Loading…
Loading…
Tender Value
₹79.1 L
EMD Value
₹80,000
Closing Date
22 Jul 2026, 6:00 pmClosed
Executive Engineer, N. P. Canal Division No. 8 Dholka
Jungle Cutting, Cleaning of the Inner & Outer Canal Land Width of Dholka Branch Canal, Rajpura Sub Branch and Koth Sub Branch Canal & their Distributaries.
320069
3/2026-2027
Open
Miscellaneous Works
Works
Ahmedabad
7 documents required · 6 mandatory · 1 optional
₹2,832
Executive Engineer, NPC Dn No 8, Dholka
₹80,000
2 Jul 2026
2 Jul 2026
2 Jul 2026
22 Jul 2026
2 Jul 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, N.P.C. Dn. No. 8, Dholka.
Description Qty Unit Rate
Item Jungle clearance of specified 4515049.2 Sq. m 1.2
No. category and bushes for
1 canal/dam work as directed
with depositing material etc
complete. (Excluding tree of
girth above 0.5 mt.)
(A) Upto 2 year old
(a) For light dence
Item Clearing the shrubs like Akadas, 128.881 KM 8875.00
No. weeds, and other vegetation incl.
2(a) depositing the same outside and
burning etc. complete from
canal bed and both side slopes
and uoto outer toe of the bank
(A) Above 0.56 to 7.0 cumecs
Item Clearing the shrubs like Akadas, 114.093 KM 11833.00
No. weeds, and other vegetation incl.
2 depositing the same outside and
(b) burning etc. complete from
canal bed and both side slopes
and uoto outer toe of the bank.
(A) Above 7.0 cumecs
I/We am/are willing to carry out the work at… %above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out asunder.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
1 The Contractor shall exhibit aboard with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per Nigam circular no. નં.સસનનીલી/ જ
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP DBC juggle cutting.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .