Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.8 L
EMD Value
₹17,662
Closing Date
31 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Capital Complex Division, PWD
O/o the Executive Engineer, Capital Complex Division, PWD(Buildings), Agartala
Maintenance of Govt. residential building during the year 2026-27/ SH Repair /maintenance of Type - I (63 nos) Qtrs and Type - II (151 nos) Qtrs at KTS under Central-IV Sub-Division, Kunjaban, Agartala.
2026_CEPWD_78320_1
56/DNIT/EE/CCD/PWD/2026-27
Open Tender
Civil Works
Percentage
180 days
Capital Complex, Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹17,662
16 Oct 2026
16 Oct 2026
31 Oct 2026
17 Oct 2026
31 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 2 | cum | 231.6 | ₹463.2 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,177.3 |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: | |||||
| 3.01 | 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 0.6 | cum | 10,742.6 | ₹6,445.56 |
| 3.02 | 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 0.8 | cum | 8,980 | ₹7,184 |
| 4Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: | |||||
| 4.01 | 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 0.8 | cum | 11,080.4 | ₹8,864.32 |
| 5First class brick work in foundation and plinth including cost of all materials as required complete:- | |||||
| 5.01 | In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 2 | Cum. | 9,845.2 | ₹19,690.4 |
| 6First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:- | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.51 MB
fdnit.pdf
Tender Documents • 3.09 MB
BOQ_79731.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .