| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.1 LAccepted-Finance | ₹39.1 L | 1 | Accepted-Finance First Lowest |
| 2 | 2₹39.4 L+₹36,398 (0.93%)Accepted-Finance | ₹39.4 L+₹36,398 (0.93%) | 2 | Accepted-Finance Last |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹39.1 L
EMD Value
₹80,000
Closing Date
7 Sept 2020, 2:00 pmClosed
Executive Engineer PD PWD Nainita
Office of the Executive Engineer PD PWD Nainita
Surface leveling, drain construction and wire fencing work in the Metropol parking at Mallital in Nainital city.
2020_pwd_25835_1
1782/17MG Dt 29-08-2020
Open Tender
Civil Works
Item Rate
120 days
Nainital
Please refer Tender documents.
1 document required · 1 mandatory
₹2,950
the Executive Engineer PD PWD Nainita
₹80,000
2 Oct 2020
27 Aug 2020
7 Sept 2020
27 Aug 2020
7 Sept 2020
27 Aug 2020
27 Aug 2020 - 7 Sept 2020
Amount
Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.Cement mortar
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1
Earth filling (For marshy soil)
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material asper direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Steel work welded in built up sections/ framed work, ncluding cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed)
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
Boom Barrier 3.0Meter Length opening/Closing Time 1.50 Sec. a remote control and Push button and Boom With reflective strips Including all Material For Proper Complition of Work.
Painting on Steel Surfaces Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701
Disposal of Malwa from different M.B. roads of Nainital city to Nainital Bypass Moter Road as per Direction of Engineer in Charge (Excluding excavation of Malwa)
SHARMA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_30574.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .