Work of replacement of rusted tower locations of 132kV D/C Achhalia-Ankleshwar Line on Loc. No. 110-126 & replacement of conductor proposed under R&M Plan 2026-27 under Asset Management Division Zagadia.
332647
TCBRH/26-27/E-140
Open
Electrical - All
Works
Bharuch
16 documents required · 16 mandatory
₹5,900
GETCO
₹63,121
7 Aug 2026
7 Aug 2026
7 Aug 2026
1 Sept 2026
7 Aug 2026
1 Tender No. TCBRH/26-27/E-140
Work of replacement of rusted tower locations of
132kV D/C Achhalia-Ankleshwar Line on Loc. No.
Works of 110-126 & replacement of conductor proposed
under R&M Plan 2026-27 under Asset
Management Division Zagadia.
3 Estimated cost with GST in Rs.
4 Tender Fee (non-refundable)including GST Rs. 8850.00 [5000 + 900 (18% GST) ]
5 Earnest Money Deposit amount in Rs.
On line (E-tendering) tender/ offer
6 submission last date up to 16.00 hours only As per schedule
(This is mandatory)
Date of opening of Tender fee, EMD cover,
7 Vendor registration and technical bid on – As per schedule [Tentative]
line opening at 16.00 Hours.
Tentative Date of on – line opening of Price Shall be intimated separately
bid, (if possible), at 11.00 Hours
10 Prices Firm
11 Time Limit 180 Days [6 Month]
12 Validity of Bid 180 days
IMPORTANT:
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original – as
specified in tender document) documents with bid and no physical document including EMD and Tender
Fee to be submitted by the bidder .
2. Bidder has to submit tender fee , EMD in form of RTGS/NEFT/ONLINE only as per date shown in table.
3. In case of Short submission of document with bid and or clarification required if any required from the
4. It is mandatory for all the bidders to submit their tender documents by on – line (E-tendering) in schedule
time. If tender documents submitted physically in that case the same tender will not be considered.
5. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain
legible (readable) and should not be password protected.
6. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s
letterhead), Tender acceptance letter (on bidder’s letterhead), price bid, tender documents specified in
the tender must be submitted through online on n-procure portal (mandatory) (All the documents to be
duly self-attested by the bidder). For any differences or wrong entry bidder shall be sole responsible for
that documents.
7. Tender will be evaluated on Data / Details / Documents of the online offer only.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
8. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder (all the
appendices (annexure)/forms etc). This is intended for transparency and speedy evaluation of the bids.
Instead of simply confirming/attached in bid/refer physical offer, the bidder shall fill in the particulars
against appropriate place in respect of each line appearing in Technical bid (In the absence of required
details in uploaded tender documents, technical bid, the purchaser has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation).
9. In the absence of required details in the online annexure, the purchaser has every right to evaluate the
bids accordingly and bidder cannot raise any objection against any point during evaluation
10. Payment of Tender fees & Earnest Money Deposit EMD. Amount should be paid by Online-payment.
Payment of Tender Fees & EMD by RTGS/NEFT/on line only. In case of payment through RTGS/NEFT
bidder has to mail following details:
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
6 Paid Amount
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can
be generated.
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No.
3 Name of Bank BANK OF BARODA
4 Branch Code DBBHRU
Shalimar Complex, Station Road,Bharuch-
5 Address of Bank
392002.Gujarat
6 IFSC Code BARB0DBBHRU
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
11. Bidders are requested to remain in touch with the website for any amendment/ corrigendum or extension
of due date etc.
12. Tender without EMD and tender fee plus GST as applicable shall be rejected.
13. No tender shall be accepted/opened in case of receipt after due date and time of tender, irrespective of
delay due to postal services or any other reasons and the Corporation shall not assume any
responsibility for late receipt of tender.
14. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
15. As per new guideline –It is mandatory to use CBud app.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(1) To do any type of digging only after prior intimation through “Call Before U Dig” App & as per
its term & condition.
(2) To use the App before commencing any type of digging anywhere in the state
Any technical questions, information and clarifications that may be required pertaining to this
enquiry should be referred to The Superintending Engineer (TR), Gujarat Energy Transmission
Corporation Limited, Circle office, Bharuch. GETCO reserves the right to reject any OR all
tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, C.O., Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part – I: Commercial Terms & Conditions
Part – II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
Note: In case bidder needs any difficulty in accessing / submission of on line bid / clarification or
if training required for participating in online tender, they can contact the following office:(n)
Procure Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Infotower, S.G. Road, Bodakdev
Ahmedabad – 380054 ( Gujarat ) Toll Free: 1-800-233-1010 ( Ext. 501, 512,516 , 517 , 525 ) , Phone
No. 079-26857315 / 316 / 317, Fax: 079-26857321 / 40007533, Email: [email protected].
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Tender No. TCBRH/26-27/E-140
Sub: Work of replacement of rusted tower locations of 132kV D/C Achhalia-
Ankleshwar Line on Loc. No. 110-126 & replacement of conductor proposed
under R&M Plan 2026-27 under Asset Management Division Zagadia.
In connection with above subject, I/we confirm the following:
1) I/we, the undersigned, have read and examined the above tender documents
in detail.
2) I / we declare that our bid is strictly in line with Tender
Specification and there is no deviation. Further, I / we also agree
that additional conditions / deviations, if any, found in bid, the
offer shall be out rightly rejected without assigning any reason
Signature of Authorized Representative of
Company / Agency
STATUS: __________________
Name of tendering Company
SEAL / STAMP
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ANNEXURE -
DETAILS OF THE FIRM
NAME OF THE FIRM:
1 Address of Registered Office
2 Contact Personal
3 Designation
4 Residential Address
5 Phone Nos. (Office and
Residential)
6 Fax No.
7 Telegraphic code
1 Address of works
2 Contact Personal
3 Designation
4 Residential Address
5 Phone Nos. (Office and
Residential)
6 Fax No.
7 Telegraphic code
8 Email Address
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ANNEXURE -
DETAILS OF THE EXPERIENCE FOR ERECTION WORK IN LAST THREE YEARS FROM THE DUE DATE OF
Sr No Name of Order Order Length Date of Order fully Status if order
Transmiss reference value of line completion executed under execution
ion line no. & Date
A Gujarat Energy Transmission Corporation Ltd., GETCO:
B OTHER STATE ELECTRICITY BOARD:
C PRIVATE FIRMS:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ANNEXURE-3
List of work completion certificate submitted with technical bid
no whom work completion
certificate issued
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Qualifying requirements
Erection of 66kV transmission lines:
Sr. Qualifying Requirements
1 Registration- The Bidders shall be strictly a GETCO registered contractor of any class.
2 Technical Criteria
Length of transmission line on towers/H frame to be tenderize – The bidder should have erected
transmission lines including foundation, tower erection and stringing of conductor and earthwire of
66kV and above class lines on towers/H frame as a Main contractor in single or multiple orders for
(a) Line length less than 5 km – Minimum 20 km line of 66kV Class/ Minimum 10 km of 132kV or
above voltage class in last 3 financial years
Note: ( Work Order and 3A certificate to be submitted by bidder)
3 Financial Criteria
1. The bidder shall submit the Bank Solvency of the amount which is 20% of the total estimated cost
of the tender.
2. Bidder's Minimum Average Annual Turnover (MAAT)^ for best three years out of last five financial
years as annualized shall not be less than the estimated amount of this tender.
^Note- “Annual gross revenue from operations / gross operating income as incorporated in the profit &
loss account excluding other operative income/other income”.
3. Last quarter’s Liquid Assets should not be less than 20 % of estimated amount as on date of
invitation of tender.
Note: For the purpose of arriving at LA Current Assets Less Inventories shall be considered.
4. Bidder’s Net Worth for Last 3 financial years should be positive.
1. Audited, Verified and Certified Practicing Chartered Accountant certificate will be considered for
Minimum Average Annual Turnover, Liquid Assets and Net worth. The provisional certificates will not
be entertained.
2. Under taking in respect of reference to NCLT under Insolvency & Bankruptcy Code. The
undertaking is to be furnished by the bidder in its bid as per the format attached and shall be deemed
to be part of the bidding schedule and submitted along with QR Bid
Undertaking
Subject:- Work Name_________________________________________________ including tender
In connection with above subject, I / We confirm that our firm is not declared in NCLT under
Insolvency
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
& Bankruptcy Code. Further, I / We also agree that, if any found NCLT under Insolvency & Bankruptcy
Code, the offer shall be out rightly rejected without assigning any reason thereof.
(Seal, Sign & Name of Authorized Signatory of Bidder)
4 1. Provident Fund Code: Separate provident fund code number towards firm registered with Regional P. F.
Commissioner.
2. Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of the Balance
sheet with profit and loss account & IT returns of last three Financial Years
3. Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing the bid
documents in case of partnership firm & self-affidavit for proprietorship firm. All such documents shall have
to be NOTARISED
4. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their firm
5. GST registration: The Bidder shall be registered under the GST Act and a certified copy of such registration
under the GST act indicating the GSTIN shall have to be submitted along with the bid by the bidder.
6. Electrical contractor’s license with latest validation
All documents submitted by bidder must be self-attested
The bidders must attach submit all above documents scanned copy on n- procure.
Note: Above technical criteria is for technical scrutiny after opening the technical bid. However, the GETCO
reserves the right to award the work to one or more bidders, considering their technical and financial capacity OR
to reject any or all tenders or accept any tender without assigning any reason thereof.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan copy of online payment receipt of Tender fee & EMD
All Pages of Technical Bid with Bidder Signature and Rubber Stamp
(encouraged for digitally signed)
3 Registration document as Approved Contractor in Appropriate Class
Work completion certificate in Form No.3A (Experience Certificate as main
contractor) only as Per Qualification Requirement
5 Bank Solvency Certificate
6 Provident Fund Code Number Documents
7 GST Registration Number Documents
Income Tax Return, Profit Loss Accounts and Balance sheet of Last Three
Financial Years
9 Nature of Firm:
Partnership deed/Latest Form-G/ POA/Authorized Signatory Certificate for
Partnership
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
10 PAN Number Document
11 Filling all Annexure
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
E-TENDER FOR THE WORK OF
Work of replacement of rusted tower locations of 132kV D/C Achhalia-Ankleshwar
Line on Loc. No. 110-126 & replacement of conductor proposed under R&M Plan
2026-27 under Asset Management Division Zagadia.
Instructions to Bidders
General Conditions of Contract
Erection Conditions of Contract
Special Conditions of Contract
Technical particulars
Forms & Appendices to be filled in by the bidders.
PART – I
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/
‘OWNER’ intends to receive bids for Work of replacement of rusted tower locations
of 132kV D/C Achhalia-Ankleshwar Line on Loc. No. 110-126 & replacement of
conductor proposed under R&M Plan 2026-27 under Asset Management Division
Zagadia. as detailed in the accompanying specifications in accordance with Terms and
Conditions herein. The bids shall be prepared and furnished as per these Instructions.
2.0 Qualification Requirements of Bidders
2.1 To be qualified for award, the bidder shall provide following satisfactory evidence
to the Owner of his capability and adequacy of resources:
a) He is a qualified and registered contractor of GETCO who is regularly executing
jobs of Work of erection of 66KV D/C, M/C lines under any Division of GETCO
including all works in the scope of the tender specification and has adequate
technical knowledge and practical experience (the Bidder shall submit documents
defining legal status, registration and principal place of business; written
power of attorney of the signatory of the bid to commit the bidder, performance
record as contractor for erection of equipments in the last three years and
details of works on hand in the past three years & contracts on hand.
b) He has adequate financial capability and stability to meet the financial
obligations arising out of the scope of works.
c) In addition, the Qualifying Requirements if any, in the ‘Special Conditions of
Contracts ‘shall also be applicable.
d) The registration with P.F. authority and labor license as per GETCO norms is
2.2 The above cited requirements are only indicative. The owner reserves the right to
requisition any other relevant information and also reserves the right to reject the
Bid proposal of any Bidder, if in the Owner’s opinion the Qualification data is
incomplete and Bidder is not qualified to perform the Contract satisfactorily.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post
Bid discussions/presentations) shall be fully borne by the Bidder. Owner will not be
responsible/liable for these costs irrespective of the course and conclusion of this
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and
equipment specifications/characteristics, the bidding procedures and the terms &
conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
g. Bid Form and Price Schedules (BF/PS-Part III)
5.0 Knowing the Bid Document
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the
conditions and contents therein, which may in any manner, affect the scope & content
of work and the costs thereof. Submission of a Bid not substantially responsive to
the Bid Document in all respects and/or failure to furnish all information required
by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
specifications or is in doubt as to the true meaning of any part, he shall make a
request, in writing not later than the date of pre Bid discussion, to the owner in
triplicate. The owner will issue explanations, interpretations and clarifications as
deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and
time stipulated in the Bid invitation, all such explanations, interpretations and
clarifications from the Owner shall be deemed as part of Bid Documents and shall
invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his
employee (s) or his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any
reason, whether at his own initiative or in response to a clarification requested by
the intending Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders
who have received the Bidding Document at the address contained in the letter of
request for issue of bidding document from the Bidders. Owner will bear no
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
responsibility or liability arising out of non-receipt of the same in time or
otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment
into account in preparing their bids, the Owner may, at his discretion, extend the
deadline for the submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given
due consideration by the Bidders while they submit their bids and shall invariably
enclose such documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bids
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the
Bid, exchanged by the Bidder and the Owner, shall be written in the English language,
provided that any printed literature furnished by the Bidder may be written in
another language so long as accompanied by an English translation of its pertinent
passages. Failure to comply with this may disqualify a bid. For purposes of
interpretation of the bid, the English translation shall govern.
8.2 Bid Format
Bidders have to make the Bid in the formats furnished with this Document. Verbatim
without adding any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions
and factors, which may have any effect on the execution of the Contract covered under
these documents and specifications. The Owner shall not entertain any request for
clarifications from the bidders, regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated
and considered while submitting the proposals. No claim for financial adjustment to
the Contract awarded under these specifications and documents will be entertained by
adjustments arising thereof shall be permitted by the Owner, which are based on the
lack of such clear information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
10.1 The Bidder shall complete the Bid form inclusive of Price Schedules; Technical Data
Requirements etc. furnished in the Bidding Documents, indicating, for the services to
be rendered, a brief description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets
the Qualification Requirements as detailed in Clause 2.0 above and Special Conditions
of Contract (including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects
and signed by wherever the Company Authorized Signatory specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause
specific ITB.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility,
completely covering all the equipment erection and other installation services
specified under the accompanying Technical Specifications. It will include among
others as specified therein the following: -
a) Receipt of equipments and material from GETCO Haldarwa / Bharuch Transmission/
Construction store and transportation, storage, preservation and conservation of
equipment at the Site.
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of
commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to
certain conditions of the bidding documents permitted by the Owner and therefore, the
Bidders are advised that while making Bid Proposals and quoting prices these
conditions may appropriately be taken into consideration. Bidders are required to
furnish a certificate in this regard as per the format provided in Special Conditions
of Contract in a separate sealed envelope containing Bid security, which shall
accompany the Technical Bid. Any Bid not accompanied by such certificate shall be
rejected by the Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete
and hence rejected.
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled
in the required schedule of Bid Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the
appropriate price schedules, enclosed in bid proposal sheets for erection, and other
services it proposes to furnish under the contract. The %(Percentage) above/below
indicated shall be inclusive of GST applicable on required inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
increase/decrease based in relation to unit rates of tender price schedule.
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the
event of withdrawal/cessation of the Supplier from Composition scheme during the
tenure of the contract, the rate (i.e. price) mentioned in the price bid shall be
final and any additional GST will have to be borne by the tenderer himself. In no
case additional amount towards GST or otherwise will be paid / reimbursed to
supplier/contractor. Further Statutory Variation clause will not be applicable in
case of Supplier /Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
COMPANY will have the option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-B). The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the
bidder intends to supply the goods / services, meaning thereby the bidder has to
supply the goods / services from the relevant declared / registered place of supply
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of
the contract and shall not be subject to variation on any account saving for change
in quantity. A bid submitted with an adjustable price quotation shall be treated as
non-responsive and rejected.
14.0 Taxes and Duties: -
14.1 As regards the income Tax, surcharge on income tax and any other tax excluding GST &
welfare cess at prevailing rate, the owner shall not bear any tax liability
whatsoever. The bidder shall be liable and responsible for payment of such taxes as
attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause 14.1 above the owner shall
have the right to make deduction at source from the amounts payable to the contractor
in respect of Income Tax (on the cost of items of supply included in the works
contract) as may be mandatory in terms of the law. The owner shall not bear any
liability in this regard but shall issue necessary certificate in respect of such
deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this
contract with effect from the next day of the date submission of the bid and if the
contractor is required to pay additional tax or duty, then the owner shall reimburse
the contractor the additional tax or duty so paid by the contractor against
submission by the contractor of documentary evidence to the satisfaction of the
owner. This provision will not be applicable to transaction between the contractor
and his sub-contractors. Besides the said statutory variation, no other statutory
variation shall be payable by the owner.
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to
those indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory
variations and variations as per Clause No. 14.3.
If the cost to the Contractor during the performance of the ‘Contract’ shall be
increased or reduced by reasons of the making, passing or promulgation of any law
after the date of submission of bid or by any order, regulation or bye-law having the
force of law the amount of such increase or reduction shall be added to or deducted
from the “Contract Price” as the case may be for direct transactions between
contractor & owner, and not for bought out items. It is the Bidders responsibility to
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
furnish details of taxes, duties, levies etc. applicable as on the date of submission
of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of
existing tax or duty or introduction of a new tax or duty applicable shall be
entertained by the Owner during the extended period of contract, if any, provided the
extension of the contract is required by causes attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction
between the contractor and the owner.
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of
Government of Gujarat the applicability of Tax (GST) etc in respect of this work and
include the same in the quoted price. No separate claim in this regard will be
entertained by the Owner, as it is the responsibility of the Bidder to pay all these
14.8 In addition, the conditions detailed under Special Conditions of Contract shall
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to
the time schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one
of the major factors in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out
in Clauses titled Insurance, in General Terms and Conditions of Contract and in
Erection Conditions of this Part-I. Bidder’s attention is specifically invited to
these clauses. Bid price shall include all the costs in fulfilling all the insurance
liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-
special equipment tools & tackles etc. which he proposes to bring to site for the
purpose of erection, handling, testing and commissioning including performance and
guarantee tests of the equipment. If any such equipment is listed anywhere else in
the proposal and not specially mentioned in the above schedule, it shall be deemed to
have been included in the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1: The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one
percent of estimated cost plus GST to be paid through RTGS/NEFT only
18.2 The bid security is required to protect the owner against the risk of Bidder’s
conduct, which would warrant the guarantee forfeiture, pursuant to relevant paras
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
elsewhere The bid guarantee shall be made payable to the Owner without any condition
whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-
responsive. No exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by
the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works
(including supplies within thirty days of letter of award of contract)
21.0 Contract Quality assurance:
21.1 The Bidder shall include in his proposal the Quality Assurance Programme containing
the overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
21.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be
followed for the execution of the Contract will be mutually discussed and agreed and
such agreed Programme shall form a part of the Contract.
21.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out
items are being supplied wherever specifically indicated in the tender document shall
supply only from those vendors. Such details shall be accompanied by their list of
previous supplies made performance reports etc. However, in case of orders are
placed, specific approval shall be obtained from the owner for the vendor-supplied
materials.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or
persons making the bid and must be signed and sealed by the Bidder with his usual
signature. The names of all persons signing should also be typed or printed below the
signature.
22.2 Bid by a partnership must be furnished with full names of all partners and be signed
with the partnership name; followed by the signature(s) and designation(s) or the
authorized partner(s) or other authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the
Corporation/Company by the President/Managing Director or by the Secretary or other
person or persons authorized to bid on behalf of such Corporation/Company in the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing
Director’, ‘Secretary’, ‘Agent’ or other designation without disclosing his Principal
will be rejected.
22.5 If it is found that two or more persons who are connected with one another either
financially or as a principal and agent have bid under different names without
disclosing their connection then such bids will be liable for rejection. Satisfactory
evidence of authority of the person signing on behalf of the Bidder shall be
furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD
forfeited.
24.0 Deadline for submission of bids:
24.1 Bids submitted by telex/telegram will not be accepted. No request from any Bidder to
the Owner to collect the proposals from airlines, cargo agent etc. shall be
entertained by the Owner.
24.3 The Owner may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner
and Bidders previously subject to the deadline will thereafter be subject to the
deadline as extended.
25.0 Late Bids
25.1 Any bid received by the Owner after the time and date fixed or extended for
submission of bids prescribed by the Owner, will be rejected and not considered for
evaluation.
26.0 Modification and withdrawal of bids:
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for
submission of bids.
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids
and the expiration of the period of bid validity specified by the Bidder on the Bid
Form. Withdrawal/modification of a bid during this interval may result in the
Bidder’s forfeiture of its bid security.
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids in the presence of Bidder’s representatives
who choose to attend on the date and time mentioned for opening of bids in the
Invitation to Bid or in case any extension has been given thereto, on the extended
bid opening date and time notified to all the Bidders who have purchased the bidding
document. The Bidder’s representatives who are present shall sign a register
evidencing their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as
the Owner, at his discretion may consider appropriate, will be announced in the
Technical Bid Opening.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
27.3 The price bids (On line) of all the “Techno-Commercial” Responsive Bidders shall be
opened in the presence of representatives (up to two per firm) of such bidders who
choose to be present. The date & time of opening the Price Bid shall be intimated to
all such qualified bidders by Fax/Telex, at least one week in advance besides
inviting final price bid if found appropriate after evaluation of Technical bids.
27.4 The Bidder’s name, lumpsum Bid Price, all discounts if any, modifications in the
Price Bid and any such other details as the Owner, at his discretion, may consider
appropriate, will be announced/ furnished in the Price Bid (On line) Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the
technical responsiveness of the bid for the complete scope of the proposal, as
covered under these specifications and documents. All technically responsive bids
shall then be examined to determine the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY
RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical
Bid and until such time official intimation of award/rejection is made by the Owner
to the Bidders. While the Bids are under consideration, Bidders and/or their
representatives and other interested parties are advised to refrain from contacting
by any means, the owner and/or his employees/representatives on the matters related
to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his
own ask the Bidder for a clarification of its bid. The request for clarification and
the response shall be in writing and no change in the price or substance of the bid
shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished,
whether the documents have been properly signed, and whether the bids are generally
30.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained
by multiplying the unit price and quantity, the unit price shall prevail and the
total price shall be corrected. If there is a discrepancy between the total bid
amount and the sum of total costs, the latter shall prevail and the total bid amount
will be corrected accordingly. If there is a discrepancy between words and figures,
the amount advantageous to the Owner will prevail. If the Bidder does not accept the
correction of the errors as above, his Bid will be rejected and the amount of Bid
Security will be forfeited. The Bidder should ensure that the prices furnished in
various price schedules are consistent with each other. In the case of any
inconsistency in the prices furnished in the specified prices schedules to be
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
identified in Bid Form for this purpose, the Owner shall be entitled to consider the
highest price for the purpose of evaluation and for the purpose of award of Contract
use the lowest of the prices in these schedules.
30.3 Prior to the detailed evaluation, the Owner will determine the substantial
responsiveness of each bid to the Bidding Document. For purpose of these Clauses, a
substantially responsive bid is one, which conforms to all the terms and conditions
of the Bidding Document without material deviations. A material deviation is one
which affects in any way the prices, quality, quantity or delivery period of the
equipment, completion of works or which limits in any way the responsibilities or
liabilities of the Bidder of any right of the Owner as required in these
specifications and documents. The Owner’s determination of a bid’s responsiveness
shall be based on the contents of the bid itself without recourse to extrinsic
30.4 A bid determined as not substantially responsive will be rejected by the Owner and
may not subsequently be made responsive by the Bidder by correction of non-
conformity.
30.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid
which does not attribute to material deviation, provided such waiver does not
prejudice or affect the relative ranking of any Bidder.
31.0 Evaluation of Price Bids:
31.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and
definition will apply: -
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the
complete scope of works.
31.2 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and
comparison shall be derived as under:
Differential Price (DP)=n1F1+n2F2….+nnFn, where F1, F2…..Fn are the various factors
in Indian Rupees per unit of parameter differential or deficiency in the equipment
and services offered as stipulated in these specifications: n1, n2…nn are the
respective parameter differential or deficiency in the corresponding units to be
determined from the Bidder’s proposal. The above factors and corresponding units of
parameter differential are derived from the Technical Specifications, Data sheets
and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a
Rupee value (D) and from the Bidding Document while evaluating the bids. In
determining the Rupee value of the deviations the Owner will use parameters
consistent with those specified in the specifications and documents and or other
information as necessary and available to the Owner.
31.3 Comparison of Bids
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The bids shall be compared on the basis of lump sum prices (i.e., for erection
services to be rendered as quoted by the Bidder) for the entire scope of the proposal
as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as
W = Q + DP + D, Where
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including
other components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine
the lowest evaluated bid and, as a result of this comparison, the lowest bid will be
AWARD OF CONTRACT
32.0 Award Criteria
32.1 The owner will award the contract to the successful Bidder, whose bid has been
determined to be substantially responsive and has been determined as the lowest
evaluated bid, providing further that the Bidder is determined to be qualified to
perform the contract satisfactorily. The Owner shall be the sole judge in this
32.2 Further, the Owner reserves the right to award separate contracts to two or more
parties in line with the terms and conditions specified in the accompanying Technical
Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding
process and reject all bids at time prior to award of contract, any without thereby
incurring any liability to the affected Bidder or Bidders or any obligation to inform
the affected Bidder or Bidders of the grounds for the Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period,
if any, the Owner will notify the successful Bidder in writing by registered letter
or e mail or FAX, to be confirmed in writing by registered letter, that his bid has
been accepted.
34.2 The notification of award will attribute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause 38 .0, the Owner will promptly notify each unsuccessful Bidder and will
discharge his bid security, pursuant to Clause 20.0.
35.0 Signing of contract:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been
accepted, the Owner will send the Bidder the detailed of Award, incorporating all
agreements between the parties.
35.2 Within 7 days of receipt of the detailed of Award, the successful bidder shall sign
the same with date and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the
same will be signed within 15 (Fifteen) days of notification of Award.
35.4 The contractor will have to give indemnity bond for material on Non-judicial Stamp
paper of value Rs. 300/- to GETCO as per attached format. The cost of stamp paper
will be borne by the contractor.
35.5 The contractor will have to give safety cum indemnity bond on Non-Judicial Stamp
paper of value Rs. 300/- to GETCO against any possible claim of compensation for
damage to contractor’s staff or any of third party during the execution of work. The
cost of stamp paper will be borne by the contractor.
35.6 Also the successful bidder will have to execute Agreement on stamp paper of value
Rs.300/- at our Transmission Circle, GETCO, Bharuch before commencement of works as
per GETCO’s prescribed Proforma .The cost of stamp paper will be borne by the
contractor.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is
awarded, shall be required to furnish a performance guarantee in form of Bank
guarantee from a Public Sector Indian bank/Scheduled, Commercial Bank in the form to
be furnished. The guarantee amount shall be equal to ten percent (10%) of the
Contract price and it shall guarantee the faithful performance of the Contract in
accordance with the terms and conditions specified in these documents and
specifications. The guarantee shall be valid up to 90 days after the end of Warranty
36.2 The Performance Guarantee shall cover additionally the following guarantees to the
a) The successful Bidder guarantees the successful and satisfactory operation of
the equipment furnished and erected under the Contract, as per the specifications
and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his
sub-vendors and installed by him shall be free from all defects in design,
material and workmanship and shall upon written notice from the Owner fully
remedy free of expenses to the Owner such defects as developed under the normal
use of the said equipment within the period of guarantee specified in the
relevant clause of the General Terms and Conditions in the Part-I/Special
Conditions of Contract.
36.3 The Contract Performance Guarantee is intended to secure the performance of the
entire contract. However, it is not to be trued as limiting the damages under clause
entitled “Equipment Performance Guarantee” in Technical Specifications, Part-II and
damages stipulated in other clauses in the Bid documents.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
36.4 The performance guarantee will be discharged without any interest at the end of
guarantee period, unless otherwise specified in Special Conditions of Contract.
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor
as per the Contract Agreement signed by the parties, including all attachments and
appendices thereto and all documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) CIRCLE GETCO, Bharuch or any of
its subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award
of the Works and shall include such successful Bidder’s legal representatives,
successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as
Engineer from time to time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment,
stores and materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as
per the Specifications and complete erection, testing and putting into satisfactory
operation including all transportation, handling, unloading and storage at the Site
as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of
the Contract and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the
works and the related facilities are to be erected or installed and any adjacent
land, paths, street or reservoir which may be allocated or used by the Owner or
Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in
his bid with additions and/or deletions as may be agreed and incorporated in the
Letter of Award and the contract agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field
activities of the works including erection, testing and putting into satisfactory
operation including successful completion of performance and guarantee tests to be
performed at Site by the Contractor including cost of insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by
the time to inspect the equipment; stores or Works under the Contract and/or the duly
authorized representative of the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’ shall mean the official notice issued
by the Owner notifying the Contractor that his bid has been accepted.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance
of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued
by the respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise
expressly defined shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or
over signature and/or seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’,
‘Proper’, ‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined
by’, ‘Accepted’, ‘Permitted’, or words and phrases of like importance are used the
approval, judgment, direction etc. is understood to be a function of the
Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be
performed by the Contractor before the work is taken over by the Owner.
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests
required to determine and demonstrate capacity, efficiency, and operating
characteristics as specified in the Contract Documents.
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance
of the Works performed under the Contract, after successful commissioning/completion
of Performance and Guarantee Tests, as specified in the accompanying Technical
Specifications or otherwise agreed in the Contract.
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-
man- ship which cannot be detected during inspection, testing etc, based on the
technology available for carrying out such tests.
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements,
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
j) Other Internationally approved standards and/or rules and regulations touching
the subject matter of the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where
the context so requires.
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and
associations or bodies of individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by
provisions in other parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be
deemed to form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents,
Instructions to Bidders, General Terms and Conditions of Contract, the Special
Conditions of Contract. and all other documents included under Part-I, Part-II
and Part-III.
b) Specifications of the erection of the equipments and other technical services to
be provided under the Contract as brought out in the accompanying Technical
Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the
letters of clarifications thereto between the Contractor and the Owner prior to
the Award of Contract except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and
special terms and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall
be referred to the Engineer whose decision shall be considered as final and binding
upon the parties.
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the
Contract, or any provision thereof, or any specification, plan, drawing, pattern,
sample or information furnished by or on behalf of the Owner in connection therewith,
to any person other than a person employed by the Contractor in the performance of
the Contract. Disclosure to any such employed person shall be made in confidence and
shall extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the
purpose of performing the Contract.
4.3 The Contractor shall not communicate or use in advertising, publicity, sales releases
or in any other medium, photographs or other reproduction of the Works under this
Contract, or descriptions of the site, dimensions, quantity, quality or other
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
information, concerning the works unless prior written permission has been obtained
from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract
documents shall remain the property of the Owner and shall be returned (in all
copies) to the Owner on completion of the Contractor’s performance under the Contract
if so required by the Owner.
5.0 TRANSMISSION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be
entered into will be treated as a single Contract. Award shall be placed on the
successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site,
unloading, storage, handling at site, installation, testing and commissioning
including performance testing in respect of all the equipment material
equipment/materials given by the owner after observing standard store procedures for
transport from owner’s stores, insurance, unloading storage handling at site
installation testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the
Contractor for executing, then the Contractor shall at the time of taking delivery of
the equipment/dispatch documents be required to execute an Indemnity Bond in favour
of the Owner in the form acceptable to the Superintending Engineer (TR.) GETCO
Bharuch for keeping the equipment in safe custody and to utilize the same exclusively
for the purpose of the said Contract. Samples of proforma for the Indemnity Bond will
be furnished during award of Contract.
5.3 The Contract shall in all respects be trued and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been
broken up into various components only for the convenience of payment under the
Contract(s) and for the measurement of deviations or modifications under the
Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts
of Bharuch shall have exclusive jurisdiction in all matters arising under this
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one
copy of the final agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the
acceptance of the Letter of Award, at the office the Owner at Bharuch on a date and
time to be mutually agreed. The Contractor shall provide for signing of the Contract,
Performance Guarantee, appropriate power of attorney and other requisite materials.
In case the Contract is to be signed beyond the stipulated time, the Bid Guarantee
submitted with the Proposal will have to be extended accordingly.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be
provided with one signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide
the Owner with copies of agreement within fifteen (15) days after the signing of the
Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this
Contract or any rights in respect thereto or to exercise any option therein provided,
shall in no way be trued to be a waiver of such provisions, rights or options or in
anyway to affect the validity of the Contract. The exercise by either party of any of
its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this
Contract shall be deemed to have been completed on the expiry of the guarantee period
as provided for under the clause entitled ‘Guarantee’ in this section of the Volume-
B. GUARANTEES & LIABILITIES
11.0 TIME – THE ESSENCE OF CONTRACT
11.1 The time and the date of completion of the Contract as stipulated in the Contract by
the Owner without or with modifications, if any, and so incorporated in the Letter of
Award, shall be deemed to be the essence of the Contract. The Contractor shall so
organize his resources and perform his work as to complete it not later than the date
agreed to.
11.2 The Contractor shall submit a detailed bar chart within the time frame agreed
consisting of adequate number of activities covering various key phases of the work
such as design, procurement, manufacturing, shipment and field erection activities
within seven (7) days of the date of LOI.
11.3 The above bar chart shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
12.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the
commencement given by the respective Transmission sub division unless otherwise
provided in LOI.
13.0 PENALTY FOR DELAY
13.1 If the Contractor fails to successfully complete the commissioning within the time
fixed under the Contract, the Contractor shall pay to the Owner as penalty a sum
specified for each specified period of delay. The details of such penalty are brought
out in the accompanying Special Conditions of Contract (SCC).
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum
of 10% of the Contract prices plus GST detailed in the Special Conditions of Contract
14.0 GUARANTEE
14.1 In the event of any emergency where in the judgment of the Engineer, delay would
cause serious loss or damages, repairs or adjustment may be made by the Engineer or a
third party chosen by the Engineer without advance notice to the Contractor and the
cost of such work shall be paid by the Contractor. In the event such action is taken
by the Engineer, the Contractor will be notified promptly and he shall assist
wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
14.2 If it becomes necessary for the Contractor to rectify or renew any defective portions
of the works the provision of this clause shall apply to portion of the works so
rectified or corrected until the expiry of six (6) months from the date of such
rectification or correction. If any defects are not rectified within a reasonable
time, the Engineer may proceed to do the work at the Contractor’s risk and cost but
without prejudice to any other rights which the Owner may have against the Contractor
in respect of such defects.
14.3 The rectification or correction of the work will be carried out free of cost by the
Contractor. If any rectification or correction is carried out on his behalf at the
site, the Contractor shall bear the cost of such rectification or correction.
14.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of
his obligations under this clause.
15.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully
assessed against the Owner or the Contractor in pursuance of the Contract. In
addition, the Contractor shall be responsible for payment of all Indian duties,
levies and taxes lawfully assessed against the Contractor for his personal income &
property only.
16.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or
agent of the Owner, for the failure, omission or neglect on the part of the
Contractor to perform any acts, matters, covenants or things under the Contract, or
for damage or injury caused by the alleged omission or negligence on the part of the
Contractor, his agents, representatives or his Sub-Contractors, or in connection with
any claim based on lawful demands of Sub-Contractors, workmen, suppliers or
employees, the Contractor shall in all such cases indemnify and keep the Owner, and
the Engineer and/or his representative, harmless from all losses, damages, expenses
or decrees arising of such action.
17.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of
the Contractor from all his liabilities under the Contract. Such final payment shall
be made only at the end of the Guarantee/Warranty period or after finalization of
material account and final bill and till such time as the Contractual liabilities and
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
responsibilities of the Contractor, shall prevail. All other payments made under the
Contract shall be treated as on-account payments.
18.0 ENGINEER’S DECISION
19.0 In respect of all matters which are left to the decision of the Engineer including
the granting or with-holding of the certificates, the Engineer shall, if required to
do so by the Contractor, give in writing a decision thereon.
19.1 If, in the opinion of the Contractor, a decision made by the Engineer is not in
accordance with the meaning and intent of the Contract, the Contractor may file with
the Engineer, within fifteen (15) days after receipt of the decision, a written
objection to the decision.
Failure to file an objection within the allotted time will be considered as an
acceptance of the Engineer’s decision and the decision shall become final and
19.2 The Engineer’s decision and the filing of the written objection thereto shall be a
condition precedent to the right to request arbitration. It is the intent of the
Agreement that there shall be no delay in the execution of the works and the decision
of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works
(hereinafter referred to as ‘variation’) under the Contract as detailed in the
Contract Documents, shall be made by the Contractor except as directed in writing by
the Engineer, but the Engineer shall have full powers subject to the provisions
hereinafter contained, from time to time during the execution of the Contract, by
notice in writing to instruct the Contractor to make such variation without prejudice
to the Contract. The Contractor shall carry out such variation and be bound by the
same conditions as far as applicable as though the said variations occurred in the
Contract Documents. If any suggested variations would, in the opinion of the
Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and
the Engineer shall decide forthwith whether or not, the same shall be carried out and
if the Engineer confirms his instructions, the Contractor’s obligations and
guarantees shall be modified to such an extent as may be mutually agreed. Any agreed
difference in cost occasioned by any such variation shall be added to or deducted
from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice
shall be given to the Contractor to enable him to work his arrangement accordingly,
and in cases where goods or materials are already prepared or any design, drawings or
pattern made or work done as per the contract requires to be altered, a reasonable
and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to
the requirement of carrying out the alterations or additional or substituted work
which either then or later on, will in the opinion of the Contractor, involve a claim
for additional payment, the Contractor shall immediately and in no case later than
thirty (30) days, after receipt of the instructions aforesaid and before carrying out
the instructions, advise the Engineer to that effect. But the Engineer shall not
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
become liable for payment of any charges in respect of any such variations, unless
the instructions for the performance of the same shall be confirmed in writing by the
20.4 If any variation in the Works results in reduction of Contract Price, the parties
shall agree, in writing, so to the extent of any change in the price, before the
Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of
the said sum, the decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the
full power to instruct the Contractor, in writing, during the execution of the
Contract to vary the quantities of the items or groups of items in accordance with
the provisions of clause entitled ‘Change of Quantity’ in section GCC of this Volume-
I. The Contractor shall carry out such variations and be bound by the same
conditions as though the said variations occurred in the Contract Documents.
However, the Contract Price shall be adjusted at the rates and the prices provided
for the original quantities in the Contract.
21.0 CHANGE OF QUANTITY
21.1 During the execution of the Contract, the Owner reserves the right to increase or
decrease the quantities of items under the Contract but without any change in unit
price or other terms & conditions. Such variations unless otherwise specified in the
accompanying Special Conditions of Contract and/or Technical Specifications, shall
not be subjected to any limitation for the individual items but the total variations
in all such items under the Contract shall be limited to a percentage of the Contract
price as specified in the Special Conditions of Contract.
21.2 The Contract price shall accordingly be adjusted based on the unit rates available in
the Contract for the change in quantities as above.
22.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and
Consulting Engineers and freely exchange with them such technical information as is
necessary to obtain the most efficient and economical design and to avoid unnecessary
duplication of efforts. The Engineer shall be provided with three copies of all
correspondence addressed by the Contractor to other Contractors and Consulting
Engineers of the Owner in respect of such exchange of technical information, wherever
23.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials,
employees, or agents nor any order by the Owner or the Engineer for payment of money
or any payment for or acceptance of, the whole or any part of the Works by the Owner
or the Engineer, nor any extension of time, nor any possession taken by the Engineer
shall operate as a waiver of any provision of the Contract, or of any power herein
reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
24.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
No interim payment certificate of the Engineer, nor any sum paid on account by the
Owner, nor any extension of time for execution of the Works granted by the Engineer
shall affect or prejudice the rights of the Owner against the Contractor or relieve
the Contractor of his obligation for the due performance of the Contract, or be
interpreted as approval of the Works done or of the equipment furnished and no
certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge
the liability of the Contractor for the payment of damages whether due, ascertained,
or certified or not or any sum against the payment of which he is bound to indemnify
the Owner, nor shall any such certificate nor the acceptance by him of any sum paid
on account or otherwise affect or prejudice the rights of the Owner against the
Contractor.
25.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor
shall at his own cost submit periodic progress reports as may be reasonably required
by the Engineer with such materials as, charts, net-works, photographs, test
certificates, etc. Such progress reports shall be in the form and size as may be
required by the Engineer.
26.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment
furnished and erected by the Contractor, the Engineer shall issue to the Contractor a
Taking Over Certificate as a proof of the final acceptance of the equipment. Such
certificate shall not unreasonably be withheld nor will the Engineer delay the
issuance thereof on account of minor omissions or defects which do not affect the
commercial operation and/or cause any serious risk to the equipment. Such certificate
shall not relieve the Contractor of any of his obligations which otherwise survive,
by the terms and conditions of the Contract after issue of such certificate.
27.0 PAYMENT
27.1 The payment to the Contractor for the performance of the works under the Contract
will be made by the Owner as per the guidelines and conditions specified herein. All
payments made during the Contract shall be on account payments only. The final
payment will be made on completion of all Works and on fulfillment by the Contractor
of all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
27.3 Terms.
Payment terms will be as prescribed in the special conditions of contract and on
fulfillment of conditions specified thereof.
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed Performa of
the Owner. Performa for application for payment will be as prescribed.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
29.1 Each such application shall state the amount claimed and shall set forth in detail,
in the order of the Payment Schedule, particulars of the Works including the Works
executed at Site and of the equipment shipped/brought on to the site pursuant to the
Contract up to the date mentioned in the application and for the period covered since
the last preceding certificate, if any.
29.2 Every interim payment certificate shall certify the Contract value of the Works
executed upto the date mentioned in the application for the payment certificate,
provided that no sum shall be included in any interim payment certificate in respect
of the works that, according to the decision of the Engineer, does not comply with
the Contract.
29.3 Mode of Payment
29.4 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank
or directly to the Contractor as per the payment schedule.
29.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible)
inland transportation (including port handling), insurance and the erection portion
of the Works shall be made direct to the Contractor by the Owner.
29.6 All payments under the Contract shall be made as stipulated in the Special Conditions
of Contract after signing the Contract Agreement. The payments linked with the
dispatch of materials shall only be made after production of all dispatch documents
as specified in the relevant Contract conditions which will interalia include the
Material Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of
certificates by the Engineer, one for the quantum of work completed and the other for
the successful completion of quality check points involved in the quantum of work
30.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by
the Owner. The Owner to the Contractor shall bill all such claims regularly as and
when they fall due. Such bills shall be supported by appropriate and certified
vouchers or explanations, to enable the Contractor to properly identify such claims.
Such claims shall be paid by the Contractor within thirty (30) days of the receipt of
the corresponding bills and if not paid by the Contractor within the said period, the
Owner may then deduct the amount, from any money due or becoming due by him to the
Contractor under the Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
31.0 INSURANCE
31.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and
interests of the Owner against all perils detailed herein. The form and the limit of
such insurance as defined herein together with the under-writer in each case shall be
acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
shall not relieve him of any of his contractual responsibilities and obligations.
The insurance covers to be taken by the Contractor shall be in the joint name of the
Owner and the Contractor. The Contractor shall, however, be authorized to deal
directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
31.2 Any loss or damage to the equipment during handling, transportation, storage,
erection, putting into satisfactory operation and all activities to be performed till
the successful completion of commissioning of the equipment shall be to the account
of the Contractor. The Contractor shall be responsible for preference of all claims
and make good the damages or loss by way of repairs and/or replacement of the
equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the Owner with copy of all insurance policies and documents
taken out by him in pursuance of the Contract. Such copies of documents shall be
submitted to the Owner immediately after such insurance coverage. The Contractor
shall also inform the Owner in writing at least sixty (60) days in advance regarding
the expiry/cancellation and/or change in any of such documents and ensure
revalidation, renewal etc., as may be necessary well in time.
31.3 The perils required to be covered under the insurance shall include, but not be
limited to fire and allied risks, miscellaneous accidents (erection risks) workman
compensation risks, loss or damage in transit, theft, pilferage, riot and strikes and
malicious damages, civil commotion, weather conditions, accidents of all kinds, etc.
The scope of such insurance shall be adequate to cover the replacement/reinstatement
cost of the equipment for all risks up to and including delivery of goods and other
costs till the equipment is delivered at Site. The insurance policies to be taken
should be on replacement value basis and/or incorporating escalation clause.
Notwithstanding the extent of insurance cover and the amount of claim available from
the underwriters, the Contractor shall be liable to make good the full
replacement/rectification value of all equipment/materials and to ensure their
availability as per project requirements.
31.4 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the Owner may
from time to time, during the pendency of the Contract, ask the Contractor in writing
to limit the insurance coverage, risks and in such a case, the parties to the
Contract will agree for a mutual settlement, for reduction in Contract price to the
extent of reduced premia amount. The Contractor, while arranging the insurance shall
ensure to obtain all discounts on premia, which may be available for higher volume or
for reason of financing arrangement of the project.
31.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the
additional insurance requirements for the portion of the works to be performed at the
31.6 Special Conditions of Contract details out the various insurance liabilities.
32.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the
plant until the successful completion of commissioning as defined elsewhere in the
Bid document.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
33.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
34.1 In case the Contractor’s performance is delayed due to any act of omission on the
part of the Owner or his authorized agents, then the Contractor shall be given due
extension of time for the completion of the Works, to the extent such omission on the
part of the Owner has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the
Engineer shall be final.
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable
compensation if such delays have resulted in any increase in cost. The Owner shall
examine the justification for such a request for claim and if satisfied, the extent
of compensation shall be mutually agreed depending upon the circumstances at the time
of such an occurrence.
36.0 FORCE MAJEURE
36.1 Force majeure is herein defined as any cause which is beyond the control of the
Contractor or the Owner as the case may be, which they could not foresee or with a
reasonable amount of diligence could not have foreseen and which substantially
affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
epidemics:
b. Acts of any Government, domestic or foreign, including but not limited to war,
declared or undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a
cause notify the other in writing of such causes.
36.2 The Contractor or the Owner shall not be liable for delays in performing his
obligations resulting from any force majeure cause as referred to and/or defined
The date of completion will, subject to hereinafter provided, be extended by a
reasonable time even though such cause may occur after Contractor’s performance of
obligation has been delayed due to other causes.
37.0 SUSPENSION OF WORK
37.1 The Owner reserves the right to suspend and reinstate execution of the whole or any
part of the Works without invalidating the provisions of the Contract. Orders for
suspension or reinstatement of the Works will be issued by the Engineer to the
Contractor in writing. The time for completion of the works will be extended for a
period equal to duration of the suspension.
37.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such
suspension of the works will be paid by the Owner, provided such costs are
substantiated to the satisfaction of the Engineer. The Owner shall not be
responsible for any liabilities if suspension or delay is due to some default on the
part of the Contractor or his Sub-Contractor.
38.0 CONTRACTOR`S DEFAULT
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
38.1 If the Contractor shall neglect to execute the works with due diligence and
expedition or shall refuse or neglect to comply with any reasonable order given to
him, in writing by the Engineer in connection with the works or shall contravene the
provisions of the Contract, the Owner may give notice in writing to the Contractor to
make good the failure, neglect or contravention complained of. Should the Contractor
fail to comply with the notice within thirty (30) days from the date of serving the
notice, then and in such case the Owner shall be at liberty to employ other workmen
and forthwith execute such part of the works as the Contractor may have neglected to
do or if the Owner shall think fit, without prejudice to any other right he may have
under the Contract to take the work wholly or in part out of the Contractor’s hands
and re-contract with any other person or persons to complete the works or any part
thereof and in that event the Owner shall have free use of all Contractor’s
equipment that may have been at the time on the Site in connection with the works
without being responsible to the Contractor for fair wear and tear thereof and to the
exclusion of any right of the Contractor over the same, and the Owner shall be
entitled to retain and apply any balance which may otherwise be due on the Contract
by him to the Contractor, or such part thereof as may be necessary, to the payment of
the cost of executing the said part of the Works or of completing the Works as the
case may be. If the cost of completing of works or executing part thereof as
aforesaid shall exceed the balance due to the Contractor shall pay such excess. Such
payment of excess amount shall be independent of the liquidated damages for delay
which the Contractor shall have to pay if the completion of works is delayed.
38.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor
of his liability to pay liquidated damages for delay in completion of Works as
defined in Clause 14.0 of this Section.
38.3 Such action by the Owner as aforesaid the termination of the Contract under this
clause shall not entitle the Contractor to reduce the value of the Contract
Performance Guarantee nor the time thereof. The Contract Performance Guarantee shall
be valid for the full value and for the full period of the Contract including
guarantee period.
39.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
39.1 The Owner reserves the right to terminate the Contract either in part or in full due
to reasons other than those mentioned under clause entitled ‘Contractor’s Default’.
The Owner shall in such an event give fifteen (15) days’ notice in writing to the
Contractor of his decision to do so.
39.2 The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain
cancellation of all orders and Contracts to the extent they are related to the work
terminated and terms satisfactory to the Owner, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist Owner in maintenance,
protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation,
equitable and reasonable, dictated by the circumstances prevalent at the time of
termination.
39.3 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the
partners dies then unless the Owner is satisfied that the legal representatives of
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
the individual Contractor or of the proprietor of the propriety concern and in the
case of partnership, the surviving partners, are capable of carrying out and
completing the Contract the Owner shall be entitled to cancel the Contract as to its
incompleted part without being in any way liable to payment of any compensation to
the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of
the Owner that the legal representatives of the deceased Contractor or surviving
partners of the Contractor’s firm cannot carry out and complete the Contract shall be
final and binding on the parties. In the event of such cancellation the Owner shall
not hold the estate of the deceased Contractor and/or the surviving partners of the
estate of the deceased Contractor and/or the surviving partners of the Contractor’s
firm liable to damages for not completing the Contract.
40.0 FRUSTRATION OF CONTRACT
40.1 In the event of frustration of the Contract because of supervening impossibility in
terms of Section 56 of the Indian Contract Act, parties shall be absolved of their
responsibility to perform the balance portion of the Contract, subject to provisions
contained in sub-clause 45.3 below.
40.2 In the event of non-availability or suspension of funds for any reasons, whatsoever
(except for reason of willful or flagrant breach by the Owner) and/or Contractor then
the works under the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for
financing to the Contractor in accordance with the terms of the Contract within three
months of the event, the parties hereto shall be relieved from carrying out further
obligations under the Contract treating it as frustration of the Contract.
40.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually
discuss to arrive at reasonable settlement on all issues including amounts due to
either party for the work already done on quantum merit_ basis, which shall be
determined by mutual agreement between the parties.
41.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf
of the Contractor or his partner(s), agent(s), officer(s), director(s), employee(s)
or servant(s) or any one on his or their behalf in relation to the obtaining or to
the execution of this or any other Contract with the Owner, shall in addition to any
criminal liability which it may incur, subject the Contractor to the cancellation of
this and all other Contracts and also to payment of any loss or damage to the Owner
resulting from any cancellation. The Owner shall then be entitled to deduct the
amount so payable from any money otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
42.0 SETTLEMENT OF DISPUTES
42.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract
shall, to the extent possible, be settled amicably between the parties.
42.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner
and the Contractor, arising out of the Contract for the performance of the Works
whether during the progress of the Works or after its completion or whether before or
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
after the termination, abandonment or breach of the Contract, it shall, in the first
place, be referred to and settled by the Engineer, who, within a period of thirty
(30) days after being requested by either party to do so, shall give written notice
of his decision to the Owner and the Contractor.
42.3 Save as hereinafter provided, such decision in respect of every matters so referred
shall be final and binding upon the parties until the completion of the Works and
shall forthwith be given effect to by the Contractor who shall proceed with the Works
with all due diligence, whether he or the Owner requires arbitration as hereinafter
provided or not.
42.4 If after the Engineer has given written notice of his decision to the parties, no
claim to arbitration has been communicated to him by either party within thirty (30)
days from the receipt of such notice, the said decision shall become final and
binding on the parties.
42.5 In the event of the Engineer failing to notify his decision as aforesaid within
thirty (30) days after being requested as aforesaid, or in the event of either the
Owner or the Contractor being dissatisfied with any such decision, or within thirty
(30) days after the expiry of the first mentioned period of thirty days, as the case
may be, either party may require that the matters in dispute be referred to
arbitration as hereinafter provided.
43.0 ARBITRATION
43.1 All disputes or differences in respect of which the decision, if any, of the Engineer
has not become final or binding as aforesaid shall be settled by arbitration in the
manner hereinafter provided.
43.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by
the Contractor and the Owner and the third to be appointed as an umpire by both the
arbitrators in accordance with the Indian Arbitration Act. If either of the parties
fails to appoint its arbitrator within sixty (60) days after receipt of a notice from
the other party invoking the Arbitration clause, the arbitrator appointed by the
party invoking the arbitration clause shall become the sole arbitrator to conduct the
arbitration.
43.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian
Arbitration Act, 1940 or any statutory modification thereof. The venue of
arbitration shall be Bharuch.
43.2 The decision of the majority of the arbitrators shall be final and binding upon the
The arbitrators may, from time to time with the consent of all the parties enlarge
the time for making the award. In the event of any of the aforesaid arbitrators
dying, neglecting, resigning or being unable to act for any reason, it will be lawful
for the party concerned to nominate another arbitrator in place of the outgoing
arbitrator.
43.3 The arbitrator shall have full powers to review and/or revise any decision, opinion,
direction, certification or valuation of the Engineer in accordance with the
Contract, and neither party shall be limited in the proceedings before such
arbitrators to the evidence or arguments put before the Engineer for the purpose of
obtaining the said decision.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
43.4 No decision given by the Engineer in accordance with the foregoing provisions shall
disqualify him as being called as a witness or giving evidence before the arbitrators
on any matter whatsoever relevant to the dispute or difference referred to the
arbitrators as aforesaid.
43.5 During settlement of disputes and arbitration proceedings, both parties shall be
obliged to carry out their respective obligations under the Contract.
44.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every month, a statement covering payments
claimed and the payments received vis-a-vis the works executed, for reconciliation of
accounts with the Owner. The Contractor shall also prepare and submit a detailed
account of Owner Issue materials received and utilized by him for reconciliation
purpose in a format to be discussed & finalized with the Owner before the award of
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
ERECTION CONDITIONS OF CONTRACT
1.0 GENERAL
1.1 The following shall supplement the conditions already contained in other parts of
these specifications & document and shall govern the portion of the work of this
Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as
his representative at Site suitably designated for the purpose of overall
responsibility and coordination of the works to be performed at Site. Such person
shall function from the Site office of the Contractor during the pendency of
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities
during the performance of his field activities. He shall also comply with the Minimum
Wages Act, 1948 and the Payment of Wages Act (both of the Government of India) and
the rules made thereunder in respect of any employee or workman employed or engaged
by him or his Sub-Contractor. He shall abide by labour laws and others as specified
in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work
pursuant to this Contract shall be to the account of the Contractor. Should any such
inspection or registration need to be re-arranged due to the fault of the Contractor
or his Sub Contractor, the additional fees to such inspection and/or registration
also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of
erection, testing and commissioning of the equipment to be supplied & erected under
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
the Contract. The Owner shall continue to hold the lien on all such equipment
throughout the period of Contract. No material brought to the Site shall be removed
from the Site by the Contractor and/or his Sub-Contractors without the prior written
approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by
the Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out
at such time as the Owner may approve and the Owner shall give the Contractor
reasonable facilities for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly
appointed representative, Sub- Contractor and workmen, shall be allowed to do work on
the Site, except by the special permission, in writing of the Engineer or his
representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the
purpose of the Contract. Any written order or instruction of the Engineer or his duly
authorized representative, shall be communicated to the said authorized resident
representative of the Contractor and the representative shall be available at a
stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner,
who may be performing other works on behalf of the Owner and the workmen who may be
employed by the Owner and doing work in the vicinity of the Works under the Contract.
The Contractor shall also so arrange to perform his work as to minimize, to the
maximum extent possible, interference with the work of other Contractors and their
workmen. Any injury or damage that may be sustained by the employees of the other
Contractors and the Owner, due to the Contractor’s work shall promptly be made good
at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in
respect of his employees and workmen at Site. The Engineer shall be at liberty to
object to the presence of any representative or employee of the Contractor at the
Site, if in the opinion of the Engineer such employee has misconduct himself or is
incompetent or negligent or otherwise undesirable and then the Contractor shall
remove such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field
activity plans and schedules for carrying-out each part of the works. Any review of
such plan or schedule or method of work by the Engineer shall not relieve the
Contractor of any of his responsibilities towards the field activities. Such reviews
shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
will be entertained because of the failure or inefficiency of any such plan or
schedule or method of work reviewed. The Contractor shall be solely responsible for
the safety, adequacy and efficiency of plant and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-
site including the safety of all persons employed by him or his Sub–Contractor and
all the properties under his custody during the performance of the work. This
requirement shall apply continuously till the completion of the Contract and shall
not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress
including if any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection
activities shall highlight comparison to the schedules. The report shall also
indicate the reasons for the variance between the scheduled and actual progress and
the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man
hours schedule for the month, detailing the man hours scheduled for the month, skill-
wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is
finally taken over by the Engineer. No claim will be entertained by the Owner or by
the Engineer for any damage or loss to the Contractor’s works and the Contractor
shall be responsible for complete restoration of the damaged works to original
conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled
employees with experience of his particular work. No person below the age of
eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site,
lodging, allowances and other payments to the Contractor’s employees shall be the
sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government
agency under any of the provisions of the Minimum Wages Act, Workmen Compensation
Act, Contract Labour Regulation Abolition Act or any other law due to act of omission
of the Contractor, the Owner may make such payment and shall recover the same from
the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space
Land for Contractor’s Store, Workshop etc.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a) The Engineer shall at his discretion and for the duration of execution of the
Contract make available at site, land for Transmission of Contractor’s field office,
workshop, stores, etc. required for execution of the Contract. Any such temporary
Transmission shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the
Engineer. Until and unless the Contractor has handed over the vacant possession of
land allotted to him for the above purpose, the payment of his final bill shall not
13.2 Electricity:
Power supply:
Where power supply is available with the Owner for Transmission purpose the same will
be provided at the job site at one point of the distribution system as may be decided
by Engineer. Electricity furnished will be 440 volts, 3 phase, 50 cycles and
volts, 1 phase, 50 cycles. Each Contractor shall provide and install all necessary
transformers, switchgears, wiring fixtures, bulbs and other temporary equipment for
further distribution and utilization of energy for power and lighting and shall
remove the same on completion of the work. Should, however, electricity be used in
the Contractor’s labour/staff colony, the power so consumed shall be charged at the
prevailing tariff rate of the GUVNL as prevalent for that area at the time of award
of work; the supply may be withdrawn if the power is used for purposes other than for
the work of the project and the Contractor shall not be entitled to any claim
whatsoever on account of any such action taken by the Engineer. For this purpose,
contractor shall have to apply to DISCOM for separate temporary connection on his
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the Transmission equipments; tools, tackles and
scaffoldings required for pre-assembly, erection, testing and commissioning of the
equipment covered under the Contract. He shall submit a list of all such materials to
the Engineer before the commencement of work at Site. These tools and tackles shall
not be removed from the Site without the written permission of the Engineer.
14.2 First-aid
14.3 The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of Contractor’s
personnel shall be trained in administering first-aid.
14.4 Cleanliness
14.4.1 The Contractor shall be responsible for keeping the entire area allotted to him
clean and free from rubbish, debris etc. during the period of Contract. The
Contractor shall employ enough number of personnel to keep the work area clean.
Materials and stores shall be so arranged to permit easy cleaning of the area. In
areas where equipment might drip oil and cause damage to the floor surface, a
suitable protective cover of a flame resistant, oil proof sheet shall be provided to
protect the floor from such damage.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer
at site at suitable points. These points shall be used as datum for the works under
the Contract. The Contractor shall inform the Engineer well in advance of the times
and places at which he wishes to do work in the area allotted to him so that suitable
datum points may be established and checked by the Engineer to enable the Contractor
to proceed with his works. Any work done without being properly located may be
removed and/or dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which
minimize fire hazards to the extent practicable. Combustible materials, combustible
waste and rubbish shall be collected and removed from the Site at least once each
day. Fuels, oils and volatile or inflammable materials shall be stored away from the
Transmission and equipment and materials storage areas.
trained for firefighting. Enough of such trained personnel must be available at the
Site during the entire period of the Contract.
17.0 SECURITY
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor
shall make suitable security arrangements ensure the protection of all materials,
equipment and works from theft, fire, pilferage and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the
Contractor shall be carried out in presence of contractor and is deemed considered as
part of the work completion. If it is anticipated that the above test may prolong for
a long time, the Contractor’s workmen required for the above test shall always be
present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly
received, unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the
Engineer immediately of any damages, storage, discrepancy etc, for the purpose of
Engineer’s information only. The Contractor shall submit to the Engineer every week a
report detailing all the receipts during the week. However, the Contractor shall be
solely responsible for any shortages or damages in transit, handling and / or in
storage and erection of the equipment at Site. Any demurrage, wharf age and other
such charges claimed by the transporters, railways etc, shall be to the account of
the Contractor. For shortages of any materials issued by the GETCO for the work,
recovery shall be made from you, on the basis of prices of the materials (prevailing
on the date of settlement of materials account) plus 15% supervision charges plus GST
as applicable.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the
list of all equipment materials received by him for the purpose of erection and keep
such record open for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The
equipment stored shall be properly protected to prevent damage either to the
equipment or to the floor where they are stored. The equipment from the store shall
be moved to the actual location at the appropriate time so as to avoid damage of such
equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly
dried by heating before they are installed and energized. Motor bearings, slip ring,
commutators and other exposed parts shall be protected against moisture ingress and
corrosion during storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for
insulation resistance at least once in three months from the date of receipt till the
date of commissioning and a record of such measured insulation values maintained by
the Contractor. Such records shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be
thoroughly protected and stored in a suitable manner to prevent damage or
deterioration in quality by storage.
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those
earmarked for him, the Engineer will have the right to get it moved to the area
earmarked for the Contractor at the Contractor’s cost.
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to
store all equipment, which require indoor storage. Normally, all the electrical
equipment such as motors, control gears, generators, exciters and consumables like
electrodes, lubricants etc. shall be stored in the closed storage space. The
Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the
Contractor shall strictly comply with.
20.0 TRANSMISSION MANAGEMENT
20.1 The field activities of the Contractors working at Site, will be coordinated by the
Engineer and the Engineer’s decision shall be final in resolving any disputes or
conflicts between the Contractor and other Contractors and the tradesmen of the Owner
regarding scheduling and coordination of work. Such decision by the Engineer shall
not be a cause for extra compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and
place to be designated by the Engineer. The Contractor shall attend such meetings
and take notes of discussions during the meeting and the decision of the Engineer and
shall strictly adhere to those decisions in performing his works. In addition to the
above weekly meeting, the Engineer may call for other meetings either with individual
if called, will also attend such meetings.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
20.3 Time is the essence of the Contract and the Contractor shall be responsible for
performance of his works in accordance with the specified Transmission schedule. If
at any time, the Contractor is falling behind the schedule, he shall take necessary
action to make good for such delays by increasing his work force or by working
overtime or otherwise accelerate the progress of the work to comply with the schedule
and shall communicate such actions in writing to the Engineer, satisfying that his
action will compensate for the delay. The Contractor shall not be allowed any extra
compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional labour
and/or materials or supply or any other services to the Contractor except for the
coordination work between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and
other Contract Documents and any other supplementary data complete with all the
latest revisions thereto. The Contractor shall also maintain in addition the
continuous record of all changes to the above Contract Documents, drawings,
specifications, and supplementary data, etc. effected at the field and on completion
of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the
equipment furnished and erected under the Contract. Such drawings and Engineering
data shall be submitted to the Engineer in required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials,
including Transmission equipment, tools and tackles for the purpose of the works
under intimation to the Engineer. All such goods shall, from the time of their being
brought vest in the Owner, but may be used for the purpose of the works only and
shall not on any account be removed or taken away by the Contractor without the
written permission of the Engineer. The Contractor shall nevertheless be solely
liable and responsible for any loss or destruction thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time
be due or owing to him by the Contractor, under, in respect of or by reasons of the
Contract. After giving a fifteen (15) days’ notice in writing of his intention to do
so, the Owner shall be at liberty to sell and dispose off any such goods, in such
manner as he shall think fit and to apply the proceeds in or towards the satisfaction
of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under
the direction of the Engineer the materials such as Transmission equipment, erection
tools and tackles, scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He
shall also be responsible for protection of all persons including members of public
and employees of the Owner and the employees of other Contractors and Sub-Contractors
and all public and private property.
24 INSURANCE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in
General Terms and Conditions of Contract of this Volume-I, the following provisions
will also apply to the portion of works to be done beyond the Contractor’s own or his
Sub-Contractor’s manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover
the Contractor against claims for injury, disability, disease or death of his or his
Sub-Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries,
disabilities, disease or death of members of public or damage to property of others,
due to any act of omission on the part of the Contractor, his agents, his employees,
his representatives and Sub-Contractors or from riots, strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the
Contractor, his Sub-Contractors, his agents and his employees have to perform work
pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it
will be the responsibility of the Contractors to maintain all necessary insurance
coverage to the extent both in time and amount to take care of all his liabilities
either direct or indirect, in pursuance of the Contract.
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be
performed without subjecting the equipment and materials to adverse effects during
inclement weather conditions, like monsoon, storms etc. and during other unfavorable
Transmission conditions. No field activities shall be performed by the Contractor
under conditions, which might adversely affect the quality and efficiency thereof,
unless special precautions or measures are taken by the Contractor in a proper and
satisfactory manner in the performance of such Works and with the concurrence of the
Engineer. Such unfavorable Transmission conditions will in no way relieve the
Contractor of his responsibility to perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils,
etc. which he may come across during the course of performance of his Works either
during excavation or elsewhere, are properly protected and handed over to the
Engineer. Similarly, the Contractor shall ensure that the bench marks, reference
points, etc which are marked either with the help of Engineer or by the Engineer
shall not be disturbed in any way during the performance of his Works. If any work
is to be performed which disturbs such reference the same shall be done only after
these are transferred to other suitable locations under the direction of the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Engineer. The Contractor shall provide all necessary materials and assistance for
such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to GETCO or to others, working at the Site. The
Contractor shall also be responsible for provision of all safety notices and safety
equipment required both by the relevant legislations and the Engineer, as he may deem
necessary.
27.4 All equipment used in Transmission and erection by Contractor shall meet
Indian/International Standards and where such standards do not exist, the Contractor
shall ensure these to be absolutely safe. All equipment shall be strictly operated
and maintained by the Contractor in accordance with manufacturer’s Operation Manual
and safety instructions and as per Guidelines/rules of GETCO in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles
shall be carried-out in accordance with the relevant provisions of Factories Act
1948, Indian Electricity Act 1910 and associated Laws/Rules in force from time to
time. A register of such examinations and tests shall be properly maintained by the
Contractor and will be promptly produced as and when desired by the Engineer or by
the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at
the Site including safe means of access, railings, stairs, ladders, scaffoldings etc.
The scaffoldings shall be erected under the control and supervision of an experienced
and competent person. For erection, good and standard quality of material only shall
be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other
electrical equipment belonging to the Owner or other Contractors under any
circumstances, whatsoever, unless expressly permitted in writing by GETCO to handle
such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket
belonging to the other Contractor or Owner, he shall:
(a). Satisfy the Engineer that the appliance is in good working condition;
(b) Inform the Engineer of the maximum current rating, voltage and phases of the
appliances:
(c) Obtain permission of the Engineer detailing the sockets to which the appliances
may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of
which shall be an earthed metal sheath surrounding the cores.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior
permission. No weight of any description will be imposed on any cable and no ladder
or similar equipment will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the Engineer and a permit to work shall be issued by the Engineer
before any repair work is carried out by the Contractor. While working on electric
lines/equipment, whether live or dead, suitable type and sufficient quantity of tools
will have to he provided by the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the Transmission/ erection or other associated
activities undertaken by the Contractor thereby causing any minor or major or fatal
injury to his employees due to any reason, whatsoever, it shall be the responsibility
of the Contractor to promptly inform the same to the Engineer in prescribed form and
also to all the authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his
opinion the work is being carried out in such a way that it may cause accidents and
endanger the safety of the persons and/or property, and/or equipment. In such cases,
the Contractor shall be informed in writing about the nature of hazards and possible
injury/accident and he shall comply to remove shortcomings promptly. The Contractor
after stopping the specific work can, if felt necessary, appeal against the order of
stoppage of work to the Engineer within 3 days of such stoppage of work and decision
of the Engineer in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of
work due to safety reasons as provided in para 27.15 above and the period of such
stoppage of work will not be taken as an extension of time for completion of work and
will not be the ground for waiver of levy of liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works,
requirements of Safety Rules which would generally include but not limited to
following:-
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without
proper introduction as to the hazards incident thereto, both to himself and his
fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at
crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced
divers, use of gum boots for working in slushy or in inundated conditions are
essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant
provisions of applicable laws pertaining to the safety of workmen, employees, plant
and equipment as may be prescribed from time to time without any demur, protest or
contest or reservations. In case of any discrepancy between statutory requirement and
GETCO Safety Rules referred above, the latter shall be binding on the Contractor
unless the statutory provisions are more stringent.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a. Fatal injury or accident: Rs 1, 00,000/-These are applicable Causing death
per person plus GST for death
b. Major injuries or accident causing :Rs. 20,000/-Injury to any person.
25% or more permanent disablement per person plus GST,
whosoever to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation
Act. The compensation mentioned above shall be in addition to the compensation
payable to the workmen/employees under the relevant provisions of the Workmen’s
Compensation Act and rules framed there under or any other applicable laws as
applicable from time to time. In case the Owner is made to pay such compensation then
the Contractor is liable to reimburse the Owner such amount in addition to the
compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of
the equipment shall be in accordance with the relevant Codes and accepted good
engineering practice, the Engineer’s drawings and other applicable Indian recognized
codes and laws and regulation of the Government of India.
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and
conditions particular to the Contract. The provisions herein are to be read and
understood in conjunction with the relevant provisions elsewhere in the Instructions
to Bidders (ITB), the General Conditions of Contract (GCC) and Erection Conditions of
Contract (ECC). The intent of provisions herein are specific to this contract and
are, in general, supplementary to related provisions under ITB, GCC and ECC. However,
in certain provisions which are contrary to those in ITB, GCC and ECC, the provisions
in these Special Conditions of Contract will prevail.
2.0 Tender Fee:
The tender fee specified in notice inviting tender is payable by RTGS/NEFT.
3.0 Earnest Money Deposit (EMD):
3.1 (a) If the EMD amount is more than Rs.3 Lakhs, it should be paid either by RTGS/
NEFT/Online or Demand Draft or Banker’s Cheque or Pay Order or Bank Guarantee.
Otherwise it should be paid either in Cash (up to Rs. 10,000/- only) at the
office address specified in the tender document or by RTGS/ NEFT/online.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the
same will make the Bid invalid.
5.0 Qualifying Criteria:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
5.1 TECHNICAL CRITERIA:
Experience as per qualifying requirement.
5.2 FINANCIAL CRITERIA:
The financial turnover of bidder (Financial year) shall not be less than Rs.
lacs during last 3 (three) Financial years.
Registration of appropriate class with GETCO and validity of the registration should be
furnished along with the technical bid. Latest Bank solvency certificate of 20% of the
tender value is required to be furnished by the tenderer along with the technical bid.
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and
ECC, the following documents/details are to be furnished by the Bidder:
1. GST Registration No. Date/ issuing authority.
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for various utilities
4. Last three years Audited Accounts/IT returns
5. Electrical contractor’s license with latest validation.
6. PF registration along with proof of challan etc.
7. Solvency certificate from Bank (up to 20 % of Bid value).
7.0 Price Inclusions (including Taxes & Duties):
7.1 The prices quoted shall be all inclusive of freight, octroi, transportation, loading,
unloading & stacking at site of equipment materials received from Transmission store
GETCO Bharuch after observing all store formalities of GETCO.
7.2 No extra payment toward any type of templates and erection tools /materials will be
7.3 GOOD & SERVICE TAX (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be
paid extra on a given taxable goods and/or services within the original contractual
delivery period. The amount and% of GST and Cess as applicable should clearly be
indicated separately. (GST/Cess means all applicable Tax/Cess under GST Laws. GST
Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST
Act, UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate duly authorized Signatory of successful
bidder, certifying that you have not claimed Refund of any applicable GST and Cess,
charged to COMPANY or shall not claim any such Refund, on a future date, from the
concerned Authorities and if, any Refund, in respect of such GST and Cess, is claimed
by you, it will be immediately passed on to the COMPANY, without COMPANY making any
specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the
rate of GST and Cess is not mentioned clearly unless the bidder has opted for
Composition Scheme under GST Act, which should be clearly indicated in the price bid.
COMPANY may at its discretion consider such offer with presumption of highest
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the
event of withdrawal/cessation of the Supplier from Composition scheme during the
tenure of the contract, the rate mentioned in the price bid shall be final and any
additional GST will have to be borne by the tenderer. In no case additional amount
towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor
has opted for Composition Scheme under GST.
i. Contractor has to submit the GST Registration certificate.
ii. Contractor has to submit invoice/Challan as documentary proof with each RA bill &
Final Bill and in which it shall be specifically mention the nature of service &code
SAC code under which the amount of service tax GST payable by contractor and payable
by GETCO (if any) without fail.
iii. GETCO will withheld the GST amount of contractor and it shall be reimbursed on
production of documents evidences of payment made by contractor
iv. The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of taxable service provided
The total GST payable thereon with bifurcation of GST payable by service
provider and service receiver.
Rate and amount of taxes i.e. CGST/ SGST/ IGST/UGST
Place of supply along with the name of State, in case of a supply in the
of inter-State trade or commerce i.e. Out of Gujarat Supply
Applicable SAC Code
Contractor has to also supply tax invoice as described under GST rules and
Regulation indicating GSTIN
v. Contractor has to provide Tax invoice in a standard format as per CGST act, CGST
rules 2017 and GST invoicing rules containing all details as provided in Act and
rules. Contractor / Supplier has to mention GST no. of GETCO i.e. 24AABCG4029R2ZC in
the invoice invariably & failure of which payment will not be made.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to /
mentioned in acceptance of tender only and any deviation in the same shall not be
accepted. Further, any additional liability of GST (later on due to wrong mentioning
of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in
the invoice shall be borne by the Supplier/Contractor. However, any refund received
by the supplier / contractor on account of GST charged from the company; such refund
shall have to be passed on to the company, along with interest if any. Such refund
along with interest needs to be passed on suo-moto by the supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal
interest at the rate of 15% per annum if GST charged is not paid / short paid to the
government or fail to upload the details or uploads inaccurate particulars on GSTIN
portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the
contract, the provision of GUVNL’s statutory variation clause shall apply.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then
COMPANY will have the option to take the prices as exclusive of taxes and duties at
maximum higher slab rates for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder
intends to supply the goods /services, meaning thereby the bidder has to supply the
goods / services from the relevant declared / registered place of
supply only
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due
to inclusion of any other additional item of their inputs / input services under the
ambit of the Input Tax Credit provisions under the GST Act, subsequent to the date of
submission of the offer, the same should be passed on to COMPANY and you should
inform such changes to COMPANY from time to time.
TDS UNDER GST:
Tax deduction at Source (TDS) under GST at the prevailing rate will be deducted from
bills in accordance with the provision of Section 51 of the CGST Act, 2017 and to
that effect a certificate will be issued to the party.
Goods and Service Tax Compliances (GST):
The GST at the applicable rates will be levied on the total of Schedule-B. GST on
the work executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its
rules, regulations and notifications, circulars issued and in force time to time
by Government and M/s. GETCO. Contractors are required to clarify the product and
services related HSN codes and SAC codes respectively.
GETCO reserve right of re-classify, in case of mis-classification of goods and/or
service (HSN/SAC codes) Sec. 171 of CGST/SGST Act contains provisions related to
anti-profiteering. On the basis of same on introduction of GST, the Vendor should
pass on the tax benefit/savings, if any, on account of tax credits or lowering of
tax rates to us by way of adjustment in the contract price. Non-compliance of the
same may lead to levy of penalty by Government.
Contractor required to submit the invoice as per the standard formats/contents of
GST laws including invoice ruling. GST will be reimbursed subject to proper/
valid matching of transactions/invoices on GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and
amendments, which may publish subsequently for compliance by field offices with
respect to GST Laws.
7.4 Statutory Variations:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Any statutory increase or decrease in the taxes and duties including GST and Cess as
applicable or in the event of introduction of new tax/cess or cessation of existing
tax/cess subsequent to suppliers offer if it takes place within the original
contractual delivery date will be to COMPANY’s account subject to the claim being
supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the
advantage will have to be passed on to COMPANY. Statutory Variation clause will not
be applicable in case of Supplier / Contractor has opted for Composition Scheme under
7.5 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance
with the provision of Income-Tax Laws and to that effect a certificate will be issued
to the contractor.
7.6 Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and
erection items for supply, erection, testing & commissioning of substation,
transmission lines, EPC/Turnkey projects and civil works.
Contractor shall get registered under Welfare Cess Act before commencement of work.
Office of the Factory Inspector is authorized at present as a registering authority.
The welfare cess@1% is considered in the price schedules so, the bidders are requested
to quote accordingly.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO,
then contractors shall deposit welfare cess on estimated cost of supplied items to
GETCO on progressive basis of utilization. As this part of welfare cess is on GETCO
account, the same shall be reimbursed to the contractor on receipt of request letter
along with documentary evidence of payment. For calculation of welfare cess on supply
part, valuation as per MR shall be taken and informed to the contractor for payment.
This will be over and above the A/T value.
In case of EPC contracts covering supply, erection, testing & commissioning, the
supply portion shall also be considered for calculation of welfare cess.
If GETCO purchases material on its own without any reference to the estimate contract
and gives/hand over the material to the contractor for erection, testing &
commissioning, then welfare cess on procurement cost of the equipment of material
shall also be applicable. Procedure same as narrated above.
Periodically, the evidence regarding filing of return and maintaining record as per
the Act by the contractor shall be verified by GETCO.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare
Cess Act and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the
documentary evidence of registration. Only thereafter, the bill will be processed for
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill, the contractor has to submit documentary
evidence of payment of welfare cess of previous R.A.Bill as well as of this final
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
If the R.A.Bill happens to be first and final bill, then before release of payment,
contractor has to submit documentary evidence of registration under Welfare Cess Act
and evidence of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of LOI.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the
value of the order as a Security Deposit for satisfactory execution of the contract.
Such Security Deposit will be payable either in DD payable at Bharuch /Bank
guarantees from following Banks will be acceptable.
8.3 If the Contractor defaults in execution of the orders placed or if COMPANY suffers
any financial loss due to this, then COMPANY will be forfeited Security Deposit, EMD
plus GST as applicable from other orders of the same firm or by encasing the Bank
(A) Guarantees issued by the following Banks will be accepted as SD/EMD on permanent
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to
March- 31, 2027 or the issuance of new Government Resolution on the same subject
whichever is earlier. The validity cut-off date in GR is with respect to date of
issue of Bank Guarantee irrespective of date of termination of Bank Guarantee.
No. Bank Name No. Bank Name
1 AXIS Bank 22 RBL Bank
2 AU Small Finance Bank 23 South Indian Bank
3 Bandhan Bank 24 Sandarad Chartered Bank
4 City Union Bank 25 Tamilnad Mercantile Bank
5 CSB Bank 26 Ujjivan Small Finance Bank
6 DBS Bank India Limited 27 YES Bank
7 DCB Bank 28 Ahmedabad Mercantile Co-Op Bank
8 Dhanlaxmi Bank 29 Nutan Nagrik Sahkari Bank Ltd.
9 Equitas Small| Finance Bank 30 Rajkot Nagrik Sahkari Bank Ltd
10 FEDERAL Bank 31 Saraswat Co-Operative Bank Ltd
11 HDFC Bank 32 SBPP Co-Operative Bank Ltd.
12 HSBC Bank 33 SVC Co- Operative Bank Ltd
13 ICICI Bank 34 The Cosmo Co-Op Bank Ltd
14 IDBI Bank 35 The Gujarat State Co- Operative Bank
15 IDFC First Bank 36 The Surat District Co-Operative Bank Ltd
16 Induslnd Bank 37 The Surat People's Co-Op. Bank Ltd
17 Jammu and Kashmir Bank 38 The Baroda Central Co- Operative Bank
18 Jana Small Finance bank 39 The Panchmahal District Co-Operative Bank
19 Karnataka Bank 40 The kalupur Commercial Co-Op. Bank
20 Karur Vysya Bank 41 The Rajkot Coommercial Co- Operative Bank
21 Kotak Mahindra Bank 42 The Banaskanthe Mercanttile Co-Op. Bank
43 Gujarat Gramin Bank
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
8.4 No interest will be allowed on amount of Security deposit.
8.5 The Security Deposit- total shall be kept deposited up to completion of work
finalization of final bill. The same shall be return on receipt of N.O.C. by the
concerned DE after observing GETCO’s procedure.
8.6 This security deposit is for the performance of contract and the same is liable to be
forfeited by the GETCO in event of non-fulfillment of the term and conditions of this
contract by the contractor.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘ and ‘ Contract Agreements’ will be done as per prevalent
GETCO Terms and Conditions.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in
poor workmanship etc. for a period of one year from the date of commissioning.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work
should be strictly observed. Any delay that may take place in supply and erection
beyond Contractual cutoff date stated as per stipulated delivery period shall be
subject to the penalty at the rate of ½ % of the contract value per week plus GST of
delayed work or part thereof, with a ceiling of 10 % of the total contract value plus
10.2 The penalty will be deducted from bills payable either against this contract or from
any Bank Guarantee or any other amount payable under any other contract with the
10.3 If the contractor fails to complete the job in stipulated time period/leaves the site
with incomplete work, GETCO will get the remaining work executed at the risk & cost
of contractor.
11.0 COMPLETION PERIOD
11.1 Overall period for this Contract will be 180 days from the date of commencement as
line length is between 0 to 5 kM.
11.2 No mobilization period, idling or stoppage period will be allowed during this period
of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract
are demonstrated to be complete to the satisfaction of the GETCO/Engineer and is
complete in all respects as per the terms and conditions of this Contract.
12.0 Presentation of Bills for s/s work
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed
including cost of material consumed is to be prepared in triplicate and submitted to
Site Engineers in-charge of the work, for necessary payment. These bills shall be
serially numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and
passing of final bill. The contractor has to submit the final bill along with the
material consumption statement and other required data of the work carried out within
3 months from the date of completion of work. These bills shall be serially numbered
with suffix SE-I.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
12.3 All the bills in accordance with the above clauses must be submitted with the
following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount
of the respective RA bill shall be withheld and shall only be released at the time of
final bill.
12.A Presentation of Bills for line work
12.A.1 Bills for 90% value of the erection work carried out during each calendar month
as per above Clause shall be submitted in triplicate to Deputy Engineer (Const),
In charge of the works at the end of that particular month, who will in turn
process the same and forward to Executive Engineer (Const), In charge of the
works, for necessary payment. These bills shall be serially numbered with Suffix-
12.A.2 Bills for 10% value of the erection work done as per above clause shall be
submitted to Deputy Engineer (Const), in charge of the works, who will in turn
process them and forward them to Executive Engineer (Const). I/C of the work for
necessary payment. These bills shall be serially numbered with Suffix-E-2.
12.A.3 The Contractor has to submit the final bill along with all required data of works
carried out within 3 months from the date of commissioning of the line. The
concern Dy.Engr /Ex.Engr (Const) must record and process the final bill along
with complete material account. The material account shall include the credit of
dismantled materials.
12.A.4 All the bills (in accordance with above Clauses) must be submitted with following
informations:
a. Item wise work done during billing period i.e., respective month.
b. Item wise cumulative work done.
c. Account for tower materials & bolts-nuts, accessories consumed and balance
d. Account of line materials consumed, wastages and balance stock.
For non-submission OR part submission of above information an additional 5%
amount of the respective RA. Bill will be withheld and released only after
passing of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work
in scope of work order.
13.1 For erection works of s/s.
(i) 90% payment of amount claimed covering various activity such as structure,
equipment erection, earthing installation, control wiring, battery charging
etc. works against R.A. bills duly certified by EIC within 60 days from the
date of R.A. bill.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(ii) Balance 10% of erection value shall be paid against completion of work only
after settlement of material account statement of items used, erected and
successful commissioning of transmission line the same amount will be release
in final bill only and payment will be made only after passing of final bill.
13.A For erection works of line
13.A.1 Payment shall be made as under:
Up to 90% of the total value of the erection work done will be paid against
monthly running account bills to be submitted to the Engineer-in-Charge of the
Construction Division concerned.
Balance 10% payment due will be made at the end of 12 months from the date of
handing over of the line or 18 months after completion of the line to the
satisfaction of the Superintending Engineer (Trans), Bharuch at his absolute
discretion whichever is earlier only after passing of final bill.
13.A.2 The payment of above balance 10% amount due will be made only after a material
account statement of items received and used or returned to stores is settled and
passing of final bill. The contractor must settle final bill within 3 Months from
the completion date. Any discrepancy in the quantities will have to be made good
by the contractor or deduction of its cost as per The GETCO's ledger value or
market value whichever is higher, plus 15% supervision charges will be made while
settling the balance payment. This value of materials shall be prevailing on the
date of submission of the final material account to the GETCO.
13.2 PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link
https://getco.co.in/msme/ (and intimate to concern bill submitting office with
copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date
of as deemed acceptance of goods or services i.e After submission of all required
documents as per at terms & time to time circular issued by GETCO’s corporate
office as well as statutory requirement to process the bill.
*Date of acceptance means-
(a) The day of actual delivery of goods or the rendering services or
(b) Where any objection is made in writing by the buyer regarding acceptance of goods Or
services, the day on which such objection is removed by the supplier.
** Date of deemed acceptance” means-
where no objection is made in writing by the buyer regarding acceptance of goods or
services within fifteen days to the delivery of the goods or the rendering of
services, the day of the actual delivery of goods or the rendering or services.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Transmission store of S/S equipment and
materials and keep in safe custody and transport to the respective sites and will be
fully responsible for any damage to or loss of all materials at any stage during
transportation or erection or taking over of the S/S by GETCO.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
14.2 The Contractor has to open site store and ensure for safe custody of all the stored
materials at his own cost.
14.3 The Contractor shall have total responsibility for the entire materials stored,
loose, semi assembled and/or erected by him at site in his custody. The Contractor
shall make suitable security arrangements at his own cost to ensure the protection
of all materials, equipment and works from theft, fire pilferage and any other
damages and loss. It shall be the responsibility of the contractor to arrange for
security till the works are finally taken over by the GETCO.
14.4 STORAGE-CUM-ERECTION INSURANCE: The contractor shall take suitable storage-cum-
erection insurance cover at his cost to the extent of 100 % cost of S/S materials,
which are required to complete the work. Bidder shall have to take the comprehensive
Marine cum erection (MCE) insurance policy against any loss, damage, theft,
pilferage, fire etc. for the complete period of storage, erection and commissioning
up to the time of taking over of the work by GETCO. However, if the work is not
completed within the stipulated time limit as mentioned into work order, the MCE
shall be extended by the contractor up to the work completion and taking over of the
line or S/S by GETCO. Moreover, the charge for extension of insurance shall be borne
by contractor if the delay is attributed to the contractor. The charge for extension
of insurance shall be reimbursed by GETCO to the contractor on production of proof
for extension of MCE if the delay is attributed on the part of GETCO
The Contractor shall deal directly and pursue the claim with the Insurance Company
and shall be responsible in regard to maintenance of all insurance coverage as well
as for settlement of claim. The proof of insurance policy taken by the successful
Contractor shall be furnished/submitted to Engineer-In-Charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance
policy. The risk shall be covered for lifting of materials from store to final
handing over to GETCO. Further, in absence of the above insurance policy, R.A. Bill
payment will be withheld.
The approximate amount of the material required whose insurance is to be taken to
complete the scope of work is Rs. 119.00 LAKHS (One Hundred Nineteen Lakh)
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be
responsible to lodge, pursue and settle all the claims with the Insurance Company for
all items, materials and the GETCO shall be kept informed about it. Contractor shall
replace the lost / damaged materials / items promptly irrespective of the settlement
of the claims by underwriter and ensure that the work progress is as per agreed
schedule. The loss, if any, such replacement will have to be borne by the Contractor
and GETCO will not entertain any claim / representation in this regard. However, it
will be contractor's responsibility to insure the entire project till the S/S is
taken over by the GETCO.
15.0 LABOUR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female
worker shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next
15.0.2 Contractor shall maintain a valid labour license under the contract Labour
(Regulation and abolition) Act for employing necessary manpower required by him. In
the absence of such license, the contract shall be liable to be terminated without
assigning any reason thereof.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
15.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the
GETCO indemnified in respect thereof. Some of the major liabilities under various
labour and industrial laws which the Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident
Fund, Family Pension Scheme, Deposit Linked Insurance Scheme, Administrative
charges, etc. at the rates made applicable from time to time by the Government
of Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/-
or later prevailing rate with the Office of Commissioner of Labour as per the
Contract Labour (Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition)
Act and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the
rate of one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed
thereto, for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out
of any claim of disputes under the Industrial Disputes Act 1947 or any other
Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labour laws, in force from time to time,
from Statutory Authorities like State Government/ Government o India, which the
Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee. Provident Fund and Family pension Scheme at the rate of 18%
(or at the rate made applicable by the Government from time to time of the wages. The
Contractor’s contribution and his workers contribution towards Provident Fund and
Family Pension Scheme shall be deposited by the Contractor with Regional Provident
Fund Commissioner, Ahmedabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is
a member of the Provident Fund, as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by
the Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates
applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the
Contract Labour, shall be provided by the Contractor to his workers. He shall
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
maintain Leave Records, Leave Cards, for individual labourer, which shall be duly
verified, approved and certified by the authorized Officer of the GETCO.
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and
under the liability insurance. The purchaser shall not be responsible for any
payments of compensation to the workers/supervisor of the contractor for fatal or
non-fatal accidents during the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily
supervision and for maintenance of various registers and records required under the
law and contract. No payment for supervision shall be admissible.
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever, arising out of or in connection with
the matters referred herein above elsewhere and against all actions, proceedings,
claims, demands, costs and expenses which may be made against the GETCO or Government
for or in respect of performance of his obligation under the contract documents. The
GETCO shall not be liable for intervention of authority Government for or in respect
of performance of his obligation under the contract documents. The GETCO shall not be
liable for or in respect of or in consequence of any accident or injury to any
workman or other person in the employment of the Contractor or his Sub-Contractor and
the contractor shall indemnify and keep indemnified the GETCO against all claims,
demands, proceedings, cost, charges and expenses whatsoever in respect thereof or in
relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the
performance of this contract. If any of the work is sublet, the Contractor shall
require the Sub-Contractor to provide workmen’s employer’s liability insurance for
the latter’s employees, such employees shall be covered under the Contractor’s
Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per
rates fixed under the minimum wages act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the
expiry of 7th day of the last day of the month in respect of the wages are
payable (i.e. wages of a month have to be paid by him in the first week of the
next month). Any default will result in cancellation of contract forthwith or
else the contractor shall be punishable to the extent of Rs. 100/- per each
day or as per the prevailing rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so
that, in case of labour trouble etc. the Contractor can be contacted. The
Contractor shall arrange to have his office outside the factory work premises
and the Contractor shall arrange to have his office outside the factory work
premises and the Contractor shall keep himself present throughout the working
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
I) The separate P.F. code issued from P.F. commissioner is required to be taken
by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his
tender will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC,
along with the tender.
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof
within contractual period of delivery or in case the stores are found not in
accordance with prescribed specification and/or the approved sample, the GETCO
shall exercise its discretionary power either:
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account
and at the risk of the contractor for such stores not so delivered or other
similar description without canceling the contract in respect of the consignment
not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion
of the GETCO shall be final. In the event of action taken under clause (A) or (B)
above, the contractor shall be liable to pay for any loss which the GETCO may
sustain on that account, but the contractor shall not be entitled to have any
saving on such purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of
stores supplied by the contractor and the GETCO shall not be required to give any
reason in writing or otherwise at any time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the
bidder has to reduce all the quoted rates proportionately. The reduction on
overall basis will not be accepted (i.e. all unit rates of erection schedule
shall be reduced proportionately by difference in percentage). The confirmation
for matching end cost shall be given within 7 (seven) days from the letter from
16.0 VENDOR REGISTRATION:
REGISTRATION AS A CONTRACTOR:
Registration with GETCO is pre requisite for participating in tender. It is
required to furnish documents of registration along with offer in Technical bid
and the details at appropriate place in confirmation of details of bidder shall
be given by the contractor
17.0 Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for
business dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties
from participating in the tendering process.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor /
Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
blacklisting, is to protect the GUVNL and its subsidiary Companies from
dealing with undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned
for business dealing / blacklist are as Under.
A Firm will be placed in a Stop deal / banned for business dealing /
blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid,
until and unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order
after the same is issued by the Company within the validity period and as per
agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled
1.2.7. Has failed to submit all the necessary tests reports / documents within time
schedule/ as per company’s time limit, as mentioned in the LOI, if the letter
of Acceptance (LOA) is placed subject to submission of type reports /
documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace
with stipulated time frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or
has not returned or has short returned or has unauthorisely disposed of
materials / documents / drawings / tools or plants or equipment supplied by
the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing
and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of
documents, in relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by
the tendering authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of
the Company given to the firm only for its use (in discharge of its
obligation against an order) to any third party without prior consent of the
1.2.15. Any other ground for which in opinion of the company makes it undesirable to
Deal with the Firm, and
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing /
blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that
bidder and / or proprietor / partner / Director of the firm has not been
placed on stop dealing / banned for business dealing / blacklisting by GUVNL
and It’s any subsidiary Companies as per Revised ANNEXURE-14
19. The GETCO reserves the rights of interchanging and dismissing any person employed for
the work if there is complaint against his misbehavior, misconduct or disloyalty
towards job.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
20. Terms and conditions regarding industrial laws and other related matters shall be
complied by the contractor in all respect.
21. The contractor shall ensure that all persons have provided safety tools, shoes, hamlets
etc. as may be required for safety point of view and all his persons shall follow the
instructions issued by the GETCO from time to time in concern with the safety and
security as the work to be carried out.
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information & should place on top of technical bid specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD/Speed post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by the Yes / No
5) a) Whether the Bidder is registered with GETCO Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
Iii) Validity
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
8) GST [IN PERCENTAGE] Yes/ No
Please quote your GST Registration No. & Date.
9) PENALTY TERMS AGREE Yes/ No
10) SECURITY TERMS AGREE Yes/ No
11) PAYMENT TERMS AGREE Yes/ No
12) Completion Period Agreed Yes/ No
13) TELEPHONE NOS. & FAX NO. & e-mail ID
14) AUTHORISED PERSON OF THE FIRM:
15) NAME OF THE PROPRIETOR, PARTNERS, DIRECTORS
[AS THE CASE MAY BE], ALONG WITH ADDRESS, TELEPHONE, FAX NO. etc.
Signature of Authorized Representative of
Company/Agency
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
STATUS:________________
Name of tendering company
PART – II
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
3.1 SCOPE:
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipments and other material from the Board’s stores,
checking them, transporting to site's stores and keeping in safe custody
by contractor.
ii) To take suitable storage-cum-erection insurance of equipments/materials
issued by the Board.
iii) Distribution of all materials to erection site at 66kv Sub Station.
iv) Structure/Equipment erection including fixing of attachments, accessories
and tack-welding of structures.,
v) Stringing of ACSR/AAAC Panther conductor bus with fixing of insulators,
Hardware, dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to
complete the transformer for commissioning.
3.1.3 The Board will supply equipments, structure materials, bolts-nuts, structure
accessories/attachments, insulators, insulator-hard wares, conductor,
accessories, ground wire, ground wire accessories, Control cable etc. required
for erection of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest
Provisions under Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required
during execution of work. The Contractor solely is responsible for any damage and
/ or loss of his erection tools.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.1.6 The Contractor shall be fully responsible for completing all the above works till
the complete transformer is taken over by the Board, and thereafter up till
guarantee period.
3.1.7 The methods of erection are not dealt with in detail but are left to the
Contractor who shall exercise his own judgment with regards to actual handling of
equipments & materials and in deciding upon the best methods to be adopted for all
the erection activities.
3.1.8 The successful bidder shall carryout all the erection works in accordance with
structural drawings, and other erection drawings etc. provided by the Board.
3.2 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The
bidders are presumed to have acquainted themselves with the site before submitting
their offer.
3.2.2 The successful bidder has to collect from concerned field office the detailed
layout drawing along with the following drawings for the substation duly approved
by the Board immediately on receipt of the Order. He shall also arrange visit of
proposed site jointly with Board’s representative for important marks coming across
the scope of works under the contract. Structural drawings of 66 KV Structures
listed at Schedule –B
TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall
fully comply with the relevant Indian Standard. The IE rules and Acts in force
from time to time shall also be applicable during pendancy of the contract.
3.4. ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles, jigs and fixtures, winches,
alignment tools, welding sets, , breaker handling devices, all consumable items
and Transmission equipment as required to install the equipments and to complete
the work in all respects and shall necessarily include (but not limited to )
bolts, nuts, rivets, welding rods, shims, wedges, packing sheets, packing
compounds, oil installation and protection of individual equipment in storage
and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of
and connection of cables, fabrication supply and installation of all support
structures for installation of various electrical equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT
cables) shall also be arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's
instructions
3.4.6 All additional iron framework erected to put the equipment in operational
condition shall be provided with two coats of primer and two topcoats of finish
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.4.7 Special care shall be taken to make the enclosed equipment protected against
entry of rates, lizard, and creeping reptiles, which may create electrical short
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the
following activities have been completed.
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters
instruments etc. as described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.18.0. EARTHING ARRANGEMENTS: (TECHNICAL TERMS & CONDITIONS)
Standard Guidelines & Recommendations for Earthing System for EHV Sub-station
issued vide Circular R & M/3 dtd.5.11.12 & CE(TR) Circular 36 dtd. 23.9.08 to be
The General notes for Earthing system & drawings for earthing the equipments
(including welding joints) are compiled in Drg. No. GETCO/E/STD/P-012 sheet 1 to
24 (available in SOR booklet).
3.19 GENERAL :
3.19.1 The Contractor shall ensure that at the end of each sub-activity the Surplus
materials are immediately removed from the work-site and the surplus excavated
earth is spreader around to avoid loss or injury to the public/equipments.
3.19.2 The Contractor has to return all surplus materials after reconciliation of material
account in good and useable condition. The contractor shall settle the final bill
including signature on all relevant papers required for passing of final bill,
excess/saving statement and time limit extension proposal. If any within three
months from the date of charging/commissioning or taking over by the Board of the
Sub Station.
3.19.3. Most of all equipments should be erected in presence of the concerned engineer from
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
OEM/GETCO engineer.
3.19.4. After complete erection and operation, contractor's supervisor should attend the
site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3.20 Erection:
1. All erection work is to be carried out as per the manual of OEM (Original
equipment manufacturer) and instruction of engineer-in-charge.
2. All equipment erection charges are inclusive of shifting dragging handling of
the respective equipment up to S/s erection site from its S/s site store.
3. Contractor has to ensure safe shifting dragging erection of all equipments to
comply with labour laws I.E. rules etc.
4. All erection charges are inclusive of fixing of clamp connectors, all necessary
accessories to the respective equipment.
5. Transformer erection charges cover shifting dragging, handling etc. for its
bushings radiators conservator tank and allied accessories.
6. All erection work includes erection insurance to be arranged by the contractor
at his cost.
7. All the required tools and tackles like conductor, earth wire compression,
jointing machine, cutting machine, welding set etc, are to be arranged by the
contractor at his cost.
8. For electrical lighting work prevailing SOR of Electrical work of R&B of GOG is
to be followed.
3.21 Dismantling:
3.21.1 To ensure safety & Technical parameters in safe guard during dismantling, in
person of concerned Engineer in charge. Also to stack the materials at safe
place in proper stacking manner .
Signature of Contractor Superintending-Engineer
GETCO, CO, Bharuch
TECHNICAL PARTICULARS FOR ERECTION, TESTING AND COMMISSIONING OF
TRANSMISSION LINES ON D/C-M/C TOWERS:
4.1 The scope for erection works covered under this section consist of:
I. Check survey with minor survey work and if required, original survey and profiling.
taking delivery of structure and line material from the carrier/ The GETCO, checking
them, transporting to contractor's stores and keeping in safe custody,
II. to take suitable storage-cum-erection insurance,
III.distribution of all materials to erection site,
IV. Excavation, stub-setting, concreting etc. complete work for foundation including
dewatering, shoring & shuttering, cutting of stubs, fabrication and supply of
chimney material and form boxes etc.
V. Tower erection including fixing of attachments, accessories and tack welding,
VI. Stringing of AAA/ACSR conductor/s and ground wires with providing jumpers etc. upto
sub-station gantries at both ends and making LILO arrangement including
dismantling work with one circuit in live condition wherever applicable and if the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
item is included in Schedule B. De-stringing of existing 66kV D/C line including
grounding of insulator string, clamping, grounding of earth wire/conductor
crediting to The GETCO’s store.
VII.Testing, commissioning and guarantee of all the activities carried out from (I) to
3.1.2 The successful Contractor shall carry out all addition/alteration required to
complete the line for commissioning.
3.1.3 The GETCO will supply structure materials, bolts-nuts, attachments, insulators,
insulator-hardwares, conductor, accessories, ground wire, ground wire
accessories, etc. required for erection of transmission line.
3.1.4 All works shall be carried out in accordance with the revised and latest
provisions under Indian Electricity Act and Rules made there under.
3.1.5 All the erection tools required during construction of line shall be arranged by
the contractor at his own cost. The Contractor shall only be responsible for
damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till
the complete line is taken over by the GETCO.
4.2 ROUTE:
4.2.1 The proposed route of the line is available with concerned field office. The
tenderers are presumed to have acquainted themselves with the route of line
before submitting their offer.
4.2.2 The successful bidder has to collect from concerned field office the detailed
route on topographic sheet duly approved by the GETCO immediately on receipt of
the Order. He shall also arrange visit of proposed line route jointly with The
GETCO's representative for important marks coming along with the route.
4.3 SURVEY:
4.3.1 On completion of final survey (check survey), the contractor should return the
copy of original profiles along with copies of final survey to the Engineer-in-
Charge of the work, before commencement of digging of pits. If, any subsequent
alteration is found necessary i.e. during check survey, the contractor shall have
to submit full details of such alteration with justification and obtain approval
of the Superintending Engineer before carrying out the work. The contractor will
be responsible for any inaccuracies that may arise due to incorrect survey /
spotting of tower etc. and should rectify such inaccuracies at his own cost.
The approval of check survey shall be obtained from the E.E. (AM) concerned.
4.3.2 For important crossing like major road, railways, rivers, power line,
telecommunication lines etc. the clearances shall be provided in accordance with
the prevailing rules of the concerned authority.
4.3.3 Tension towers with double tension hardware shall be located on either side for
railway and power line crossings depending on the merits of each case. Necessary
copies of finally approved drawings required for approval of concerned authority
shall be supplied by the Contractor free of cost.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.3.4 The angle of crossing shall be maintained at 90 Deg. as far as possible for
crossings like river, railway, power line and P&T crossings but never less than
4.3.5 The crossing towers with double suspension hardware and dead end type anchor
towers shall be located for major river crossings.
4.4 TAKING DELIVERY AND DISTRIBUTION OF MATERIALS:
4.4.1 The Contractor has to take delivery of tower materials/ Girders directly from the
GETCO's store. The line materials that will be issued by the GETCO will be in “as
is where is" condition at the stores centre of the GETCO in that area during
working hours of working days. The Contractor will be fully responsible for any
damage to or loss of all materials at any stage during transportation or
4.4.2 The Contractor has to open site store immediately nearby the line route and ensure
for safe custody of all the materials stored at his own cost.
4.5 WAY LEAVE, TREE CUTTING AND OTHER OBSTRUCTIONS:
4.5.1 The contractor will arrange for right of way and for tree clearance. Proposals
in this connection will have to be prepared and submitted by the Contractor well
in time. It will also be necessary on the part of contractor to instruct his
labourers and staff to use minimum area while doing the work where there are
standing crops. No person of the contractor should pick any items from standing
crops or fruits. The contractor should take all possible steps to avoid or
minimize damage to standing crops, etc.
4.5.2 The contractor should immediately notify any obstructions or hindrance from local
villagers or the local authorities in the execution of the work to the concerned
Engineer-in-Charge but should not deal directly in the matter. The Engineer -in-
Charge will arrange to remove the obstacles as soon as possible.
4.5.3 For the clearances, permissions, removal of obstructions in way leave etc. the
Contractor shall not remain contended by simply informing the GETCO, but shall
invariably assist and arrange for personal follow up to overcome the difficulties
in the interest of progress of the work.
4.5.4 METHODOLOGY FOR COMPENSATION TOWARDS ROW: Methodology for compensation towards
Right of Way (ROW)/Way leave clearance/Tree crop damages etc during construction
of this line will be made as per latest GOG Tharav Dated 04.07.26.
4.6 ACCESS TO LOCATIONS:
4.6.1 It will be the Contractor’s sole responsibility to take the materials upto the
location. Any path way, temporary road, temporary bridge required will have to
be provided by the Contractor at his own cost.1f, for any reasons the above is
not feasible, the Contractor at his own cost shall have to arrange transportation
by head loads.
The contractor will be deemed to be very well familiar with the route of the
transmission line before giving the offer. Notwithstanding the difficulties of
terrain, location approaches, way leave and other obstructions the price quoted
for all the items of erection in the Schedule of Section-E-IV shall not undergo
any change at any stage or granted by the GETCO for any special
rates/consideration.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
SHORING, SHUTTERING AND DEWATERING:
The Contractor has to arrange for shoring, shuttering and dewatering work during
activities of excavation, stub setting and concreting. These shall be done at his
4.7 EXCAVATION FOR FOUNDATIONS:
4.7.1 On finalization of location, the Contractor shall make a trial pit on all four
legs of tower having width of 900 mm x 900 mm and depth according to following
alternatives:
Alternative-I: If the rock is encountered within the depth of 1.5 mtr, the excavation of
trial pit shall be restricted to l.5 mtr. During such excavation, it
should be ensured that the depth of rock encountered shall meet with the
concrete plug height of respective rock type foundation design. Otherwise,
the excavation depth be increased in such a manner that depth of rock
encountered shall meet the concrete block height of respective rock type
foundation design. The total depth of excavated pit shall be limited to
mtrs for adopting suitable foundation design.
Alternative-II: When the rock is not encountered up to 3 / 3.5 mtr, the excavation shall
be stopped and depending upon the soil strata of excavated pits, the
classification of foundation type to be adopted be obtained.
4.7.2 After the excavation of all the four pits for the tower, as indicated in 3.7.1
above, the Engineer-in-Charge of the work (Elect. & Civil) or Engineer nominated
by the Chief Engineer (Proj), Head Office shall examine the type of soil and
foundation to be adopted for the particular location. For this purpose,
Contractor shall offer at least 10 (Ten) locations at a time. The decision given
by the Engineer-in-Charge of works (Elect. & Civil) or Engineer nominated by
Chief Engineer (Proj) for adopting type of foundation at particular location
shall be binding to the Contractor.
4.7.3 After the decision of foundation type to be adopted, the excavation dimensions of
trial pits shall be increased to the respective approved foundation design, if
required. For the excavation done in excess of determined volumes (according to
approved foundation design), the contractor has to fill the extra excavation by
1:2:4 mix. concrete at his own cost.
4.7.4 The details of strata found during the trial excavation, decision about the
foundation to be adopted and the final actual excavation volumes shall then be
recorded in the register to be maintained for this purpose, with proper
authentications of the engineers of the Contractor.
4.7.5 The payment of excavation will be limited to the volumes as per approved excavation
drawings even though the Contractor may excavate more for the sake of his own
convenience or for any reasons. If the excavated dimension/s is/are more than the
dimension/s shown in the approved drawing, the additional excavated volume should
be filled in with 1:2:4 mixture concrete at Contractors cost in respect of
materials, labours etc.
4.7.6 In case of rock soil, the extra excavated rock portion on all sides shall be
filled with 1:2:4 mix concrete at his own cost in respect of materials, labours
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.7.7 The rates indicated in schedule for excavation work in each soil shall be
applicable to all the locations as per actual condition of the soil strata
irrespective of classification of type of foundation.
4.7.8 The rates for excavation indicated in schedule shall also be applicable for
benching work, if required.
4.7.9 Definition of Soils:
The soil to be excavated for tower foundations are classified as under:
a) Normal dry Soil:
The soil readily removable with ordinary spades and shovels viz. murram /
hard murram etc. and to be used for location in normal dry cohesive or non-
cohesive soils of any colour or soil containing loose boulders.
b) Black Cotton Soil:
The clayey soil which can be removable with ordinary spades, shovels, pick,
axes etc. and swells when wet and shrinkes when dry, but not necessarily
black in colour.
c) Soft Rock:
The rock like hard gravel, kankar, limia stone, fissured rock and other
types with similar nature, which gets decomposed and can be quarried or
split with crow bar or pick or axe.
d) Hard Rock:
The rock which can be removed by chieselling, drilling, blasting.
e) Sandy Soil:
The normal / black cotton soil which contains more than 50 % sand OR
complete sand.
f) Wet Soil:
The normal / black cotton soil having long standing surface water for more
than 6 months and with water penetration not exceeding one meter below
ground level e.g. paddy field.
g) Submerged Soil:
The normal / black cotton soils met with sub soil water which requires
dewatering.
Note: For rock, it may be ensured that it is the parent soil strata and not the
isolated local boulders.
4.7.10 Guideline for adopting various types of foundations: (All dimension are in mm)
Layer depth from ground level in mm.
Sr. Type of foundation
Type of soil
No. to be adopted
1. Normal Dry Soil Dry B.C. G.L. 500 m.m.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Layer depth from ground level in mm.
Sr. Type of foundation
Type of soil
No. to be adopted
(NDS) NDS DBC 3500 m.m.
OR Layer at 1(a)
NDS G.L. 3500 m.m.
2. Partially Submerged Soil strata as at (1) / (5) but with soil water table available
Normal below 1500 m.m. from G.L. to 3500 m.m.
3. Fully Submerged Soil strata as at (1) / (5) but with soil water table available
Normal soil within 1500 m.m. from G.L. to 3500 m.m.
4. Wet Normal Soil Soil strata as at (1) but surface water logged for more than
(WNS) months and penetrating upto 1000 m.m from ground level.
5. Partially Dry Black DBC G.L. More than 500 m.m. &
Cotton upto 1500m.m.
(PDBC) N D S DBC
Layer at 5(a)
6. Fully Dry Black DBC G.L. More than 1500 m.m.
Cotton and upto 3500 m.m.
(FDBC) NDS DBC
Layer at 6(a)
7. Partially Submerged Partially Soil strata as at (6) but with sub soil water table
Black Cotton available 1500 m.m. from G.L. upto 3500 m.m.
8. Fully Submerged Soil strata as at (6) but with sub soil water table available
Black Cotton within 1500 m.m. from Ground Level upto 3500 m.m.
9. Wet Black Cotton Soil strata as at (5) or (6) but surface water logged for more
(WBC) than 6 months and penetrating upto 1000 m.m. from ground Level.
10. Soft Rock (SR) Dry B.C. or NDS G.L. Rock
Soft Rock DBC/NDS layer at 1500 m.m. within
10(a) (within 3500m.m.
11. Hard Rock (H R) Dry B.C. or NDS G.L. Rock
DBC/NDS layer at 1500/within 3500m.m.
11(a) (within
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Layer depth from ground level in mm.
Sr. Type of foundation
Type of soil
No. to be adopted
12. Sandy Dry B.C. or NDS Mixed with sand upto 3500 mm. (more
than 50% Sandy)
Sand Within 1500mm. 3500 m.m.
4.7.11 For very complicated soil strata other than indicated above like soft rock-cum
submerged or hard rock-cum-submerged, normal-clayee-sandy soil etc., the matter
should be referred to Chief Engineer (Trans) for decision regarding the type of
foundation to be adopted, giving details of strata of soils in all the four of the
location along with proposal recommended. The proposal shall be submitted in
consultation with the Engineer-in- Charge (Civil & Electrical).
4.7.12 Precautionary Measures:
a. During excavation of rock (by chiseling or blasting or drilling) extra care should
be taken, so that excavation dimensions required for rock portion is maintained
almost equal to but never less than approved foundation design. The rock surface
shall be as rough as possible for proper bondage between rock and concrete. In
case of extra excavation in rock, the same shall be filled with 1:2:4 mix concrete
at Contractor's own cost i.e. the concrete shall be filled in the gap for the
desired height of the concrete plug. The Contractor shall arrange for required
blasting materials at his own cost and will be responsible for storage and use of
such materials.
b. Whenever dewatering is necessary during excavation for smooth execution of the
work, manual dewatering will be resorted to in case of little water otherwise
mechanical or power driven dewatering shall be deployed at Contractors own cost.
c. In case of collapsible soil shoring and shuttering shall be provided by the
Contractor at his own cost. No extra charge shall be admissible for removal of
collapsed soil in the pit.
d. Whenever necessary, the leveling of soil shall be done.
e. For shallow foundation, the stub shall bee cut to proper length at contractor’s
own cost and record shall be maintained for such locations in terms of cut
4.8 STUB SETTING:
4.8.1 The Contractor shall be fully responsible for correct setting of stubs in
accordance with approved methods of the exact locations and alignments and in
precisely correct level. Stub-setting templates to be supplied by the GETCO
should be used for proper, setting of stubs.
4.8.2 The rates for stub setting are inclusive of cutting of stubs (if any), setting of
stubs, levelling at correct level, dismantling of template after concrete, back-
filling etc. work.
4.8.3 Above rates shall be on per MT basis for normal, extensions upto 21 meters and
special/river crossing towers.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.8.4 The weights payable for stub-setting item shall be comprising the weight of stub
and its respective stub setting template.
4.8.5 The Contractor shall invariably return the stub setting templates with bolt-nuts
in good condition to the GETCO on completion of foundation work. The templates
shall be returned duly painted with red oxide, if ungalvanised and marked with its
4.9 CONCRETE:
4.9.1 Form boxes made out of M.S. sheet for chimney and steps or pyramids shall be
prepared by the contractor as per approved foundation design, drawings at his own
4.9.2 The cement required shall be arranged by the contractor from his own stock or by
purchasing from the market. (Please see the Special condition for use of cement).
4.9.3 The cement consumption for different types of concrete shall be considered as
1:1.5:3 mix. – 8.2 Bags, per Cu. metre. (M 20)
1:2:4 mix. - 6.5 Bags, per Cu. metre. (M 15)
1:3:6 mix. - 4.5 Bags, per Cu. metre. (M 10)
4.9.4 The sand shall be of the best quality containing hard siliceous materials, clean
and of sharp angular grit type and free from earth or organic matter or salts and
to the satisfaction of the Engineer-in-Charge. The sand shall be washed before
use. No saltish or brakish water shall be used for concreting.
4.9.5 The mixture of concrete to be used shall be such as to produce a sound, compact
and water-proof concrete. The mixture shall not be weaker than the ratio to be
prepared. The stone metal shall not be in size bigger than 40 m.m. The concrete
for chimney shall be prepared with 20 mm stone metal and the concrete for
pyramid/step/pad shall be prepared with 20 mm or 40 mm stone metal. The mixture
shall be prepared using mixing machine only. It should also be free from grit
and dirt. The concrete shall be mixed as stiff as required for placing the
concrete in the form of moulds with ease and degree to which concrete resists
segregation will permit. Hence, the quantity of water used should not be too
4.9.6 Proper form or moulds adequately braced to retain proper shape while concreting,
should be used for chimney, pyramid and slab portions. Form boxes should be water
tight so as not to allow cement cream to come out leaving only sand and gully to
form honey combs in concrete. Form boxes should be cleaned and oiled before using
for concreting.
4.9.7 All sub-merged locations must be kept completely dewatered both during the
placing of concrete and for 24 hours after completion.There should be no
disturbance of concrete by water during this period.
4.9.8 Form boxes should not be removed before 24 hours, after concreting. Concrete
surfaces where required should be set right with rich cement and mortar after
removal of the forms.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.9.9 The Superintending Engineer (Trans), Bharuch or Engineer appointed by him at his
sole desecration may uncover any cast foundation to find out the workmanship of
foundation. Contractor shall render necessary assistance during such fact finding
operation and shall comply with the report of the investigating officer.
4.9.10 The tor steel bars required for RCC type foundation shall be procured by the
contractor in advance to avoid delay in the work.
4.9.11 The contractor will be responsible for constructing the foundations in accordance
with the design of each type of foundation supplied by the GETCO.
4.9.12 The rates indicated in schedule for concrete work shall be applicable to all the
locations irrespective of soil strata and type of foundation adopted.
4.9.13 The tor steel bars required for RCC type foundation shall be procured by the
Contractor in advance to avoid delay in the work.
4.9.14 The empty cement bag shall be retained by the Contractor.
4.9.15 No wastage is permitted for reinforcement steel as reinforcement steel is to be
procured by the contractor at his own cost. NO over lapping of RCC is permitted in
foundation work.
4.9.16 The GETCO reserves right to test the quality of steel and cement procured by the
contractor at any Govt. recognized Laboratory and intended to be used for the
tower foundation works. The test results shall be binding to the Contractor.
4.10 CURING AND BACK-FILLING:
4.10.1 After 24 hours of pouring, the concrete should be cured by keeping it continuously
wet for 14 days. After 48 hours of pouring, the pit may be back filled with
and fodder woods, shrubs, thorn etc.) sprinkled with necessary amount of water
and well compressed and consolidated in layers not exceeding 150 mm. If the
excavated soil consists of large boulders/stone, the same shall be broken to
maximum size of 80 mm and mixed with soil to be back filled. At the locations
where borrowed earth is required for back filling, this shall be done by the
Contractor at his own cost, irrespective of transportation from any lead.
Thereafter, the exposed top end the fill shall be kept wet for the remainder of
above prescribed curing period. The uncovered portion of concrete chimney above
the back filled earth shall be kept wet by providing empty gunny bags fully
wrapped around the concrete chimney for curing and ensure that the bags are kept
wet by frequent pouring of water on them.
4.10.2 Extra ordinary care be taken during back-filling. The Contractor and The GETCO's
Engineers at site shall ensure that back-filling is done in the manner referred
above, so that back-filled earth becomes homogeneous with surrounding parent soil
with the passage of the time.
4.10.3 The site engineer of the contractor shall record the day / date of curing, back-
filling etc. and sign in the register for its correctness along with The GETCO's
representative.
4.10.4 The rates of stub setting are including the work of back filling of excavated pit.
The large stones / boulders shall be broken to maximum 80 mm size before used for
back-filling at no extra cost to the GETCO.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.10.5 The quantity of excavated earth obtained from a particular location shall
generally be utilized in back filling work in tower footing of same location,
unless it is unsuitable for such purpose. In the later case, the back-filling
shall be done with borrowed earth of suitable quality irrespective of lead at no
extra cost to the GETCO.
4.11 PROTECTION OF TOWER FOOTING:/ ‘H’ FRAME FOOTING.
4.11.1 The work shall include all necessary stone revetment, concreting and earth
filling above ground level and the clearance from stacking on the site of all
surplus excavated soil, special measures for protection of foundation close to or
in nallas, river bed hilly/undulated terrain etc. by providing suitable
revetment. The top seal cover of the stone revetment shall be done with M150
concrete (1:2:4 mix). The Contractor shall furnish in the profile itself the
recommendations for providing protection at these locations wherever required.
However, the work shall be executed as per approved drawings only.
4.11.2 The quantity of excavated earth obtained from a particular location shall
generally be utilized in back filling work in protection of tower footing of same
location, unless it is unsuitable for such purpose. In the later case, the back
filling shall be done with borrowed earth of suitable quality irrespective of
lead and the consolidation of earth shall also be done free of cost.
4.11.3 Quantities of various protection work like stone revetment, concrete revetment,
brick masonry and random stone masonry to the foundations are to be executed by
the successful contractor if indicated in the schedule- B and payment for such
quantity shall be as per unit rates accepted.
4.12 ERECTION OF TOWERS:
4.12.1 The super-structure of towers should be erected on foundations after 14 days of
concreting. However, the method adopted for erection of tower is left to the
discretion of the contractor subject to the condition that he takes
responsibility for any damage to materials. No tower member should get strained
or bent during erection. The towers must be truly vertical after erection and no
straining would be allowed to bring it in alignment. Maximum tolerance in
verticality that will be permitted is ONE mm per 360mm of tower height. The bolt
head shall be on outside faces and nuts and washers on inside faces of the tower.
All bolts & nuts shall be made fully tight and finally the bolt threads shall be
centre punched to avoid nuts getting loose. Punching of bolts shall be made by
chamfering the threads with centre punch atleast at three places equally spaced
on contact surface of bolts and nuts.
4.12.2 Complete tower erection shall include erection of all accessories like danger
plate, number plate, phase plate, C.I. Plate, Anti-climbing devices and fittings
including attachments like step bolts, ladders, platforms, 'U' bolts, shackles,
hangers, strain plates etc.
4.12.3 Suitable tower extension shall be erected to get desired ground clearance
whenever required, as determined at the time of survey and profiles.
4.12.4 To avoid pilferage of bolts and nuts and tower members, the bolts of the two
bottom most panels (say upto 10 meters) shall be tack welded at three places on
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
the nuts diametrically. The zinc rich paint shall be procured by the Contractor
at his own cost and shall be applied immediately following the tack welding.
4.12.5 The contractor shall arrange for all the equipments for tack-welding purpose. The
rates shall be inclusive of supply and application of zinc rich paint on it. The
tack welding of nuts with bolts for two bottom – most panels shall be carried as
per the instruction of E.I.C.
4.13 GROUNDING:
4.13.1 It is necessary that in no case, tower footing resistance should be more than
Ohms during dry weather. The Contractor shall arrange required equipments for
measurement of soil and tower footing resistance. The payment shall be released
only after receipt of final soil resistance details of providing earthing at each
4.13.2 After erection of towers, the Contractor shall measure the footing resistance of
each location and prepare the record for submission and approval of Engineer-in-
Charge for deciding the type of grounding to be provided.
4.13.3 Pipe Type Earthing:
At locations where footing resistance does not exceed 10 Ohms., the pipe type
earthing as per appended drawing shall be provided. The contractor will have to
supply all the materials required for grounding like pipe, flat, bolt- nuts,
salt, fine broken coke/charcoal etc. The earthing is to be done by making a bore
hole for insertion of pipe away from the tower leg excavation line.
4.13.4 Counterpoise Earthing:
At locations, where footing resistance exceeds 10 Ohms, counterpoise earthing as
per appended drawing shall be provided to bring down the tower footing resistance
below 10 Ohms. The Contractor will have to supply all the materials required for
grounding like lugs, G.I. wire, bolts, nuts etc. The counterpoise earthing shall
be burried 600 mm below ground level.
4.13.5 The method for providing earthing shall be at the desecration of the Contractor.
4.13.6 The record of footing resistance shall be maintained in consultation with
Engineer-in-Charge before and after providing of suitable earthing.
4.14 INSULATOR HOISTING ON TOWERS / ‘H’ FRAME:
4.14.1 Suspension insulator strings shall be used on all tangent type towers and tension
insulator strings on all small, medium, large angle and dead end type tension
towers. Technical particulars of insulator strings are appended herewith.
4.14.2 Insulators strings shall be assembled on ground. These shall be cleaned and
examined for hair cracks, chips or defective glazing (not exceeding half
centimeter square) and then hoisted by careful handling. The work will include
fixings of all hardwares and fittings in their proper places and order.
4.15 STRINGING ON TOWERS / ‘H’ FRAME:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.15.1 Before commencing of stringing work, contractor must obtain approval of sag
tension charts (these shall have to be supplied by the contractor) showing final
sags and tension for various temperature and spans. The stringing chart shall be
prepared according to appended format only.
4.15.2 The Contractor shall be responsible and will take care of proper handling of
drums from stores to site. Sufficient numbers of aluminum snatch blocks shall be
used for paving out the ACSR/AAA Conductors. Necessary precautions shall be taken
to avoid conductor rubbing on the ground by providing adequate ground roller,
rollers on supports. Additional rollers shall also be provided to cross thorny
hedges, footing and other obstructions to avoid scratching of conductor. The
conductor and ground wire shall be made to sag correctly as per stringing charts
before they are finally transferred to the hardwares for conductors and to clamps
for ground wire. No joint should be made at less than 30 metres from the tower
end and no joint shall be permitted in Railway, River, road and other important
crossings spans. There shall not be more than one joint in a span of each
conductor. The sag The GETCO, if used shall be adjusted to suit the sag indicated
against actual temperature for an individual span. The thermometer shall be
provided at the conductor point during the stringing work. Dynamometers shall be
used in tensioning the conductors. All conductors shall be stressed to their
maximum working load at the time of stringing, as per approved stringing charts.
4.15.3 The minimum clearance between the lowest point of conductor and ground shall not
be less than required. All compression joints should be carefully made and a
record of initial and final lengths of the joints jointly signed by Contractor's
and The GETCO's representatives should be maintained. Check for sag should also
be made at intervals when conductors are drawn up. Over stressing, causing damage
to towers should be avoided. Care should be exercised not to over tension the
conductor. An extra sag of 150 mm be allowed at all the important tension
locations like Railway/River Crossings.
4.15.4 After being pulled the conductor/ground wire shall not be allowed to hang in the
stringing sheaves for more than 72 hours, before being pulled to the specified
sag. During the time the conductor / ground wire is on the stringing sheaves
before sagging-in, it shall be ensured that the conductor / ground wire is not
damaged due to wind, vibration, vehicles or other causes. Scaffolding should be
used to cross the important roads and Railway Crossing for minimum interruption
to traffic.
4.15.5 The conductor shall be pulled upto desired sag and left in serial stringing
sheaves for at least one hour after which the sag shall be rechecked and
adjusted, if necessary, before clipping in and transferring the conductors from
the serial stringing sheaves to the suspension clamps.
4.15.6 Conductor shall be clamped within 24 hours of sagging. The sag will be checked in
the larger spans of the section in case of sections upto eight spans and in one
intermediate larger span also for section with more than eight spans.
4.15.7 The stringing sheaves, when suspended on the transmission structure for sagging,
shall be so adjusted that the conductor will be on the sheaves at the same height
as the suspension clamp to which it is to be secured.
4.15.8 The stringing of the ground wire shall be done in accordance with the stringing
charts approved by the GETCO. The ground wire shall be strung to run continuously
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
over the conductors. The ground wire shall be pulled, sagged and clamped-in from
tension tower to tension tower before the phase conductors are pulled in that
4.15.9 All the line conductors shall be terminated at sub-station structures whose
details shall be furnished by the GETCO at the appropriate time. The contractor
shall fix strain insulators on the sub-station structures.
4.15.10 Armour rods and vibration dampers shall be fitted at each suspension tower before
final clamping of conductor with Insulator strings. Vibration damper shall be
fitted at each tension tower after final clamping of conductor with insulator
strings. Vibration dampers are to be fixed using aluminium tape with each
clamping bolt and in correct vertical position in relation to conductor.
Compression type joints are to be used for jointing of conductors. Each part
connected with joints shall be perfectly cleaned by wire brush and properly
greased before final compression. All the joints of conductors and earth wire
shall be made in the best workmanship manner and shall be perfectly straight and
having maximum possible strength.
4.15.11 Proper guys shall be provided to counter balance the paving out tension of
conductor/ ground wire at the tension locations, to avoid damage to towers and/or
4.15.12 Stringing work shall mean, the activities of fixing of insulator and insulator
hardwares, paving, jointing, tensioning, clamping with armour-rod, providing
dampers, repairing of conductors (if any) and fixing the conductor at tension
hardwares etc. De-stringing work is the part of this contract. It includes de-
clamping of the existing conductor / earth wire grounding of insulator string
earth wire / conductor and depositing the same in the GETCO`s store.
4.15.13 The rates for any type of stringing work, out of followings are indicated in
Schedule B.
o stringing of one / two ground wire/s,
o stringing of single / double circuit line with single bundle conductor/s,
o hot-line stringing of conductor,
4.15.14 The rates for stringing of conductors and ground wire for special crossings like
river shall be on per KM basis only and shall be paid according to actual work
done. In case special towers are suspension type the special shall mean major
river crossing section considering the span from one anchor tower to the other end
anchor tower
4.15.15 The stringing work should be planned in such a manner in consultation with the
Engineer in charge of the work that minimum shut down of power line crossings are
required. Revenue loss due to any undue shut down i.e. after the shutdown is
arranged and required to be extended on account of contractor shall be recoverable
from the contractor.
4.15.16 All members of dismantled tower and line materials shall be credited by the
contractor to Const. Div. store
4.15.17 The empty steel drums of conductor and earth wire shall be returned by the
contractor.
4.16 TOWER ACCOUNT
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.16.1 Within the month of completion of the foundation activity of the line all the
stub setting templates shall be returned / credited to the GETCO's store as per
the instruction of the Engineer-in-incharge of the works at no extra cost to the
4.16.2 Within the month of completion tower erection activity of the line all surplus
stubs / towers / extensions including bolts, nuts and accessories etc. shall be
returned / credited to the GETCO's store including its proper stacking as per
instruction of the Engineer- in-charge of the works at no extra cost to the
GETCO. If contractor fails to do so, cost of the surplus towers i extensions /
stub setting template including bob & nuts shall be deducted from the payable
amount of this or any other work executed by the contractor.
4.16.3 So far as the accounting of unused surplus towers is concerned, the same shall be
done on the basis of complete tower only and not on per MT basis. For shortag e of
any part (as per BOM) /Bolts-Nuts/Accessories to complete the tower, recovery of
complete full tower shall be made from contractor’s bill.
4.16.4 All the surplus towers as mentioned above shall be returned to the stores as per
instruction of Engineer-in-Charge of the works OR at the TOWER BANK situated at
Bharuch within one month of completion of towers erection. This includes
unloading of tower material and stacking it as per instruction of the Engineer- -
in-Charge at no extra cost to the GETCO.
4.16 MATERIAL ACCOUNT:
4.17.1 On completion of the work, all surplus tower and line materials etc. and stub-
templates shall be returned by the contractor to the stores of the GETCO, as per
the instructions of the Engineer-in-charge of the works at no extra cost to the
4.17.2 The contractor shall submit the complete materials account immediately after the
work is completed and in any case not later than 3 months from the date of
completion or handing over of the line, whichever is earlier.
4.18 WASTAGES:
4.18.1 The contractor shall make every effort to minimize the breakages, losses and
wastages of line materials/cement etc. supplied “Free of Cost” by the GETCO for line
erection work.
4.18.2 The maximum ceiling for wastages permitted is as under:
Sr. No. Item % wastages permitted (Maximum)
i) Conductor and earth wire. ½% (for jumpering, sister wire & sag.)
ii) Conductor and earth wire. ½% (for credit as scrap of cut-piece length
(from 10 Mtrs. Upto 30 Mtrs.)
iii) Conductor and earth wire. And 2% (for credit in pieces as good conductor
from 10 Mtrs. to 30 Mtrs.)
iv) Bolt-nuts Nil (No extra bolts-nuts will be supplied).
v) Insulators ¼ %
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.18.3 All the wastages are accountable except for items (i) of Clause No.2.24.2. The
account of permissible wastages shall be maintained at site in the registers as
prescribed by the Engineer-in-Charge of works, which will be subjected to
periodical checking by purchasers authorized representatives.
4.18.4 The account of wastages shall also be submitted on monthly basis (with running
accounts bills) to the Engineer-in-Charge of works as per Statement-B, Appendix-I
of the specification. The copy of R.A. Bill shall also be submitted to the
concerned Executive. Engineer (Const).
4.18.5 The contractor has to return empty steel conductor and earth wire drum.
4.19 TESTING AND COMMISSIONING:
4.19.1 The Contractor after completion of erection work will ensure that all works
connected with line have been completed. These works shall be done correctly as
per Indian Electricity Rules and Procedures. Any extra cost involved due to
incompleteness of work or bad workmanship found out subsequently shall be set
right forth with by the Contractor at his cost.
4.19.2 After the erection is completed in all respects, the line should be thoroughly
patrolled and checked for continuity and clearances. The line should be meggered
to check its insulation level. Afterwards a written confirmation should be given
to the Engineer-in-Charge that the men, materials, tools and earthings (if any)
are removed and the line is safe for charging. On charging the line, if it does
not hold and trips, the contractor should arrange to patrol the line and find out
the causes for the tripping and rectify the defect at no extra cost to the GETCO.
4.20 HANDING OVER OF LINE DOCUMENTS:
4.20.1 On completion of all erection activities, the contractor has to furnish following
informations along with technical details to concerned Engineer-in-Charge of the
work in triplicate duly bound: -
a. Approved surveyed route with permanent marks, (To be obtained from the GETCO)
b. Approved copy of profiles with tower schedule, (To be obtained from the GETCO
except for portion where any change is approved)
c. Location wise soil strata details of each pit excavated, type of foundation
executed, volumes of excavation & concrete and RCC steel weights,
d. Details of revetment, retaining walls, etc., work done for protection of tower
footing and their approved drawing copies,
e. Approved copies of stringing charts,
f. Value of tower footing resistance before & after providing earthing and type
of earthing executed,
g. Details of spans and phase where mid span joint, repair sleeve used,
h. Location wise type and numbers of insulators, insulator hardwares, earthwire
hardwares, conductor accessories, etc., provided,
i. Separate detail of each crossing like road, river, railway, power line, P&T
Line, etc and details of clearance as per Indian Electricity Rules.
4.21 GENERAL:
4.21.1 The Contractor shall ensure that at the end of each sub-activity the surplus
materials are immediately removed from the work-site to avoid loss and injury to
the public.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.21.2 The Contractor has to return all surplus materials after reconciliation of
material account in good and useable condition and settle final bill including
signature in all relevant papers required for passing of final bill within
three month from the date of charging / commissioning of line.
4.21.3 The contractor has to return empty Conductor / Earth wire Drums if it is Steel
Drum. For wooden Drums, contractor has not to return the empty Conductor/Earth
wire Drums for the conductor/ E.W used for this line.
4.21.4 If contractor does not complete the work in specified time with GETCO’s
specification or leave the site with incomplete work, GETCO will get the
remaining work executed at the risk and cost of contractor.
4.21.5 If at any time, before the security deposit is refunded to the contractor, it
shall appear to the Executive Engineer or his subordinate in charge of the work
that any work has been executed with unsound, imperfect or unskillful workmanship
or with materials of inferior quality or that any materials or articles provided
by him for the execution of the work are unsound or of an inferior quality to
that contracted for or are otherwise not in accordance with the contract, it
shall be lawful for Engineer-in-charge to intimate this fact in writing to the
contractor and then no withstanding the fact that the work, materials or articles
complained of, may have been inadvertently passed, certified and paid for, the
contractor shall be bound forthwith to rectify or remove and reconstruct the work
so specified in whole or any part, as the case may require or if so required
shall remove the materials or articles so specified and provided other suitable
materials or articles at his own charge and cost, and in the event of his failing
to do so within a period to be specified by the Engineer-in-charge in the written
intimation aforesaid the contractor shall be liable to pay compensation at the
rate of one percent on the amount of the estimate for every day, not exceeding
ten days during which the failure so continue and in the event of any such
failure as aforesaid the Engineer-in-charge may rectify or remove and re-execute
the work or remove and replace the materials or articles complained of, as the
case may be, at the risk and expense in all respects of contractor should the
Engineer-in-charge consider that any such inferior work or materials as described
above may be accepted, or made use of, it shall be within his discretion to
accept the same as such reduced rates as he may fix thereof. Provided that in the
case of any work of which visible check is not possible, if the Engineer-in -
charge or his subordinate in charge of the work feels that such work has been
executed with unsound, imperfect or unskillful workmanship or with materials of
inferior quality, he shall take sample tests at random, cost of which shall have
to be borne by the contractor and if after taking such test, part of such work is
found to be defective in any respect or to have been executed with materials of
inferior quality, then the contractor shall be paid for the whole work such
amount as may be fixed by the office of the Engineer-in-charge on the basis of
the lowest quality of work found by him in such samples tests.
4.21.6 If the contractor fails to complete the job in stipulated time period/leaves the
site with incomplete work, GETCO will get the remaining work executed at the risk &
cost of contractor.
4.22 PROGRESS REPORT:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.22.1 Daily progress report in duplicate shall be regularly submitted to the Executive
Engineer (Const), with a copy to Supdt. Engineer (Trans). The Contractor shall
also maintain register as per Schedule of Section E-IV.
4.23 SITE VISIT:
4.23.1 The Engineer-in-Charge of the works or his representative will be free to visit
the contractor's works, their site stores and erection site and also verify the
purchasers materials in the custody of the contractor, as and when required.
4.24 WARRANTY:
4.24.1 The erection work will be covered under warranty period against any defect
arising from erection workmanship for a period of 18 months from the date of
completion of line or 12 months from the date of handing over of the line to the
satisfaction of Superintending Engineer (Trans), at his sole discretion,
whichever is earlier.
4.25 QUANTITIES:
4.25.1 Quantities given in the Schedule-B are to be executed by the contractor at the
rate accepted by the GETCO in the A/T. In case of any deviation/tower quantity
/type of tower/ length of line, excavation/ concreting resulting in an increase
in which event the field officer shall obtain prior approval of the competent
authority of GETCO and excess quantity shall be paid only at accepted rate of the
Design / drawings for any other item to be executed, if required shall be
prepared and submitted to the GETCO for approval by the successful contractor at
no extra cost to the GETCO and in time to avoid delay in completion period.
Payment for such Items executed shall be made on the basis of quantities of
approved designs and rates accepted in the A/T.
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any
employee of agency or outsider due to negligence or non-compliance of GETCO safety
norms then in addition to the compensation and liability as per statutory
requirement, contractor / agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lacs Rs.40000/- plus GST as applicable
3 10 to 100 Lacs Rs.100,000/- plus GST as applicable
4 > 100 Lacs 1.0 % plus GST as applicable
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Reporting:
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within
hours of fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and
binding to the contractor /Agency.
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence
of contractor’s site in charge and supervisor. Safety document shall be handed over
and vital safety norms and key points of safety related to project shall be
explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the
following checks during execution of work shall be covered.
3.21 Safety equipments available and utilize.
(a) Helmet.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.22 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(a) P.P.rope.
(b) Wire rope and sling.
(c) Earthing rod
3.24 If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs.1000/- plus GST per occasion.
(Max.Rs.3000/--for violation of three conditions) During subsequent visit, if
violation is found, then double penalty plus GST shall be deducted from the bill
of the Contractor/Agency.
Signature of Contractor Superintending Engineer
Safety Instruction for Contractors:
Following safety guidelines are mandatory for all contractors operating in GETCO premises
/on transmission lines for Electrical, non-electrical & civil works.
1. The contractors must provide advance planning of work to concerned in-charge of
substation in writing.
2. The list of workers/ lab ours with name and address must be given to S/s In charge
prior to commencement of work by the contractor.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4. The list of T&P and safety equipment (PPE) having tested and checked by GETCO
officials at site.
5. The working procedure must be specified with timings of working hours indicating tea
break & lunch break period.
6. Before starting any work whether switch yard, on line or in colony “permit to allow
to work” must be taken from control room in-charge.
7. Utilizing Electrical/non- electrical equipments, safety rules must be implemented.
8. All workers /labour & supervisors must use safety equipments (PPE) during the work.
9. If the work is to be carried out on Sunday or public holiday the necessary permission
must be taken in advance, requesting in writing.
10. Unwanted person including children of labours will not be allowed at working site/ in
the switchyard and in the prohibited area.
11. Any electrical work or electrical connections to equipment for any other work must be
carried out by certified electrician/wiremen with adequate size of wire through MCB
per I.E. Rule. Ensure that all precautions are taken to prevent electrical accident &
the installation /connection is certified by Engineer in-charge.
12. No work should be done during night hours unless & until it is required under certain
circumstances with the approval next higher authority and all necessary arrangement
of adequate lighting with safety precautions is made.
13. Joint checking of line by In-charge, contractor & supervisor prior to commencement of
work of any electrical/non-electrical work.
14. Any power line crossing, river crossing & railway crossing or any other hazards must
be discussed with workers by contractor in presence of Engineer in-charge.
15. Contractors must submit list of workers with name, qualification and experience who
are engaged for line maintenance/rectification job.
16. Line clear permit must be taken on power line crossing or passing nearby for safety
of workers. This must be ensured by GETCO supervisor/in-charge of substation before
starting the work.
17. Contractors must arrange for Shelter and drinking water facility for the labours
/workers engaged with the permission of S/s in charge.
18. The method of work, required T&P and manpower should be discussed between GETCO
supervisor, contractor’s supervisor and gang leaders.
19. Prior to execution of work a joint survey must be conducted by GETCO supervisor,
contractor’s supervisor and DISCOM line man in order to identity the following.
20. The contractor has to deploy minimum 8 to 10 skill labours/ fitters at site daily
failing to which GETCO shall deduct 1,000/- plus GST as applicable per day from the
21. If the contractor fails to complete the job in stipulated time period, GETCO will get
the remaining work executed at the risk & cost of contractor.
22. The GETCO reserves the rights of interchanging and dismissing any person employed for
the work if there is complaint against his misbehavior, misconduct or disloyalty
towards job.
23. Terms and conditions regarding industrial laws and other related matters shall be
complied by the contractor in all respect.
24. The contractor shall ensure that all persons have provided safety tools, shoes,
halmets etc. as may be required for safety point of view and all his persons shall
follow the instructions issued by the GETCO from time to time in concern with the
safety and security as the work to be carried out.
25. If the Contractor defaults in execution of the orders placed or if COMPANY suffers
any financial loss due to this, then COMPANY will be forfeited Security Deposit, EMD
plus GST as applicable from other orders of the same firm or by encasing the Bank
Guarantee.
26. If the contractor fails to complete the job in stipulated time period/leaves the site
with incomplete work, GETCO will get the remaining work executed at the risk & cost
of contractor.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
SCHEDULE –A
MATERIALS:-
Following material will be supplied by GETCO “free of cost” for Work of replacement of
rusted tower locations of 132kV D/C Achhalia-Ankleshwar Line on Loc. No. 110-126 &
replacement of conductor proposed under R&M Plan 2026-27 under Asset Management
Division Zagadia..
1) G I Structures, accessories, attachments, bolts-nuts etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardwares, G I strip size 75 x 10 mm & 50 x6 mm /MS
round bars size 20/25/32/40 mm dia. Except vertical 3.0 mtr long electrodes
66 KV /11KV/LT equipments with accessories and control and relay panels.
4) 110 Volt, 100 AH DC battery sets and battery chargers.
5) Various sizes of armored control cables and LT control cables.
6) PLCC equipments and PLCC panels.
Following materials / equipments will be procured / arranged by the contractor activities
for 66 KV& above class sub stations.
1) Tools tackles required for erection activities. And stringing.
2) Earthing materials, CI frame & cover, cement, sand, gravel, bricks, bolts-nuts with
washers, number plates, painted plates etc. Vertical 3.0 mtr long electrodes
3) Maintenance free earth electrodes & back fill compound
4) Filter machine, hydraulic crane and hydraulic jointing machine/welding machines.
STORE CENTRES
SUB-Station Equipment/Material will be issued from following Store Centres:
Sr. Store Centers for issue of
No. S/s+line materials/equipments.
Work of replacement of rusted tower locations of
132kV D/C Achhalia-Ankleshwar Line on Loc. No.
1 110-126 & replacement of conductor proposed Bharuch/Haldarva
under R&M Plan 2026-27 under Asset Management
Division Zagadia..
Note: Generally, all required materials will be issued form above store centre’s of GETCO. In
case of non-availability of some items, contractor shall have to collect from other
nearby store centers without extra cost to the Board.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX – II
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this
tender [Tenderers shall submit the information in the Format detailed here under]
. work with
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost Date or
decision period
work Completion
Expected Completion
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company Date & place: _______________________________________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX-III
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
Experience
No. &Details
& details of
of position
carried out
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: ______________________________________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX-IV
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Details Capacity Numbers Make Remarks
No. machinery
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX-V
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding
representative of in company.
firm who has visited
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX – VI
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
Class – with valid
1 Registration up to
Partnership deed/Proprietor
(Notarized copy)
4 Power of Attorney (Notarized copy)
Bl. Sheet / P&L A/C, Statement of
last three years.
Rs. Lacs issued by Bank,
6 Latest Solvency certificate.
branch dtd.
7 GST Registration No.
9 Valid Electrical Contactor License
Signature of Tenderer
Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX – VII
Qualification Requirement. Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of
opening of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the
case may be], along with address, telephone, fax
Signature of Tenderer
Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
SCHEDULE –
FINANCIAL CAPABILITY
Sr. No. Details Amount Rs. In lacs Remarks
1. Solvency A scheduled Banker’s
Certificate of present
solvency be attached.
2. Annual turnover for last
five years.
3. Price of the biggest job
carried out.
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ON RECENT STAMP PAPER OF RS. 300/-
The Superintending Engineer BG. No. :
Gujarat Energy Transmission Corporation Ltd Issue Date:
Transmission Circle Office, Expiry Date :
Maktampur, Amount :
Bharuch-392012
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution Period and Guarantee / Warranty Period as
per Commercial Terms and Condition of Tender]
We, _______________________________________ (Name of the Bank and Address of the Branch giving the
Bank Guarantee) having our registered office at _________ (Address of Bank’s Registered office) hereby give
this Bank Guarantee Number __________ dated ________ and hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Gujarat Energy Transmission Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding Rs._____________
(Amount of combined Performance Guarantees towards Execution / Supply Period and Guarantee /
Warranty Period) (Rupees _______ (in words) to the said Gujarat Energy Transmission Corporation Limited,
on behalf of M/s________________________________ who have entered into a contract for the
supply/works specified below :
L.O.I No.______________________________________________ dated _________
This agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date of validity
of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution of the Bank or
the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not
be impaired or discharged by any extension of time or variation or alteration made, given conceded or
agreed, with or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the Gujarat Energy Transmission Corporation Limited.
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be
entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is restricted to
Rs._____________. (Rupees _________________________________ only). Our guarantee shall remain in
force until ___________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before ___________ (Date of validity of the Bank Guarantee), all
rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged
from all liabilities there under:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Please Mention here Complete Postal Address of the Bank Signature of the Bank’s Authorized Signatory
with Branch Code, Telephone and Fax Nos. with Official Round Seal
NAME OF DESIGNATED BANKS:
Note: The banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. Bank Guarantee number and date to be written on every page of Bank Guarantee & its extension.
2. If B/G amount is more than Rs. 50,000/-, kindly take sign of Two Bank Officer with their respective
Employee Code No.
3. Valid confirmation letter of the concerned Bank in an approved format should be attached with every Bank
Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be beyond six
months, in any case.
5. Round seal and signature of two Bank Officers with name & sign code should be affixed on every B/G
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PROFORMA FOR AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
CONTRACT AGREEMENT
THIS AGREEMENT is made at BHARUCH the_____________ day of ___________ in the Christian
Year two thousand ___________ between M/s._____________________________________ (address of
office) ________________ (hereinafter referred to as “THECONTRACTOR” which expression shall
unless excluded by or repugnant to the context include its successors or permitted assigns) of the ONE
PART and the Gujarat Energy Transmission Corporation Ltd, having their Head office at Race Course,
Baroda 390 007 (hereinafter called “The GETCO” which expression shall unless excluded by or repugnant
to the context include its successors or assigns) of the SECOND PART.
WHEREAS the aforesaid The GETCO has accepted the tender of the aforesaid contractor for work
___________________________________________________________ as per The GETCO’s Order No.
_____________________________________________________ hereinafter called “the works” and more
particularly described and enumerated or referred to in the specification, terms and conditions prescribed in
the order letter, covering letter and other letters and schedule of price which for the purpose of
identification have been signed by Shri ____________________________________ (authorised signatory)
on behalf of the contractors and by the Supt. Engineer (Trans), Gujarat Energy Transmission Corporation
Ltd, Bharuch on behalf of the GETCO, a list whereof is made out in the Schedule hereunder written and all
of which said documents are deemed to form part of this contract and included in the expression “The
works” wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS the GETCO has accepted the tender of contractors for the work of
for sum of Rs.___________________ Rupees (_______________
____________________________________________) upon the terms and subject to the conditions herein
mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT
The contractors shall do and perform all works and things in this contract mentioned and described or
which are implied therein or therefrom respectively or are reasonably necessary for the completion of the
works as mentioned and at the times, in the manner and subject to the terms and conditions and stipulations
contained in this contract, and in consideration of the due provision, executions, erection and completion of
the works agreed to by the contractor as aforesaid the GETCO doth hereby covenant with the contractor to
pay all the sums of moneys as and when they become due and payable to the contractors under the
provisions of the contract. Such payment to be made at such times and in such manner as is provided by
the contract.
The conditions and covenants stipulated here-in-before in this contract are subject to and without prejudice
to the rights of the GETCO to enforce penalty for delays and / or any other rights whatsoever including
the right to reject and cancel on default or breach by the contractor of the conditions and the covenants as
stipulated in the general conditions, specifications, forms or tender schedule etc. attached with The
GETCO’s Order No. __________________________________
The contract value, extent of works, completion dates, specifications and other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or construed to mean or apply to affect
or alter other terms and conditions of the contract and the general conditions and the contract so altered or
revised shall be and shall always be deemed to have been subject to and without prejudice to said
stipulation.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
List of documents forming part of the contract :
The GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
The GETCO’s order No. Dtd. _____ / ______/
Contractor’s acceptance of order vide letter No. _______________.
Contractor’s Partnership Deed dtd. ________________.
Contractor’s Power of Attorney / The GETCO Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties hereto have set their hands and seals this day and month, year first above
Signed, sealed and delivered by
For and behalf of M/s. __________________ (Signature)
Address : _____________________________
In the presence of (Name And Address)
i) __________________________________ (Signature)
ii) __________________________________ (Signature)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd Circle office. Bharuch.
In the presence of name, Full address and Signature:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
SCHEDULE –
INDEMNITY BOND
(Non Judicial Stamp Paper of Rs. 300/-)
KNOW ALL MEN BY THESE PRESENTS that we, Messers ___________________
_____________________________________________________ (hereinafter called “the Contractor” which expression
shall, where the context so admits, include their heirs, executors, administrators and legal representatives, successors
and permitted assigns) are hereby held and firmly bind unto the Gujarat Energy Transmission Corporation Ltd
(hereinafter called “the GETCO” which expression shall, where the context so admits, include its successors and
assigns) to refund the full amount of steel cement and other materials supplied by the GETCO under the terms and
conditions of A/T No. _________________ ________________________________________ dated
________________ against any loss damage or deterioration of whatsoever nature occurs to said materials supplied by
the GETCO and which are in the custody of the contractor at their works site, on behalf of the GETCO, at
____________ (name of line) _______________ and / or if any of the said materials, when inspected by any officer
authorised by the GETCO in this behalf, is found to be damaged, lost, deteriorated in quality or quantity, the contractor
hereby agrees to bind himself to indemnity and at all times keep indemnified the GETCO against all loss, damage and
deterioration to the cement, steel or any material supplied by the GETCO during his custody and shall pay in cash on
demand from the GETCO within 30 days the market value of such materials which is lost, damaged or deteriorated in
full to the GETCO and shall also hereby authorize the GETCO to deduct the said sum from any sum due to the
contractor or any sum which may at any time become due to the contractor under the above referred contract or any
other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and preservation
of the said materials against all risks, excluding war risks and against loss, damage and deterioration of whatsoever
nature in respect of the said materials while it remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorised by the GETCO.
Now the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to the
GETCO in the event of loss, damage or deterioration or whatsoever except due to circumstances arising out of war in
respect of the materials supplied by the GETCO and shall fully and effectually indemnify and keep indemnified to the
GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorised by the GETCO
and produce at anytime when demanded.
THE WITNESS WHERE OF : We the
Said M/S ________________________
(Signature of contractor)
(Seal of Firm)
hereto signed at ___________________
this day _________________________
In the presence of
address ______________ (Signature)
address ______________ (Signature)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PART – C
SCHEDULE -
MATERIAL ACCOUNT
(STATEMENT TO BE ATTACHED WITH MONTHLY RUNNING ACCOUNT BILLS)
1) Statement giving item wise details of monthly receipt of line material from GETCO and
consumption for erection of Substation for the Month of _____________________.
2) A/T No. & Date: __________________________________________________.
3) Name of Line: ____________________________________________________
Sr. Items Prov. Receipt of Material Consumption of Actual Balance
No. Requ- from GETCO Material in Line wastage quantity of
irmen material in
Qty. Qty. Qty. Qty. Qty. Qty.
rcvd. rcvd. rcvd. utili utilis utilis
Upto This Till sed ed ed
last month this upto this till
month month last month this
month month
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering Company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Format for LOI Letter of Acceptance
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bharuch
Bharuch –392012
Sub: Latter of acceptance of LOI
Ref: AT/LOI No: _____________________________________, dated _________
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender
for the “Work of replacement of rusted tower locations of 132kV D/C Achhalia-Ankleshwar Line
on Loc. No. 110-126 & replacement of conductor proposed under R&M Plan 2026-27 under
Asset Management Division Zagadia...” We hereby further agree to all the terms and conditions
mentioned in the tender, LOI and A/T unconditionally.
Thanking You,
Yours faithfully,
(Authorized Signature)
Designation _________________
(Official Stamp)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-140Tender Bharuch.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].