| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC 57 2 BOSEPUKUR PURBA PARA KASBA KOLKATA PIN 700107 | KOLKATA | KOLKATA | WEST BENGAL | 700107 | L1 | Accepted-AOC Qualified | |
| 2 | L2₹18.5 L+₹67,968.84 (3.81%)Rejected-Finance 57 B FEEDER ROAD GROUND FLOOR 57 B FEEDER ROAD BARRACKPORE NORTH 24 PARGANAS WEST BENGAL 700120 | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L2 | Rejected-Finance Disqualified | |
| 3 | L3₹19.0 L+₹1.2 L (6.67%)Rejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L3 | Rejected-Finance Disqualified | |
| 4 | L4₹19.0 L+₹1.2 L (6.75%)Rejected-Finance 301 THIRD FLOOR DMRC BUILDING NEW ASHOK NAGAR METRO STATION NEW DELHI 110096 | NEW DELHI | NEW DELHI | DELHI | 110096 | L4 | Rejected-Finance Disqualified | |
| 5 | L5₹30.1 L+₹12.2 L (68.6%)Rejected-Finance 86 SOMNATH LAHIRI SARANI KOLKATA 700 053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | L5 | Rejected-Finance Disqualified |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
16 Sept 2022, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineeer (E)
NKDA Admin Building, DG Block, AA-1D
Supply and Installation of 24 X 7 Hours AC System for ICCC Room at NKDA Administrative Building, Action Area-ID, Newtown, Kolkata under NKDA
2022_NKDA_401340_1
NIe-Q No. 17/EE(E)/NKDA/2022-23
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
NKDA Admin Building, DG Block, AA-1D
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1 L
23 Sept 2022
2 Sept 2022
19 Sept 2022
2 Sept 2022
16 Sept 2022
2 Sept 2022
Amount
Supply of 28 HP/ (14 HP+14 HP)415v - 3 Ph - 50 Hz Top Discharge type 5th Generation Variable Refrigerant Flow system, each Outdoor unit comprises of All 100% Inverter Driven Scroll Compressors, air cooled condenser with protective coated fins, Propeller type Fan with motor, Outdoor must be capable of working within Wide Range of Voltage fluctuation from 350V to 450V, refrigerant cooled PCB, electronic expansion valve, microprocessor panel and other standard accessories as per specification. The unit shall be suitable for operation with R-410a refrigerant. The VRF Outdoor unit must be modular type so that each can be connected with each other. Supplying of VRF ODU must be connected as per Below Capacity only. Each VRF outdoor unit must consists of at least 2 nos Fully Inverter compressor, Axial Flow fans driven by Brushless DC motor. Individual outdoor unit fans must be capable of rejecting Hot Air minimum of 13800 CFM, to achieve below mentioned total cooling Capacity. The Individual modular type 100% Inverter Scroll VRF outdoor unit must be filled up with Refrigerant (R410 a) from respective ISO 9001-2008 certified VRF OEM Factory only. Outdoor Unit- Modular type VRF Outdoor unit only combination of Multiple outdoor unit, must be matching Specified technical details mentioned above as well as on Technical Specification, Make- CArrier/ Blue star/ Daikin/ Toshiba/ O general
Supply of variable refrigerant flow 230v / 1ph / 50 Hz Four way Cassette units comprising of coil, filter, fan section, inbuilt drain pump, decorative Grille. The unit shall be ceiling suspended type and complete with all standard accessories. Make- CArrier/ Blue star/ Daikin/ Toshiba/ O general a) i) 5.0 TR with 1295 CFM Air flow.
ii) 4.0 TR with 1095 CFM Air flow
iii) 3.2 TR with 1095 CFM Air flow
Supply of Touch-screen based Central controller for controlling all the units.
Supply of Cordless Remote controller
Supply of Y joints / Distribution joints.
Installation, testing and commissioning of the Cassette Unit VRF indoor units with necessary accessories
Installation, testing and commissioning of the 28 HP VRF outdoor units with controls, electrical, necessary accessories of minimum capacity
Installation, testing and commissioning of Central Controller
Top Up of Eco Friendly R410 Refrigerant
Installation, testing and commissioning of Refrigeration Network (Refnet) joints per sets as required.
Supply, installation, testing and commissioning of the following sizes Cu. refrigerant pipes duly insulated with 19mm/13mm close cell elastometric nitrite rubber insulation between each set of outdoor and indoor units (VRF). Pipe Thickness & Insulation thickness design to be recommended by VRF OEM only, and design to be submitted through OEM own software only. i)34.9mm outer dia with 19 mm thick insulation
ii) 28.6mm outer dia with 19 mm thick insulation.
iii) 22.2mm outer dia with 19 mm thick insulation.
iv) 19.1mm outer dia with 19 mm thick insulation.
v) 15.9mm outer dia with 13 mm thick insulation.
vi) 12.7mm outer dia with 13 mm thick insulation.
vii) 9.5mm outer dia with 13 mm thick insulation.
Supply, installation, testing and commissioning of PVC pipe medium class (For drainage of water from IDU) with 12 mm thick Nitrile Rubber insulation. i) 25mm NB
ii) 32mm NB
Communication Cabling between ODU and IDU as per OEM specification. 2 core x 0.75 Sq.mm
MS Structure for 28 HP Out Door Unit
Alpha Gamma Air Solutions Pvt. Ltd.
BLUE STAR LIMITED
JOHNSON CONTROLS HITACHI AIR CONDITIONING INDIA LTD.
Lyric International
INDIAN CON
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .