| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.9 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹60.5 L+₹5.0 L (8.92%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | Rejected-Technical BHU | - | Rejected-Technical Please see summary |
| Sl No | Description | Qty | Unit | Santhi constructions L1 | SALN ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00AMC for Painting Steel Structurals in TTPL | |||||
| 1.01 | Labour charges for cleaning the surface thoroughly by chiselling, scrapping, wire brushing, sand papering and providing protective covering over the equipments, vessels and TiO2 bags etc to prevent rust and dust falling inside including charges for all tools, scaffolding etc. complete as per the direction of the Engineer in charge. | 25,000 | sqm | 15,75,000 ₹15,75,000 | 15,00,000 ₹15,00,000 Lowest |
| 1.02 | Labour charges for painting with zinc chromate primer over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports etc after cleaning the surface complete as per the direction of the Engineer in charge. | 25,000 | sqm | 13,25,000 ₹13,25,000 Lowest | 15,15,000 ₹15,15,000 |
| 1.03 | Labour Charges for painting with rubber based paint (lighty grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors, windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge. | 25,000 | sqm | 13,25,000 ₹13,25,000 Lowest | 15,15,000 ₹15,15,000 |
| 1.04 | Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge. | 25,000 | sqm | 13,25,000 ₹13,25,000 Lowest | 15,15,000 ₹15,15,000 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
7 Feb 2025, 6:00 pmClosed
HOD(Commercial.)
Travancore Titanium Products Limited Kochuveli Thiruvananthapuram
AMC for Painting Steel Structurals in TTPL
2025_TTPL_728854_1
TTP/CD/CN/NC-30/AMC_Painting Steel Structurals/24- 25
Open Tender
Miscellaneous Works
Item Rate
Travancore Titanium Products Limited
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
17 Sept 2025
22 Jan 2025
10 Feb 2025
22 Jan 2025
7 Feb 2025
22 Jan 2025
22 Jan 2025 - 7 Feb 2025
AMC for Painting Steel Structurals in TTPL
Labour charges for cleaning the surface thoroughly by chiselling, scrapping, wire brushing, sand papering and providing protective covering over the equipments, vessels and TiO2 bags etc to prevent rust and dust falling inside including charges for all tools, scaffolding etc. complete as per the direction of the Engineer in charge.
Labour charges for painting with zinc chromate primer over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports etc after cleaning the surface complete as per the direction of the Engineer in charge.
Labour Charges for painting with rubber based paint (lighty grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors, windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.
SALN ENGINEERS (BID ID -2095317)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .