Tender Value
₹70.2 L
EMD Value
₹70,300
Closing Date
6 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Boriavi Nagarpalika, Boriavi.
BID DOCUMENTS FOR CONSTRUCTION WORK OF C.C. TRIMIX ROAD WITH ROAD DIVIDER FROM VERAHI MATA MANDIR TO UMIYA COLD STORAGE AT BORIAVI NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SAHERI VIKAS YOJANA ( UDP-88) YEAR: 2025-26.
278915
SJMMSVY/2025-26
Open
Civil Works - Roads
Anand
14 documents required · 14 mandatory
₹2,832
The Chief Officer, Boriavi Municipality, Boriavi
₹70,300
20 Feb 2026
20 Feb 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
Qty. Description Total Rate Unit Amount
1 387.00 Providing and laying compacted Hand Broken B.T. Metalling (25
Cmt. to 90 mm size) using Stone screening 13.2 mm of 0.16 Cmt./10
Smt. and 0.08 Cmt./10 Smt., Stone Dust including spreading in
uniform layer, watering and consolidation by vibratory roller
achived the desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
2 269.00 Providing and laying compacted B.T. Metalling (45 to 63 mm
Cmt. size) using Stone screening 13.2 mm of 0.16 Cmt./10 Smt. and
0.08 Cmt./10 Smt., Stone Dust including spreading in uniform
layer, watering and consolidation by vibratory roller achived the
desired density, as per clause.404 of M.O.R.T. & H.
specification etc. complete.
3 269.00 Providing and laying cement concrete (1:4:8) (1 Cement,
Cmt. Coarse sand, 8 Crushed stone agreegate 40 mm nominal) and
curing complete excluding cost of formwork in foundation and
4 444.50 Providing and laying cement concrete work M200 and curing
Cmt. complete excludng the cost of form work an reinforcement of
reinforced concrete work.
4 2362.50 Labour charges for concreting with vacume dewatering
Smt. Technique (Trimix or equivalent type) including loading,
unloading, carting, companing complete with "C" channelas as
per requirement and labour charges on directed by Engineer-in-
charge. 65.65 Smt.
5400.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
Kgs. including bending, binding and placing in position complete upto
floor two level.
SBD SECTION-7 BILL OF QUANTITIES-160
7 142.00 Supplying and Fixing of pre-moulded bituminous joint filler. (i)
Smt. 12mm thick as directed by Engineer-in-charge.
8 850.00 Providing 15mm thick cement plaster in single coat on Rough
Smt. (Similar)side of single or half brick walls for interior plastering
upto floor two level and finished even and smooth in (ii) Cement
mortar 1:4 (1-cement :4-sand)
9 850.00 Painting lines, deashes, arrows, letters etc on roads, Air fields
Smt. and like in two coats with road marking paint, brushing including
cleaning the surface of all dirt, dust and other foreign matter. (i)
Over 10cm in width
10 450.00 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering shuttering strutting and propping
etc. Height of propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (A) Foundations
Footings Bases of Columns etc. and Mass concrete.
11 196.50 Road marking with hot applied thermoplastic paints with
Smt. reflectorising glass beads on bitumin surface providing and
laying a hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250gms per sqm area,
thickness of 2.5mm is excluding of surface applied glass beds
as per IRC:35-2015. The finished surface to be level, uniform
and free from streaks and holes. zebra patta /bump patta
lane/center line/ edge line/cut patta. The white color marking
should provide liminance coefficinet on cemend road shalll be
min 130 mcd/m2/lux and Asphalt road shall be min
mcd/m2/lux during the service life during the day time. The
marking should meet the performance criteria for night time
reflectivity, wet reflectivity and skid resistance as mentioned in
the section-15 of IRC 35-2015. Warranty for the Retro
reflectivity should be two years. 367.72 Smt.
12 126.00 Supplying and fixing cat eye (Stimsonite) made out from Acrilo
Nos. beautile sterine injuction high compressed molding with reflector
made of MMC (prismatic type of size 12cm x 6cm x 2.5cm)
provided with bituminous adhesive 100g. with each unit for
fixing. (High Intensity grade)
SBD SECTION-7 BILL OF QUANTITIES-161
13 Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy traffic as
per IS 458-1991 specifications including setting the pipes in
C.M. 1:2 watering and laying (to level or slopes) of class NP3 of
following internal daimeters.(i) 300mm dia.
83.00 300 mm Dia NP3 659.99 Rmt.
14 22.00 Constructing Manhole with R.C.C. top slab in 1:2:4 mix (1-
Nos. cement :2-coarse sand : 4-graded stone aggregate 20mm
nominal size) foundation concrete 1:3:6 mix (1-cement : 3-
coarse sand :6-Brick bats 40 + 50mm size) inside plastering
15mm thick with Cement Mortar 1:3 (1-Cement : 3-coarse sand)
finished with a floating coat of neat cement and making
channels in cement concrete 1:2:4 mix (1-Cement :2-Coarse
sand :4-stone aggregate 20mm nominal size) finished smooth
complete including curing and festing (i) Inside size 900mm x
1200mm and 1.5M. deep including C.I. cover with frame size
560mm diameter total weight of cover and frame to be not less
than 128 kgs. (Wt. of cover 64 Kg. and Wt. of frame 64 Kg.)(A)
With 230mm thick walls of brick msonry using brick having
crushing strength not less than 35Kg. / Sq.cm. in Cement Mortar
1:5 (1- Cement: 5-Coarse sand) (1) A type depth 0.90 Metre for
150mm diameter sewer. 11042.74 No.
15 2296.00 Filling in foundation and plinth with murrum or selected soil in
Cmt layers of 20cm. thickness including watering, ramming and
consolidating etc. complete
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words)
of the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ Percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
SBD SECTION-7 BILL OF QUANTITIES-162
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for
Note :3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Signature of Contractor President Chief Officer
Boriavi Nagarpalika Boriavi Nagarpalika
Boriavi Boriavi
SBD SECTION-7 BILL OF QUANTITIES-163
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Notes.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
SBD.pdf
Download all tender documents and submit your bid