Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹22.8 L+₹4.7 L (25.7%)Rejected-Finance G 58 KIRAN GARDEN UTTAM NAGAR NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹23.8 L+₹5.6 L (31.1%)Rejected-Finance PLOT NO 17 GF PRATAP NAGAR NEW DELHI 110064 | WEST | DELHI | 110064 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹28.1 L+₹9.9 L (54.8%)Rejected-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹31.0 L+₹12.9 L (71.1%)Rejected-Finance | L5 | Rejected-Finance Being L5 |
Tender Value
Refer Docs
EMD Value
₹84,720
Closing Date
21 Dec 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) PALAM, DELHI CANTT-10
GE (AF) PALAM, DELHI CANTT-10
GENP-46/2020-21 MANNING AND OPERATION OF AC PLANTS AT TECH AREA AIR FORCE STATION PALAM, DELHI CANTT-110010
2020_MES_392259_2
GENP-46/2020-21
Open Tender
Miscellaneous Services
Item Rate
330 days
GE (AF) PALAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) PALAM
₹84,720
Yes
16 Jan 2021
4 Dec 2020
22 Dec 2020
4 Dec 2020
21 Dec 2020
9 Dec 2020
60 days
Amount
Manning and Operation of Central AC Plant of capacity 2 x 13 TR to maintain the required temperature i.e. 20 degree Centigrade Plus Minus 02 degree Centigrade with relative humidity 50% plus minus 5% through out the year (7 days in a week in Two shifts (each shift of 08 hours) by deploying trademen for Central AC Plants for cooling during summer season plant meant for laboratories of 737 Boeing including checking and attending normal repair and proper functioning of plant components complete all as specified and as directed by Engr-in-charge. Petty items required for maintenance i.e. cotton waste/ dasuthi white, grease/lubricating oil etc are deemed to be included in the quoted rate of item. The plant comprising of the following :- (i) Compressor 13 TR SMC – 4 -65 with 15 HP electric Motor – 02 Nos (ii) Water circulating pump set mono block 5 HP Motor Make : Beacon-02 Nos. One running at a time. (iii) AHU with blower motor 7.5 HP including ducting- one lot. (iv) Electrical control panel comprising of starter single phase preventor and inter locking system including cabling – one lot (v) Cooling Tower FRP induced draft round bottle type with CT Motor-One The details of AC/Refg Mechanic (skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One AC/Refg Mech) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One AC/Refg Mech) Total shifts= 330x2= 660
Manning and Operation of Central AC Plant of capacity 3x 40 TR to maintain the required temperature i.e. 20 degree Centigrade Plus Minus 02 degree Centigrade with relative humidity 50% plus minus 5% through out the year (7 days in a week round the clock 24 hrs ) by deploying tradesmen in three shifts (each shift of 08 Hours) for Central AC Plant for cooling during summer season plant meant for UG base Ops and DG Sets 200 KVA (installed adjacent to AC plant) with Manual panel to be operated at the event of power failure and when required. Test run with proper record on daily log sheet showing running and POL consumption including checking and attending normal repair and proper functioning of plant/DG Set components complete all as specified and as directed by Engr-in-Charge. Petty items required for maintenance i.e. cotton waste/ dausthi white, grease/lubricating oil etc are deemed to be included in the quoted rate for item. The plant comprising of the following :- Note: (i) Compressor 12.5 TR – 12 Nos (ii) Water circulating pump set 10 HP - 02 Nos. (iii) AHU with blower motor 7.5 HP including ducting one lot – 02 Nos. (iv) Electrical control panel comprising of starter single phase preventor and inter locking system, MCCBs & cabling – one lot (v) Cooling Tower FRP induced draft round bottle type with CT Motor – One (vi) Chiller pump set 10 HP – 02 Nos The details of AC/Refg Mechanic (skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One AC/Refg Mech) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One AC/Refg Mech) (iii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One ACRefg Mech) Total shifts= 330x3= 990
Manning and Operation of VRV AC Plant of capacity 82.5 TR to maintain the required temperature i.e. 20 degree Centigrade Plus Minus 02 degree Centigrade with relative humidity 50% plus minus 5% through out the year (7 days in a week round the clock 24 hrs ) by deploying qualified operator in three shifts (each shift of 08 Hours) for VRV AC Plant for cooling during summer season plant meant for laboratories of VVIP receptorium including checking and attending normal repair and proper functioning of plant components complete all as specified and as directed by Engr-in-Charge. Petty items required for maintenance i.e. cotton waste/ dausthi white, grease/lubricating oil etc are deemed to be included in the quoted rate for item. The plant comprising of the following :- (i) Compressor – 12 Nos (ii) Indoor blower - 03 Nos (ii) Outdoor System - 06 Nos. (iv) Electrical control panel comprising of starter single phase preventor and inter locking system including cabling – one lot The details of AC Mate Mechanic (Semi-skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One AC Mate Mech) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One AC Mate Mech) (iii) 3rd shift ( 8 Hrs) - 2200 hrs to 0600 hrs (One AC Mate Mech) Total shifts= 330x3= 990
Manning and Operation of VRF AC Plant of capacity 3x50 TR to maintain the required temperature i.e. 20 degree Centigrade Plus Minus 02 degree Centigrade with relative humidity 50% plus minus 5% through out the year (7 days in a week) by deploying tradesmen in two shifts (each shift of 08 Hours) for VRF AC Plant for cooling during summer season plant meant for laboratories of New VVIP Lounge including checking and attending normal repair and proper functioning of plant components complete all as specified and as directed by Engr-in-Charge. Petty items required for maintenance i.e. cotton waste/ dausthi white, grease/lubricating oil etc are deemed to be included in the quoted rate for item. The plant comprising of the following :- (i) Compressor – 15 Nos (ii) Ceiling mounted cassette indoor unit system - 47 Nos (ii) Outdoor System - 09 Nos. (iv) Electrical control panel comprising of starter single phase preventor and inter locking system including cabling – one lot The details of Mate AC Mechanic (Semi-skilled labour) deployed are as under :- (i) 1st shift ( 8 Hrs) - 0600 hrs to 1400 hrs (One Mate Mech) (ii) 2nd shift ( 8 Hrs) - 1400 hrs to 2200 hrs (One Mate Mech) Total shifts= 330x2= 660
Total Shifts from item No 01 to 04 :- (a) Refg Mechanic (Skilled labour) =660 Shifts +990 Shifts = 1650 Shifts (a) Mate AC Mechanic (Semi Skilled labour) =990 Shifts +660 Shifts = 1650 Shifts
Rate for Refg Mechanic (Skilled) per person per day .
Rate for Mate AC Mechanic (Semi Skilled) per person per day .
Notes for item No 01 to 04 (Contd...) : - (l) In case of absence of any worker, an amount @ Rs. 2000 per person per shift or part thereof shall be recovered from the contractor’s dues as penalty and no payment shall be made to the contractor at contract rates for that particular shift(s). This penalty is in addition to any other penalty/recovery mentioned in the CA. (m) Contractor will arrange proper insurance for the tradesman and department shall not be held responsible for paying any compensation incase of any fatal accident. Any dispute with tradesman under labour act will be dealt with by the contractor with labour commissioner/ appropriate authority. (n) Staff employed at any installation can be shifted/detailed by the JEs/ Engr-in-charge wherever required in the interest of services at no extra cost. (o) 10% amount will be deducted for " Not maintained log book/Duty roaster,Non submission of requisite documents,disobey order or any duty etc assigned by JEs/Engr-in-Charge." (p) All bidders must note that minimum fare wages rate shall be reckoned as per latest circulation of Chief Labour Commissioner/ State Govt./ Union territory whichever is higher at the time of bid submission end date. It is the sole responsibility of contractor to disburse minimum fare wages to labourers according to increase rate if any during contract period. The above facts shall deemed to be included in the quoted rates and nothing extra is admissible on above account. (q) The rates quoted shall be inclusive of all taxes, levies as applicable including GST. (r) The contractor has to submit the proof of authentic document in support of ‘contribution towards EPF’ and ‘contribution towards ESIC’ such as Electronic Challan Cum Receipt of ESI and EPF Challan to the Govt. treasury at the time of claim of RAR/ Final Bill. The contractor is required to submit the EPF & ESI number of individual employee at the time of claim of RAR/ Final Bill. (s) The Government of India vide their Notification No F.No 1/20(3)/2020-LS-II dated 12 Oct 2020 has notified minimum fair wages to be paid to the labour. The rate analysis has been done based on minimum fair wages which is kept in the office of GE. If the contractor quotes rates less than minimum fair wages, then the fixed deposit of the difference amount rounded up near one thousand i.e. Amount based on Rate Analysis (-) Minus Quoted Rates will be deposited for a period not less than 03 years within 15 days from the date Acceptance failing which the same shall be deducted from the contractor's dues i.e RAR/Final bills. The Accepting Officer has full power to accept any tender as per rates in vogue. The rates quoted by the tenderer shall include the above provisions and nothing extra will be paid on these accounts.
Sumit Enterprises
M/s Durga Traders
Ridhi engineers and builders
DHAIRYAE ENTERPRISES
M/S Anand Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .