| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC LID AND EW SECTION PALLIKKATHODU GRAMA PANCHAYATH | KOTTAYAM | KERALA | 686102 | ₹20.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.8 LRejected-AOC | ₹20.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Shajimon Joseph L1 | Kurian Joseph L2 |
|---|---|---|---|---|---|
| 1.00retaining wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 91.69 | cum | 351.73 ₹32,249.42 | 354 ₹32,457.55 |
| 1.00 | OD178238/2024-2025:Dry rubble masonry with hard stone in foundation and plinth etc | 280.36 | cum | 6,162.58 ₹17.3 L | 6,249 ₹17.5 L |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.11 | cum | 10,255.91 ₹1.7 L | 10,000 ₹1.6 L |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 53.58 | sqm | 745.94 ₹39,967.47 | 700 ₹37,506 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 966.36 | kilogram | 109.93 ₹1.1 L | 105 ₹1.0 L |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
5 Feb 2026, 11:00 amClosed
Executive Engineer
Buildings Division Kottayam
A waterbody thodu is running through the sides of the sewage treatment plant site. Currently no retaining wall is present for protecting the thodu side from the sewage treatment plant and also for protecting the earth on the sides which is at a leve
2026_PWD_825954_2
PWD/BLDG/TR/20704/2024
Open Tender
Civil Works - Buildings
180 days
Kottayam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
28 Mar 2026
27 Jan 2026
7 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
retaining wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD178238/2024-2025:Dry rubble masonry with hard stone in foundation and plinth etc
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NIT.pdf
Tender Documents • 0.03 MB
BOQ_1396313.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid