety Induction movie showing attendance
sheet copy
9 Final Safe Operating Procedure -SOP with JSA (Job Safety Analysis)
signed documents which submitted in work tender.
10 Qualification of work Supervisor, Safety supervisor, Safety Officer
11 Electrical Contractor License, Form-I& Electrical trade person
qualifications copy in Electrical work only which submitted in work
12 Gujarat BOCW registration in Form-II copy if applicable
13 Form no.10: Prescribed for report of examination of the lifting machines
like CPB, winch machine, wire rope slings D-shackles, belt slings, chain
slings, eyebolts, polyester web/round sling etc of all capacities if used.
14 Driver license of LMW, Mobile crane, tractor, fork lift photo copy, RTO
Fitness certificate in from no.33, PUC certificate, Vehicle insurance
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
policy, spark arrestor if used.
15 Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc.
measuring /testing equipment‟s /instruments if used.
16 Copy of Police Verification in respect of each contract workers
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber Stamp
Name : Name :
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Annexure- “B”
A. DECLARATION CUN INDEMNITY BOND
( On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at ------------------------- (mention location)
by M/S. ------------------------- having its Reg. office at------------------------------------------------------
(hereinafter referred to as “Contractor” which expression Shall unless it be repugnant to
the context or meaning thereof, be deemed to mean and include their respective assigns,
successor, executors, subcontractors and/or administrators) of the ONE PART in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at Wanakbori
Thermal Power Station (hereinafter referred to as the “Company” ), which expression
shall unless it be repugnant to the context or meaning thereof be deemed to mean and
include its assigns, successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of”--------
----------------------------------------------------„‟ under order No: ------------------------- dated---------------
----------“hereinafter called the “Contract”);
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall
comply with all the provisions of the Labour& Industrial Laws, as may be applicable from time to
time for the discharge and completion of the works and completion of the Works and Services
covered under said Contract Labour (R & A) Act 1970,Child Labour (Prohibition and Regulation)
Act 1986,The Employees Provident Funds & Miscellaneous Provisions Act,1952,Employees
State Insurance Act 1948, Minimum Wages Act,1948,Payment of Bonus Act,1965,Payment of
Act,1936, Employees Compensation Act.1923, Factories Act,1948 and other Labour Laws,
Rules, Notifications and Codes which are at present applicable to the contractor and which may
be applicable during the tenure of the contract (hereinafter referred as the „Laws‟).
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to
this effect and has agreed to indemnify and Company, it‟s Directors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges ,penalties,
fines, expenses ,losses, damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse,
delays, misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors,
subcontractor and/ or administrators shall be construed to be have been done by the
contractor and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to
the condition of execution of this Declaration cum Indemnity bond, the Contractor declares and
represents to the Company that the Contractor has obtained all Statutory registrations,
Certificates, licenses and approvals required under the Laws enabling the Contractor to
execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or non-compliance of
any such „Laws‟ by the Contractor in connection with the Performance of the contract, the
Contractor shall bear all the resultant whatsoever liability (ies), if any arising out thereof and
that the company , its Directors, Officers and employees, representatives, shall not be liable for
any such liability(ies). The Contractor agrees to indemnify and keep the Company and its
Directors, Officers and employees, representatives indemnifies, defend and hold harmless,
against all losses, costs, damages, claims, penalties, interest, expenses, demands, fines, legal
liability, causes of action, injury to persons, suits etc., which may be suffered, incurred,
undergone and / sustained by the Company including the Costs and expenses that may
be incurred in defending any such liability(ies) claim(S), Proceeding (S) etc. that maybe
made or taken or taken or arise on the same by any Person, body, authority,
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
government, judicial / quasi - judicial authority due to the failure or non-compliance
of any such laws and rules there under (including any amendments in acts, laws, statutes &
rules there under) of whatsoever kind and nature arising out of or in any way connected
with, whether or not such acts or omissions are actual or alleged, active or passive with
regard to the discharge of the said Contract.
4. The Contractor further declares that in case of any suit /
claim / right / damages / compensation / fine / levy / charges / expenses / losses / penalties /
costs raised by the third party, including contract labours engaged by the contractor, he
shall join such proceedings in such Suit/Court/Tribunal/Authority and effectively defend the
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims,
suits, demands, decrees, expenses that the Company may suffer to the fullest satisfaction
of the Company and if the Contractor fails to make good the same then the Company
shall have the right to recover the same and or any other loss sustained, without any
restriction or limitation, together with any other incidental expenses, costs, and all
incidental logistic expenses etc that may be suffered by the Company from the Contractor
and the Contractor hereby further confirms and declares that this Declaration cum
Indemnity Bond is irrevocable and shall be final and binding on it / him heirs, executors,
administrators, legal representatives, successors, subcontractors and assigns, wherever the
context applies. any claims, demands, shall be adjusted against any amount due and
payable to the Contractor and the Company shall have the right to withhold any amounts
due and payable to the Contractor, till the settlement of such claims, disputes to the
Contractor towards discharge of such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India and any
dispute between the parties with regard to this Declaration cum Indemnity Bond shall be
resolved through the dispute resolution process mentioned in the General Conditions of the
Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED
By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
Name: Designation: Date:
In presence of Witness
Name & Address of Witness Signature
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
“GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety Rules.
Concern principle contractors are responsible for informing & observance of these rules by their
supervisors/contract workers as well as the owner/supervisors/ workers of sub-Contractors engaged,
if any, by them for the work contract awarded to them. Prior to commencement of the work,
Contractor shall have to submit a written assurance on their letterhead to the concerned Sectional
Head / Engineer-in-charge that they have thoroughly gone through these Rules, have educated their
employees / workers of their sub contractor and will strictly observe the said Rules while execution
of work under work contract awarded to them. They will have to indemnify the company for any loss
or damage / accident / injury to the company‟s property / employee or employee of their own in
default of non - observing these rules.
(01) Contractor should issue photo gate pass f or their workers f rom GSECL Factor y
Manager as per Guj arat Factories rules, 1963 & details shall be f illed up in
GSECL gate pass f ormat as per Aadhar card /Elect ion card id proof & to f ollow
the gate pass issue procedure through concern department EE & SE, Security Officer,
LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days, Permanent
photo gate pass procedure shall be completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of
Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all
contractor workers before commencement of work & examination responsibility shall be taken
by contractor as well as concerned Head of Department .Pre-employment & Periodical medical
examination of contractor workers shall be carried out in form no.32 from GSECL Factory
Medical Officer after every six (06) months of contractor with their contractor workers.
Contractor shall be fulfilled all health requirements before commencement of work. After
completion of medical examination in form no.32/33, GSECL Factory Medical Officer shall be
signed in contract worker gate pass procedure format.
(04) If work executed outside factory premises, Principle Contractor shall be registered compulsory
under The Building & Other Construction Workers (Regulation of Employment and condition of
service) Act, 1996 and The Gujarat Building & Other Construction Workers (Regulation of
Employment and condition of service) Rules, 2003 before execution the ”building or other
construction work” means the construction, alteration, repairs, maintenance or demolition, of or,
in relation to, buildings, streets, roads, railways, tramways, airfields, irrigation, drainage,
embankment and navigation works, flood control works (including storm water drainage works),
generation, transmission and distribution of power, water works (including channels for
distribution of water), oil and gas installations, electric lines, wireless, radio, television,
telephone, telegraph and overseas communications, dams, canals, reservoirs, watercourses,
tunnels, bridges, viaducts, aqueducts, pipelines, towers, cooling towers, transmission towers
and such other work as may be specified in this behalf by the appropriate Government, by
notification but does not include any building or other construction work to which the provisions
of the Factories Act, 1948 (63 of 1948), or the Mines Act, 1952 (35 of 1952), apply.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(05) Contract worker gate pass will issue after completion of safety induction 3D animation movie &
Training record is to be maintained in IMS/OHSAS training format by TK Office/LWO.
(06) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the
issue PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles,
Driving license, Electrical contractor license, Electrical trade qualifications, Safety induction
training, SOP, supervisor qualifications etc. After fulfillment of all Safety compliances, Safety
Officer/Dy. Safety Officer shall be signed in Contract worker Gate pass procedure format.
(07) Work Contract shall be completed by principle contractor/agency/person who is awarded the
work order. Subletting of contract shall be allowed only if prior approval of Power station chief
before execution of work. Contractor/agency shall be submitted the entire subletting contract
documents with gate pass application through concern department EE & SE, LWO/DGM,
Safety Officer/Dy.Safety Officer & Factory Manager.
(08) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
Valid Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate pass
by agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar- Gujarat.
Electrical License photocopy shall be checked by Concerned HOD of Electrical
Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
(09) As per nat ure of job/work, Qualified supervisor (Diploma (Electrical/ Mechanical/Civil/C&I)
+ 3 years experiences or ITI + 10 years) shall be engaged by contract agency & qualification
certificate with experience certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/
Dy.Safety Officer /Safety Officer/Factory Manager at the time of apply gate pass.
(10) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out the
work on electrical lines and Apparatus, Contract person/worker possesses a certificate of
competency or electrical work permit, issued by the Appropriate Government. That means,
Electrical trade Qualification of contract worker/person like ITI-wireman/ Electrician, Diploma
(Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted to concern
EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory Manager at the time of apply
for photo gate pass procedure.
(11) As per nature of job/work & during capital overhauling work /Annual overhauling work /24X7
round the clock work/major shut down work, Qualified Safety Officer/Manager/Supervisor
(BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in Industrial Safety) shall be engaged by
contractor during dangerous operations/dangerous works as well as day to day dangerous
activities, safety supervision, tool box talk, Safety awareness programme, SOP preparation with
hazards & its control measures with each step , checking of lifting tools & tackles, hydra mobile
crane, Safety precautions, coordination with Safety Department etc.
(12) License of driver shall be submitted with gate pass issue application as per nature of vehicles &
the Motor vehicle Act,1988,the Central Motor Vehicles (Amendment) Rules,2016 as well as Gujarat
Motor Vehicles rules,1989 & driver license shall be checked every day by security shift in charge
before entry in the Factory premises.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(13) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent person
as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years experiences.
SOP will review & approve by concern JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer
/Safety Officer/Factory Manager before execution of work.
(14) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job
requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide
standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE issue
format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal Protective
Equipments / Safety Gadgets suitable to give sufficient protection against hazards involved in
their work / job to their staff, as per the job requirement and insist / enforce their workers to put
on the same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found
working without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI
approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 06 nos. of PPEs like Safety Shoes, Safety
Helmet, Safety goggles, Mask & Reusable Ear plug, hand gloves to their workers/supervisor
compulsory & it will check by concern section HOD & Dy. Safety Officer /Safety Officer at the
time of gate pass procedure.
Quality of PPE shall be approved from Safety Officer as per Indian Standard and International
Standard before executions of work or at the time of gate pass apply procedure.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
List of safety equipments
Industrial Safety Helmet For protection of head against falling objects or during fall of
person from height. Yellow Colour helmet is used for
contract worker with agency logo.
Safety Goggles/welding goggles/ For protection of eyes against flying particles / dust, chemical
chemical splash goggles splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust, chemical
splash, spark, arc, flashover etc.
Reusable Earplug / Ear muffs. For ear / hearing system protection while working in high
noise level area.
Chemical suit/Gas tight suit /Fire For body protection against chemicals, oils, sharp edged
proximity suit/FR Boiler Suit objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils, sharp edged
objects, heat, hot metals/objects, electricity etc.
Safety shoes/ Gum Boots with For protection of leg/feet against falling objects, sharp edged
Oil/Chemical/water/heat/ Electrical objects, heat, hot metals/objects, electricity etc..
resistance etc.
Safety Belt(full body hardness with For fall prevention while working at heights or in depth,
double lanyard & shock absorber) working in vessel or in confined space.
/ Rope / Life line / Fall arrestor
Dust Mask/Respirator with Protection of respiratory system against dust.
valve(FFP2)
Chemical Cartridge Respirator Protection against toxic chemical fumes / gases/vapors/dust
with full face mask type etc.
Trolley mounted Air line Working in oxygen deficient zone or confine space area
respirators with full face mask
Portable Single gas detector like Working in hazardous storage/process area
Chlorine, Ammonia, Hydrogen, etc
Portable Multi gas Detector (
Working in oxygen deficient zone & use in entry of confine
LEL,O2,CO,H2S,SO2, etc) space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from 01 (one) feet
distance before starting the any electrical work .
Auto darkening welding helmet The new auto darkening welding helmet combines legendary
(EN 379 & EN 175 Level-B) with Speed glass quality and auto darkening technology with an
PAPR as per EN 12941:1998, innovative wide-view grinding visor to give welders an all-in-
class TH2 and AS/NZS 1716 one solution for more flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter which
removes particles from the air. The unit provides a constant
airflow independent of filter combinations and clogging. The
unit can also be equipped with a gas filter (for example
A1B1E1). The unit supplies air to the head top via the
connecting breathing tube. The airflow creates a slight
positive pressure which together with the sealing to the face
prevents particles and other contaminants from entering the
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(15) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issue by
party/agency/contractor to their contractor workers as per nature of job and allotment of PPE
list shall be submitted to Safety Officer, WTPS on his letter head as per below mentioned
format by Contractor before commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Work order no.
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name of Desi Name Name of IS Make Qt Unit Date Recei
no. workers gnati of PPE :Code of PPE y of ving
on Sectio no. of issue signat
n PPE ure
Safety Nos.
01 Helmet
Safety Nos.
Reusable Pair
Dust Mask Nos.
Safety Pair
(16) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of all
contractor workers at entry gate of Factory Premises & shall entered contractor workers with
Safety Shoes & Safety Helmet with photo ID Gate Pass.
(17) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all contractor
workers on daily basis.
(18) During the work execution, one trained & competent supervisor of agency should always
remain present at work site. Concern JE/DE of GSECL shall be supervised the contract work as
(19) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc measuring /testing
equipments/instruments which are used during contract work shall be submitted before starting
the work & shall be checked by concern JE/DE/EE before starting work & it‟s record shall be
maintained in concern section.
(20) The contractor shall take all the required safety measures prior to commencement of work on
dangerous substances, machineries or area at which cautionary notice is displayed and obtain
“Line Clear” or “Work Permit” through the concern Department / Section JE/DE and shall be
informed to concern section JE/DE for closed/ returned after completion of work.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(21) Safety talk/Safety work instructions shall be given to contractor workers by concern JE/DE
regarding hazards of specific work, risk & it‟s control measure (mentioned in HIRA) before
starting the job work and records shall be maintained for each & every job works.
(22) Display Safety instructions shall be strictly followed by all workers who are working in factory
(23) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling work.
(24) The contractor shall be checked & securely covered or securely fenced any opened fixed
vessel, sump, tank, pit or opening in ground or in floor which, by reason of its depth, situation,
construction or contents ,is or may be a source of danger before starting the work each &
every days or after interval/recess. Contractor supervisor shall be informed to concerned HOD
regarding any unsafe conditions.
(25) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses, mobile
phone etc are to be strictly followed by all workers who are working in factory premises.
(26) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, remove all
the inflammable material lying at or nearby worksite or cover it properly by suitable protective
covering. Also, special care shall be taken before carrying out such job & see that all possible
contributing factors to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to commence the work in
fire prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments
& fire extinguishing media / material like sand / water buckets or other appropriate equipment at
such place.
(27) While carrying out work in confined space or inside vessel, obtain necessary “Confined Space
/ Vessel Entry Permit” from concerned department prior to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be
used. For taking care of the persons working inside the confined space / vessel, a supervisor /
person capable to keep continuous watch on person(s) working inside, assist them in case of
emergency or arrange to get immediate outside help, shall remain present at entry point. Use
full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants /
passers etc shall remain available near entry point or the entry point shall be cordoned by a
barricaded tape with a cautionary notice. After completion of the works, all the lids / covers /
grills / grits opened, shall be re-fixed / re-placed in the original position as it were prior to
commencement of the work and leave the work place in safe condition in all respect, so as to
prevent accident to fellow workers.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(28) The contractor shall see that he / his persons do not work on or block (by stacking material,
spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles /
staircases / ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on
which there is traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost necessary to
carry out work in such area with blocking of passage, prior permission of Competent Authority
or the Engineer-In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”,
cordon it using barricading tape & display suitable caution notice or keep a person to restrict /
divert the traffic on this route through other safe passage.
(29) The contractor shall see that he / his persons do not work on or block (by stacking material,
spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles /
staircases / ladders / lifts or any other approaches / roads leading to plans or its auxiliaries, on
which there is traffic movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost necessary to
carry out work in such area with blocking of passage, prior permission of Competent Authority
or the Engineer-In-Charge shall be obtained. To demarcate / declare the area as “UNSAFE”,
cordon it using barricading tape & display suitable caution notice or keep a person to restrict /
divert the traffic on this route through other safe passage.
(30) Prior to use power / electrically operated hand tools / equipments / machines / gadgets like
welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is
found safe to use. Do not use defective, unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be taken directly at their
own but shall be obtained through concerned Electrical Maintenance Departments or their
authorized persons or under their observations / guidance only. The Electrical Section shall
provide temporary electrical connection up to contractor‟s Mains Board on which it is
compulsory to install mains switch, ELCB & fuses of adequate capacity. All such equipments
shall invariably be earthed adequately to prevent electrical shock, sparking, short circuit etc.
Power cord to be used shall be of adequate capacity, without any joint & shall consist of earth
wire also. Hence, it is necessary to use adequate capacity 3-wire power cord for single & 5-wire
power cord for three phase power connections. The plugs, receptacles, pins, holders etc shall
be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during
work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has
specific prescribed life span shall not be used in any case if its expiry date is over.
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors, liquids,
dusts, or residues may be present in Gas Based power plant and list of tools and tackles shall
be submitted with technical bid. Non-Sparking Non-Magnetic electrical hand tools and tool kits
shall be checked by JE/DE before commencement of Electrical work.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane,
EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures),
it shall be checked and used only if found safe to use. Also, ensure that these are tested,
examined & certified in form no.10 by Competent Person as per the Factory act-1948 & Gujarat
Factories Rules and its validity do not expire. Further, it shall be fixed properly and firmly prior
to lifting the weight. Valid Test certificate of all Lifting machines used by Contractor to be
submitted to Dy.Safety Officer/ Safety Officer before commencement of work through
concerned EE/SE.
(33) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain
the work permit when working at height. While climbing on such scaffolding or working on any
structure at height, use of full body safety belt /full body hardness with double lanyard & Fall
arrestor & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant activities / works
except the work assigned to them, shall not loiter in the areas other than their work jurisdiction,
as well as shall not temper / operate / touch the machineries/equipments/auxiliaries with which
they are not concerned. Also, the contractor shall strictly instruct their staff for not to sit or take
rest at/near/below running plants, auxiliaries, systems or any place which is risky, hazardous &
prone to accident.
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due
care. To handle / shift such cylinders a special trolley /cage meant for it must be used but in no
case it should be rolled.
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated
area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on
each vehicle by party/agency and it will check by shift security in charge before entry of
vehicles in the factory premises.
(37) No women or young person shall be employed or permitted to work in Lead-compound area
like battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any part of a prime
mover or of any transmission machinery while the prime mover or transmission machinery is in
motion. Examination or operation of motion machinery shall be made or carried out only by a
specially trained adult male worker wearing tight fitting clothing as per section 22 of factories
(39) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift –in-charge well in advance.
(40) In case of noticing smoke or fire during their work execution, they shall make immediate efforts
to extinguish / control it and simultaneously inform the Fire Station Mobile No as well as Station
Fire Officer or Emergency Control room no which is displayed at prominent place of factory like
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Main Security Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station, All
security gates, Occupational Health Centre.
(41) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 &
ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety Officer
through concern Sectional Head / Engineer. The prescribed Electrical accident form no. A as
per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat Factories rules shall
be filled up by concern department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer. Electrical accident
investigation shall be carried out by Electrical Safety Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of
injured person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety
Officer/Safety Officer/Electrical Safety Officer then after injured person may allow for work.
(42) For any incident occurred but have no injury to any persons should also reported as per
GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss Incident.
(43) Safety penalty shall be imposed against Offences by contract workers: If any contract
worker worked in a factory contravenes any provision of Factories act or any rules or orders
made there under ,imposing any duty or liability on workers, contractor/agency shall be
punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at height, Rs.1000/- per day
confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not registered. Rs.750/- per person
(iv) Welding work without flashback arrestor/double gauge Rs.1000/- per set
regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature of job Rs.1000/-per day
like mechanical, electrical, civil, C&I, chemical etc.
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / tackles Rs.2000/- per
(like C.P.Bs., Hook chooks, winch, forklift, mobile crane, equipment
EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures) in Form
No.10 of Gujarat Factories Rules,1963
(ix) Work without Double lynyer Safety belt during working Rs.3000/-per person
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
at Height work, work without anchoring in hook/line line
(x) Work without 24 Volt supply in Confine space area Rs.3000/-per person
(xi) (a) Grinding machine used without safety guard / Rs. 500/- per
machine guard equipment / per set
(b) Unsafe welding machine like open body, Knob
without insulation, connection without lug
(c) Damaged welding cables/gas pipelines
(d) Welding work doing without welding blanket
(e) Electrical supply without 3 pin plug/ Industrial Plug
(f) Use of damaged electrical wire for lighting /
equipments
(g) Use of lighting lamp without cage
(h) Use of open halogen tube
(i) Use of damaged PPEs/use of non standard PPEs
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB etc.
Safety Penalty is to be imposed directly by individual Dy. Safety Officer/Safety Officer/Electrical
Safety Officer and Factory Manager/Occupier against violation of statutory requirements and
penalty will be recovered through RA bill. Photograph/CCTV camera footage is to be put up
with penalty note by imposed individual officer.
(44) Party will damage any fire equipments or property or machinery in factory during execution of
work, total damage cost will be recovered from party RA bill and recovery Office note put up by
concern HOD.
(45) All the relevant labour and industrial laws shall also be followed compulsorily.
(46) Af ter completion of work, cotton waste, grease, oil, unused material, welding
rod pieces, scrap etc. are to be removed by contra ctor and scrap shall be
deposited to scrap yard of Main Store.
(47) For performance evaluation of contractor, safety factors of work accident, fire incident & near
miss accident will be considered. Steps can be taken to review the job assignment up to
cancellation for negligence.
(48) Over & above these, contractor shall have to follow all the safety requirements /rules & regulations
/ norms and legal provisions laid down in various statutes. Particularly the provisions of The
Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended up to date), The
Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
obey the rules / regulations / instructions of the local Competent Authority for safety & health
requirements.
(49) The above rules shall be scrupulously followed and where required, Contractor /contractor workers
may contact to the Dy. Safety Officer/Safety Officer/Electrical Safety Officer in case of any
ambiguity or needs further guidance in this regard.
Chief Engineer (C&O)
GSECL, WTPS
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Section: TMD-III, WTPS
JSA for: Design, manufacture & supply of Air washery blowers & ducts, erection &
commissioning of complete Air Washery blowers & ducts and dismantling of existing air
washery blowers of 210MW Unit No.7 at WTPS .
Job Step Hazard Risk Level Control Measures
Air washery Fall of object High Area barricaded.
blowers & from height Helmet must be used by all personal in
ducts, erection barricading area.
& Close supervision required.
commissioning
of complete Air Failure of High Crane / Hydra must be operated by operator
Washery lifting tools / Confirm crane/hydra to be used as per load of
blowers & tackles vehicles.
ducts and Form no 10 must available for lifting machine is
dismantling of be used.
existing air Fall of object High Area barricaded.
washery & person in Area should be sufficient illuminated
blowers of the sump
210MW Unit Fall of High Work to done as per checklist of work at height.
No.7 at WTPS personnel &
. material from
working area
Fire High Proper house keeping to be ensured before &
after work start & completion.
HOT work must be taken when work carried out
Area should be barricaded.
Prepared by Checked by Reviewed by Approved by
(JE/DE) (EE) Officer) Factory Manager Chief Engineer
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
DECLARATION FORM
ON LETTER HEAD OF SUPPLIER
Subject: Design, manufacture & supply of Air washery blowers & ducts, erection &
commissioning of complete Air Washery blowers & ducts and dismantling of existing air
washery blowers of 210MW Unit No.7 at WTPS.
Reference No.:- WTPS/S/TECH/RFQ-72660M/TMD-3
1. I/We hereby declare that I/We have carefully & thoroughly studied the entire tender placed
on the website and General terms & conditions, technical specification, PQR and other
documents of the tender mentioned under reference along with the Commercial terms and
conditions.
2. I/We hereby confirm and certify that the offer submitted by me/us is strictly in accordance
with the GSECL‟s Tender specifications, Guaranteed Technical Particulars and drawing as
mentioned in the Tender Specifications. There is no commercial or Technical deviation
(except the deviations shown in respective Annexure-12 of Technical Deviations of this
tender document) in the offer from the Board‟s Tender Specification. I undertake to abide by
the GSECL‟s Technical specification / Guaranteed Technical Particulars / Drawing, I
undertake to supply materials strictly as per the GSECL‟s Technical specification /
Guaranteed Technical Particulars / Drawing, even if any technical deviations are mentioned
by me. I also undertake to abide by all commercial conditions of the GSECL, including
delivery schedule. I have submitted all the annexure-1 to 15,form of integrity pact etc along
with the technical Bid dully filled along with all the details”
3. I / We, hereby declare that our Technical Bid is strictly in line with the Tender specifications
(except the deviations shown in Annexure-12 of Technical Deviations of this tender
document).
4. I / We also agree that additional conditions / deviations, if any, found in the Commercial
terms & conditions (except the deviations shown in Annexure-12 of Technical Deviations of
this tender document) our offer shall be out rightly rejected without assigning any reason
5. I/We hereby abide to execute the contract agreement & submitted the same along with the
acceptance of LOI and the same will be acceptable to me/us.
6. I/We hereby accept and confirm that any dispute on this regard shall not be entertained by
7. The full value of the “Earnest Money Deposit” paid herewith should be absolutely forfeited to
the Corporation, should I/ we do not deposit the specified amount of specified Security
Deposit within 10 Days from receipt of the Letter of Intent.
8. If, I fail to submit all required documents with application or tender copy ( in each tender )
then my tender will be cancelled, which is binding to me.
authorized signatory of M/s ______________________________________________ here
by certify that M/s _________________________________________________ and their
proprietor / any partner / any directors of the firm is not stop deal and / or banned for
business dealing and / or black listed by GUVNL and / or their any subsidiary company viz.
GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL as well as Government and / or
Semi Government company / department.
10. We here by confirm that we have not stake in one or more other agencies / bidders who
are participating in same tender and if it is found that the submitted information / declaration
are wrong in the tender / enquiry as stated in tender terms, than we will be disqualified
automatically &it will be accepted to us. EMD / SD will be forfeited. More over if GSECL
shall take stern action including stop dealing with our firms which is also accepted to us
Seal of the Firm Signature of the Tenderer with Designation.
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
<On the letterhead of the vendor/ payee>
To, Date : __________
Subject : Declaration for TDS/TCS under the Income Tax Act (IT Act)
Reference : Provisions of S. 206AB/ 206CCA/139AA of the IT Act
Dear Sirs,
This is with reference to the determination of appropriate Tax deduction at source (TDS) or Tax
collected at source (TCS) as per the provisions of the Act i.e. Section 206AB/ 206CCA/139AA of the
IT Act. In relation to the said provision of the Act: I / We, having status of <<mention status i.e.
Individual/Company/ Firm etc.)>>hereby declare and confirm that: -
a) I/We have<<mention PAN>>Permanent Account Number (PAN) under the IT Act.(Copy of
PAN card is enclosed herewith.)
b) I/We have linked / will be linking Aadhar number with PAN as required under section 139AA
(2) read with Rule 114AAA.latest by 30th June
c) I/We have/have not filed income tax returns (ITR) for two previous years immediately prior to
the year in which tax is required to be deducted and for which last date of filing of income tax
return is expired u/s139(1) of the Act.
I/ We am/ are hereby attaching a copy of acknowledgment of ITR filed for any one of
previous two financial years of which due date u/s139(1) is expired, as proof of filing ITR.
(Strike out full sentence if not filed IT returns)
d) The aggregate amount of Tax Deductible at Source (TDS) and Tax Collectible at Source
(TCS) exceed/don‟t exceed Rs. 50,000 or more in each of the two aforesaid previous years
in my/our case (Vendor has to provide the extract of its Form 26AS if copy of ITR is not
provided as above)
e) I/ We shall, indemnify the Company for any consequences arising out of any acts of
commission or omission including incorrect declaration basis which the Company would act
I/We agree that Company shall determine applicability of section 206AB/206CCAof the IT Act
based on the aforesaid declaration/documents filed by me/us and would deduct TDS/TCS
accordingly. The decision of Company shall be final and acceptable to me/us. Strikeout
whichever is not applicable.
Thanking you,
Yours faithfully,
<<Signature>>
< Full Name of Vendor & seal >
BIDDER’S SIGN WITH SEAL
RFQ- 72660M Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TECHNICAL BID -RFQ- 72660M -TMD-3 .pdf
General Commercial Terms and Conditions-n procure .pdf
NIT -RFQ- 72660M -TMD-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .