Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.4 L+₹46,000 (23.5%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.3 L+₹2.3 L (118.9%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
29 Mar 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P AND P) CD
Dismantling and re-fixing of Fume Fan suction duct of stream B, Scrubber Liquor lines and Downcomer lines of Stream A and B at NP Plant, FACT-CD during ATA 2024
2024_FACT_799290_1
04096/2023-2024/E29130
Limited
Miscellaneous Works
Item Rate
40 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD
4 documents required · 4 mandatory
₹0
₹5,000
Yes
2 Apr 2024
7 Mar 2024
30 Mar 2024
7 Mar 2024
29 Mar 2024
7 Mar 2024
Dismantling and re-fixing of Fume Fan suction duct of stream B, Scrubber Liquor lines and Downcomer lines of Stream A & B at NP Plant, FACT-CD during ATA 2024
Dismantling and re-fixing of Fume Fan suction duct of NP B stream, FACT-CD during ATA 2024 Work Involves: Collection of required tools and tackles from Workshop and tool crib, Necessary arrangements for scaffolding with proper scaffolding pipes and clamps as per IS standard and as per the site condition for the safe dismantling and re-fixing of Fume Fan duct of NP B stream, FACT-CD during ATA 2024. After getting the site clearance, provide proper hooking points at two locations-bottom and top portion of vertical duct as same as in fume fan suction duct of stream-A, dismantle the flanged joints of fume fan duct from cyclone scrubber reducer to fume fan suction reducer as per the site conditions and as per the instruction of Engineer in charge. Proper supports to be provided for holding the non dismantled duct ends at the existing elevation. Lowering/shifting the dismantled ducts in to the ground level/ear marked area for cleaning and any further shifting/movement of the ducts for the purpose of proper cleaning shall in the scope of contractor.[Cleaning of the ducts shall be NOT in the scope of contractor]. The shifting or movement of the duct must be carried out very carefully to prevent any damage to the duct shell or flanges. If any damage occurs during the shifting or lowering process, it shall be rectified at no additional cost. After getting clearance from Process department, Duct shall be fixed back with new gaskets and proper supports & clamps, and the flanged joints shall be tightened without any leak and as per the instruction of Engineer In Charge.
Dismantle and Fix back Scrubber liquor Pipelines to Facilitate Choke Clearing in NP A & B streams, FACT-CD during ATA 2024 Work Involves:- Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as the suction and discharge lines of cooler and dryer scrubber pumps, inner and outer ring header lines of cooler and dryer scrubber, and nozzles for cooler and dryer scrubbers, must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
Dismantle and Fix back Downcomer pipes from the cooler and dryer scrubber to Facilitate Choke Clearing in NP A & B streams, FACT-CD during ATA 2024 Work Involves:- Collection of required tools and tackles from workshop / tool crib. Make arrangements for dismantling the pipelines including scaffolding arrangement. Choked pipelines and fittings, such as downcomer pipes from the cooler and dryer scrubber, must be dismantled from their respective positions. Dismantling work should only commence after obtaining process clearance. Before dismantling the lines, ensure that each line is properly marked for easy reassembling the lines. After dismantling the lines, take them to the ground level for cleaning. [Cleaning of the pipes shall be NOT in the scope of contractor]. After choke clearing is completed inspect the pipelines for any leaks and after getting process clearance, fix the pipelines back in position with proper/new gaskets and bolts properly tightned. Damaged pipelines shall be replaced with spare pipelines. Service the pipelines without any leak. Dismantling and refixing of valves / control valves in the lines to cleared of chocking is under the scope of this contract.
AL GAANAM ENGINEERING WORKS
BASHEER V P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_840175.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .