Loading…
Loading…
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
29 Jun 2026, 4:00 pm
Executive Engineer PWD RandB DIVISION THANAMANDI
Executive Engineer PWD RandB DIVISION THANAMANDI
Construction Of Teacher Quarter at Boys Higher Secondary School Thanamandi Under Samagra Shiksha
2026_PWDJK_312303_1
NIT No 09 of 2026 27 Dated 12 06 2026
Open Tender
Civil Works
60 days
Thanamandi
Construction Of Teacher Quarter at Boys Higher Secondary School Thanamandi Under Samagra Shiksha
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB DIVISION THANAMANDI
₹76,000
12 Jun 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 23 | Cum | 256.85 | ₹5,907.55 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.12 | Cum | 5,202.9 | ₹5,827.25 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23 | Cum | 9,395.7 | ₹2,16,101.1 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23.21 | Cum | 9,821.85 | ₹2,27,965.14 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 6,732 | kg | 123.2 | ₹8,29,382.4 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 64.7 | Cum | 7,571.55 | ₹4,89,879.29 |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 64.7 | Cum | 1,455.65 | ₹94,180.56 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Columns, pillars, piers, abutments, posts and struts. | 185.5 | sqm | 742.55 | ₹1,37,743.03 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 144.98 | sqm | 718.2 | ₹1,04,124.64 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls | 7.62 | mtr | 262.2 | ₹1,997.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_1010885.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid