Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 LAdmitted-Finance | ₹36.1 L | L1 | Admitted-Finance |
| 2 | L2₹37.1 L+₹97,635.50 (2.70%)Admitted-Finance | ₹37.1 L+₹97,635.50 (2.70%) | L2 | Admitted-Finance |
| 3 | L3₹40.9 L+₹4.8 L (13.3%)Admitted-Finance | ₹40.9 L+₹4.8 L (13.3%) | L3 | Admitted-Finance |
| 4 | L4₹41.0 L+₹4.9 L (13.7%)Admitted-Finance MAHALAKPUR NIZAMPUR AGHWANPUR ROAD AGHWANPUR MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | ₹41.0 L+₹4.9 L (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹42.2 L+₹6.1 L (16.9%)Admitted-Finance VILL BORJHAR SAIKIA CHUBURI PO DEKARGAON PS TEZPUR DIST SONITPUR ASSAM PIN 784501 | SONITPUR | ASSAM | 784501 | ₹42.2 L+₹6.1 L (16.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DRISTEE ASSOCIATES L3 | M/S SHYAMAL SARMAH L5 | M/S Bharat Construction Co. L4 | M/S PABITRA SAIKIA L2 | PIONEER INFRASTRUCTURES L1 |
|---|---|---|---|---|---|---|---|---|
| 0.00Note 1: (Applicable for all parts/items) : The bidders/contractors are advised to read tender document, all drawings & all corrigendum/amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Fixed credit has been given in technical documents which shall be taken into account during acceptance of bid/tender. | ||||||||
| 1.00 | Dismantling asbestos cement sheet, ridge (corrugated, semicorrugated, plain etc.) in roof coverings, walls, ridges etc. or of similar types complete in all respect as specified and directed. | 225 | Sqm | 65 ₹14,625 | 109.8 ₹24,705.73 | 110.36 ₹24,829.88 | 100 ₹22,500 | 40 ₹9,000 Lowest |
| 2.00 | Dismantling of floor/ wall tiles including cement mortar bedding of any thickness upto PCC/ RCC/brick surface and rubbish off the premises, complete in all respect all as specified and directed. | 134 | Sqm | 60 ₹8,040 | 108.19 ₹14,497.22 | 105.55 ₹14,143.63 | 100 ₹13,400 | 20 ₹2,680 Lowest |
| 3.00 | Taking down chowkats and shutters (without taking off shutters from the frame) n.exc 1.5 sqm each, complete in all respect as specified and directed. | 14 | Each | 280 ₹3,920 | 370.89 ₹5,192.41 | 374.63 ₹5,244.85 | 390 ₹5,460 | 150 ₹2,100 Lowest |
| 4.00 | Taking down chowkhats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm and n.exc 4 sqm each, complete in all respect as specified and directed. | 7 | Each | 380 ₹2,660 | 352.53 ₹2,467.7 | 359.72 ₹2,518.07 | 390 ₹2,730 | 150 ₹1,050 Lowest |
| 5.00 | Taking down cement plaster of any thickness and description on brick/ concrete/ stone wall/ ceilings, etc, including raking out joints, hacking for key, scrubbing down with water etc, complete in all respect as specified and directed. | 100 | Sqm | 35 ₹3,500 | 167.28 ₹16,727.82 | 157.81 ₹15,780.96 | 125 ₹12,500 | 15 ₹1,500 Lowest |
| 6.00 | M&L 15 mm thick plastering on brick/ stone/ concrete surfaces of wall in cement mortar (1:4), finished even & smooth without using extra cement, complete in all respect as speicifed and directed. | 159 | Sqm | 340 ₹54,060 | 608.33 ₹96,723.91 | 584.93 ₹93,003.76 | 500 ₹79,500 | 240 ₹38,160 Lowest |
| 7.00 | M&L 15 mm thick plastering on brick/ stone/ concrete surfaces of of wall in cement mortar (1:6), finished even and smooth without using extra cement, complete in all respect as spefied and directed. | 110 | Sqm | 320 ₹35,200 | 474.75 ₹52,223.02 | 465.45 ₹51,199.04 | 430 ₹47,300 | 240 ₹26,400 Lowest |
| 8.00 | M&L for preparation of old decorated plastered surface of wall after complete removal of existing treatment and applying two coats of weather coat over 2 mm thick wall care putty (in two layers) over a coat of primer including preparation of surface, complete in all respect as specified and directed. | 150 | Sqm | 185 ₹27,750 | 157.65 ₹23,647.73 | 156.09 ₹23,413.59 | 150 ₹22,500 | 95 ₹14,250 Lowest |
| 9.00 | M&L for preparation of newly plastered surface of wall and applying two coats of weather coat over 2 mm thick wall care putty over a coat of primer including necessary preparation of surface, complete in all respect as specified and directed. | 90 | Sqm | 175 ₹15,750 | 128.81 ₹11,592.91 | 132.79 ₹11,951.45 | 150 ₹13,500 | 72 ₹6,480 Lowest |
Tender Value
₹37.2 L
EMD Value
₹74,400
Closing Date
15 Aug 2026, 6:00 pmClosed
GE(North)Tezpur
GE(North)Tezpur Solmara PO-Dekargaon Dist - Sonitpur Assam - 784501
SPL REPAIR TO BLDG NO P-14 OF 189 FD WKSP COY AND PROVN OF TOILETS AT 142 (I) FD WKSP COY AND 284 FD WKSP COY AT NAA UNDER GE (N) TEZPUR
2026_MES_779425_1
GE(N)/TEZ/2026-27/8315
Open Tender
Civil Works
Item Rate
180 days
GE(North)Tezpur
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
Yes
GE(North)Tezpur
₹74,400
19 Sept 2026
18 Jul 2026
17 Aug 2026
18 Jul 2026
15 Aug 2026
1 Aug 2026
18 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling asbestos cement sheet, ridge (corrugated, semicorrugated, plain etc.) in roof coverings, walls, ridges etc. or of similar types complete in all respect as specified and directed. | 225 | Sqm | - | - |
| 2 | Dismantling of floor/ wall tiles including cement mortar bedding of any thickness upto PCC/ RCC/brick surface and rubbish off the premises, complete in all respect all as specified and directed. | 134 | Sqm | - | - |
| 3 | Taking down chowkats and shutters (without taking off shutters from the frame) n.exc 1.5 sqm each, complete in all respect as specified and directed. | 14 | Each | - | - |
| 4 | Taking down chowkhats or frames with shutters (without taking off shutters from the frame) exc 1.5 sqm and n.exc 4 sqm each, complete in all respect as specified and directed. | 7 | Each | - | - |
| 5 | Taking down cement plaster of any thickness and description on brick/ concrete/ stone wall/ ceilings, etc, including raking out joints, hacking for key, scrubbing down with water etc, complete in all respect as specified and directed. | 100 | Sqm | - | - |
| 6 | M&L 15 mm thick plastering on brick/ stone/ concrete surfaces of wall in cement mortar (1:4), finished even & smooth without using extra cement, complete in all respect as speicifed and directed. | 159 | Sqm | - | - |
| 7 | M&L 15 mm thick plastering on brick/ stone/ concrete surfaces of of wall in cement mortar (1:6), finished even and smooth without using extra cement, complete in all respect as spefied and directed. | 110 | Sqm | - | - |
| 8 | M&L for preparation of old decorated plastered surface of wall after complete removal of existing treatment and applying two coats of weather coat over 2 mm thick wall care putty (in two layers) over a coat of primer including preparation of surface, complete in all respect as specified and directed. | 150 | Sqm | - | - |
| 9 | M&L for preparation of newly plastered surface of wall and applying two coats of weather coat over 2 mm thick wall care putty over a coat of primer including necessary preparation of surface, complete in all respect as specified and directed. | 90 | Sqm | - | - |
| 10 | M&L for complete removal of existing treatment on wall and applying two coats of oil bound distemper (OBD) and finished another one coat with spunge roller over one coat of alkali resistant priming paint over 2 mm thick (in two layers) wall care putty, complete in all respect as specified and directed. | 280 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TenderDocuments8315.pdf
Tender Documents • 1.94 MB
BOQ_873004.xls
BOQ • 3.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .