Loading…
Loading…
Tender Value
₹10.6 L
EMD Value
₹11,000
Closing Date
29 Aug 2026, 6:00 pm4d left
Executive Engineer, UNIT-1 (GWM),VADODARA
Consultancy Service for Survey and Investigation to examine Techno-economical feasibility and carry out detailed Field , Geological, Command area survey along with preparing detailed estimate, DTP for providing irrigation facility to the non-irrigated areas of Khambhat Taluka with lifting points at Ambekheda,Sevarapura and Haripura of Anand District etc .complete Please refer the Standard Bidding Document for detailed Title and Scope of work.
330538
TENDER NOTICE 03 OF 2026-27
Open
Civil - Soil investigation, Survey, Construction
Works
Vadodara
18 documents required · 18 mandatory
₹1,062
EXECUTIVE ENGINEER UNIT-1 GWM VADODARA.
₹11,000
14 Aug 2026
14 Aug 2026
14 Aug 2026
29 Aug 2026
14 Aug 2026
Name of Work :Providing consultancy service for plan estimate & detail drawings of proposed lift Irrigation schemes on
various water sources of distirct Anand, Including detail survey investigation & design of individual schemes.(Pakage-1
Memorandum showing items of work to be carried out
Estimated Rates
Quantities Total
Ite estimated Amount
m but may Item of work In figure In Words Unit according to
No. be more Rs. Ps. estimated
or less quantities
Total Detalied Contour Survey work in command area
and Detailed Longitudinal Section @ 30.0 Mt. interval
of pipe line layout system using Total Station /DGPS
Device for lift irrigation schemes at various places in Hundred Sixty
District Anand and preparation of village maps ( Six And Paise
Command Maps) showing the contour, field details
,incl.7/12 List and Level data ,ploting the details on
L.S.sheet with data summary etc.Comp.
Providing consultancy service for plan estimate & detail
drawings of proposed lift irrigation schemes on various
1 500.00 water sources of distirct Anand, based on detail survey 1545.30 Hundred Fourty Hector
investigation & design individual schemes. (six hard
copies & one editables soft copy)
In Words Ten lakh Fifty Five Thousand Nine Hundred Fifty Five Rupees Only.
The Per Hector Rate for This Work will be 2111.91 Rupees, Which is Sum of the Rates of Item no. 1 & Item no.
Deputy Executive Engineer, Executive Engineer,
SUB UNIT-1/1(GWM) UNIT-1(GWM)
Estimated Rates
Quantities Total
Ite estimated Amount
m but may Item of work In figure In Words Unit according to
No. be more Rs. Ps. estimated
or less quantities
(A) Total tendered amount Rs.
(B) Rebate on above tendered amount ( If any) ______% Rs.
(C) Net tender amount (A-B) Rs.
Note :- The other conditions of schedule - B will reamin unchanged. Contractor shall state own NIL percentage
if no reduction is offered
1) The Contractor shall exhibit a board with detailed specification and details of work asdirected by the
Engineer-In-Charge for which no extra payment shall be made.
2) The labor cess will be deducted as per prevailing rules i.e.1% of the work done.
3) GST and Income tax TDS will be deducted at a source while making payments of bills
4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Deputy Executive Engineer, Executive Engineer,
SUB UNIT 1/1(GWM) UNIT-1(GWM)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
form A (1).pdf
Schedule B Anand LI.pdf
FINAL SBD AMBEKHAD SEVARAPURA HARIPURA FINAL SUPERCEED 1 14_08.pdf
Tender Notice - 13.08.2026 -Anand LI.pdf
Corrigendum -1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].