| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L Quoted ₹10.2 L | L1 | Accepted-AOC l1 |
| 2 | L2₹10.2 LRejected-Finance GRAM CHHITONA POST MUSTAFABAD CHAUBEPUR JANPAD VARANASI | ₹10.2 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Sri Yogendra Pratap Singh L1 | M/S YOGESH KUMAR SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and disposal of damaged rein forcement concrete 1:2:4 of slab of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. | 2.28 | Cum. | 600 ₹1,368 | 605 ₹1,379.40 |
| 2.00 | Dismantling and disposal of damaged brick work of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. | 12.23 | Cum. | 290 ₹3,546.70 | 291 ₹3,558.93 |
| 3.00 | Dismantling and disposal of damaged cement concrete 1:4:8 of foundation of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. | 5.47 | Cum. | 425 ₹2,324.75 | 428 ₹2,341.16 |
| 4.00 | Earth work in excavation in foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00m. and including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc. | 329.61 | Cum. | 100 ₹32,961 | 102 ₹33,620.22 |
| 5.00 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 20 – 40 mm including all material, labour, T&P etc. | 36.13 | Cum. | 6,300 ₹2.3 L | 6,308 ₹2.3 L |
| 6.00 | First class brick work in 1:4 c.m. with first class old dismantled brick, cement and coarse sand F.M. 1.5 to 2.0 including all cast of material, labour, T&P etc. | 11.97 | Cum. | 2,755 ₹32,977.35 | 2,760 ₹33,037.20 |
| 7.00 | First class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cast of material, labour, T&P etc. | 85.32 | Cum. | 6,230 ₹5.3 L | 6,232 ₹5.3 L |
| 8.00 | Shuttering & Centering for slab and bed block including all material, labour, T&P, etc. | 18.04 | Sqm. | 642 ₹11,581.68 | 650 ₹11,726 |
| 9.00 | Reinforcement work in slab and bed block with cutting, bending, placing, binding including all material, labour, binding wire, T&P etc. | 0.59 | M. T. | 93,332 ₹55,065.88 | 93,340 ₹55,070.60 |
| 10.00 | R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cast of material, labour, T&P etc. | 6 | Cum. | 9,476 ₹56,856 | 9,480 ₹56,880 |
Tender Value
₹10.2 L
EMD Value
₹20,465
Closing Date
8 Sept 2025, 2:00 pmClosed
Executive Engineer
Chandraprabha Division PDDU Nagar Chandauli
Reconstruction of a V.R.B. at head of Kapasiya Minor of Chandraprabha Division PDDU Nagar Chandauli
2025_UPIDC_1070583_20
01/EE/2025-26
Open Tender
Civil Works
90 days
Kapasiya Minor
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,465
8 Jan 2026
2 Sept 2025
8 Sept 2025
2 Sept 2025
8 Sept 2025
2 Sept 2025
Amount
Dismantling and disposal of damaged rein forcement concrete 1:2:4 of slab of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc.
Dismantling and disposal of damaged brick work of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc.
Dismantling and disposal of damaged cement concrete 1:4:8 of foundation of bridge including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc.
Earth work in excavation in foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00m. and including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc.
C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 20 – 40 mm including all material, labour, T&P etc.
First class brick work in 1:4 c.m. with first class old dismantled brick, cement and coarse sand F.M. 1.5 to 2.0 including all cast of material, labour, T&P etc.
First class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cast of material, labour, T&P etc.
Shuttering & Centering for slab and bed block including all material, labour, T&P, etc.
Reinforcement work in slab and bed block with cutting, bending, placing, binding including all material, labour, binding wire, T&P etc.
R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cast of material, labour, T&P etc.
Wearing coat and Trough floor with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm with mechanically mixed including all cast of material, labour, T&P etc.
Deep struck pointing in 1:2 c.m. on open new brick surface with cement and coarse sand F.M. 1.5 to 2.0 including all material, labour, T&P etc.
Laying of edge brick soling in bed of canal with 1:6 c.m. and 1.5 cm. Thick cement plaster on brick lining in 1:3 c.m. with coarse sand FM. 1.5 to 2.0 including cost of all material, labour, T&P, etc.
Finishing wall with water proof cement paint of approved make such as super snowcem of required shade on new wall surface two coat over one coat primer. with this paint to give an even shade after thoroughly brushing the surface to remove all, dirt and remains loose powdered materials including curing and cost of all materials. including cost of all Material, labour T&P etc. required for proper completion.
Suplying and fixing of wheel guard stone including cst of all material, labour, t&p etc.
Earth work in correcting external section of canal by J.C.B. machine including partial compaction in layers with initial lead and lift of 5.0 m each including cost of all labour t&p etc.
Fabrication and Supplying of Sign board on angle iron framed 40x40x6 mm and 25x5 mm flat and 16 SWg M. S. sheet board size 1200 x 900 with one coat red oxide primer and two coat approved synthetic enamel paint and lettering, transporting, fixing, of Sign board at head of canalswith fixing by M-10 C. C. including cost of all material, labouras, T&P, etc. as per directed by Engineer in charge.
M/S YOGESH KUMAR SINGH (BID ID -5519937)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid