Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-AOC 0 MANPUR CHITBARAGAON CHITBARAGAON BALLIA UTTAR PRADESH 221713 | BALLIA | UTTAR PRADESH | 221713 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹25.1 L+₹98,800 (4.09%)Rejected-Finance | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹25.5 L+₹1.3 L (5.52%)Rejected-Finance | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹25.7 L+₹1.6 L (6.56%)Rejected-Finance H NO 309 REHARI COLONY JAMMU DISTT JAMMU J K 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹29.4 L+₹5.2 L (21.7%)Rejected-Finance | L5 | Rejected-Finance Being other than L1 |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
14 Dec 2020, 6:00 pmClosed
GE 862 EWS
GE 862 EWS PIN-913862 c/o 56 APO
21OUTSOURCING SERVICES FOR OPERATION OF DG SET INSTALLATIONS (SECURITY LIGHT) ZONE A AT RAJOURI UNDER GE 862 EWS
2020_MES_392940_2
GER-55/2020-21
Open Tender
Civil Works
Item Rate
334 days
GE 862 EWS
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE 862 EWS
₹56,000
Yes
1 Jan 2021
1 Dec 2020
16 Dec 2020
1 Dec 2020
14 Dec 2020
1 Dec 2020
Amount
Total Amount of Sch 'A' for out sourcing of following installations:-
Outsourcing services for operation of WEU Power House with in power house complex for security lights during night in two shifts (1600 hrs to 0800 hrs) including sunday and holiday, (each shift of eight hrs and tradesmen must report half an hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift for operation and maintenance of following :- (i) DG set 50KVA cap :- 01 No including daily maintenance of DG set and other connected equipments such as batteries etc.The rate quoted should include the cost of labour for daily maintainence of DG set and equipment. ii) Timely switching ON & OFF of security lights (iii) Watering to earthing pits, earth resistances testing, when required. (iv) Cleaning of complete fenced area of Sub Station. (v) Tools for FGM shall be arranged by the Contractor. (vi) To maintain daily log sheets of DG set in proper log sheets provided by the Contractor. (vii) Filling of POL in the DG set and in other equipment and including greasing required. (viii) Placing of demand for POL under Sch 'B' including drawing and transporting POL from E/M POL store of the area to the site. (Total tradesmen for this item per day = FGM (Semi Skilled)- 2 Nos
Outsourcing services for operation of Div security light Power House with in Div complex for security lights during night in two shifts (1600 hrs to 0800 hrs) including sunday and holidays, (each shift of 8 hrs and tradesmen must report half an hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift for operation and maintenance of following :- (i) DG set 63KVA cap :- 01 No including daily maintenance of DG set and other connected equipments such as batteries etc.The rate quoted should include the cost of labour for daily maintenance of DG set and equipment. (ii) Timely switching ON & OFF of security lights (iii) watering to earthing pits, earth resistances testing, when required. (iv) Cleaning of complete fenced area of Sub Station. (v) Tools for FGM shall be arranged by the Contractor. (vi) To maintain daily log sheets of DG set in proper log sheets provided by the Contractor. vii) Filling of POL in the DG set and in other equipment and including greasing as required. (viii) Placing of demand for POL under Sch 'B' including drawing and transporting POL from E/M POL store of the area to the site. (Total tradesmenfor this item per day = FGM (Semi Skilled)- 2 Nos
Outsourcing services for operation of Perimeter lights TA Regt for security lights during night in two shifts (1600 hrs to 0800 hrs) including sunday and holidays, (each shift of 8 hrs and tradesmen must report half an hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift for operation and maintenance of following :- i) DG set 63 KVA cap :- 01 No including daily maintenance of DG set and other connected equipments such as batteries etc.The rate quoted should include the cost of labour for daily maintenance of DG set and equipment. ii) Timely switching ON & OFF of security lights iii) watering to earthing pits, earth resistances testing, when required. iv) Cleaning of complete fenced area of Sub Station. v) Tools for FGM shall be arranged by the Contractor. vi) To maintain daily log sheets of DG set shall be maintained properly in proper log sheets provided by the Contractor. vii) Filling of POL in the DG set and in other equipment and including greasing as required. (viii) Placing of demand for POL under Sch 'B' including drawing and transporting POL from E/M POL store of the area to the site. (Total tradesmen for this item per day = FGM (Semi Skilled)- 2 Nos.
Outsourcing services to assist for operation of Perimeter lights Engr Regt for security lights during night in two shifts (1600 hrs to 0800 hrs) including sunday and holidays, (each shift of 8 hrs and tradesmen must report half and hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift for operation and maintenance of following:- i) DG set 25 KVA cap :- 01 No including daily maintenance of DG set and other connected equipments such as batteries etc.The rate quoted should include the cost of labour for daily maintenance of DG set and equipment. ii) Timely switching ON & OFF of security lights iii) watering to earthing pits, earth resistances testing, when required. iv) Cleaning of complete fenced area of Sub Station. v) Tools for FGM shall be arranged by the Contractor. vi) To maintain daily log sheets of DG set shall be maintained properly in proper log sheets provided by the Contractor. vii) Filling of POL in the DG set and in other equipment and including greasing as required. (viii) Placing of demand for POL under Sch 'B' including drawing and transporting POL from E/M POL store of the area to the site. (Total tradesmen for this item per day = FGM (Semi Skilled)- 2 Nos.
Outsourcing services for operation of 252 AP Power House with in 252 AP complex for security lights during night in Two shifts (1600hrs to 0800hrs) (including sunday & holiday), (each shift of 8 hrs and trademan must report half an hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift to assist for maintenance and operation of following installation :- a) DG set 63 KVA cap :- 01 No including daily maintenance of DG sets and other connected equipments such as batteries etc. The rate quoted should include the cost of labour for daily maintenance of DG set and equipment. b) Timely switching ON & OFF of security lights c) Watering to earthing pits, earth resistances testing, when required. d) Cleaning of complete fenced area of Sub Station. e) Tools for FGM shall be arranged by the Contractor. f) To maintain daily log sheets of DG sets in proper log sheets provided by the Contractor. (g) Filling of POL in the DG set and in other equipments including greasing as required. (h) Placing of demand for POL. Drawing and transporting POL from E/M POL store of the area. (Total trademen to be employed in this item per day = FGM (Semi Skilled)- 02 Nos)
Outsourcing services for operation of 445 FPD Power House with in 445 FPD complex for DG set installation for two shifts (0600hrs to 2200hrs) (including Sunday and holidays) (each shift of eight hrs and tradesmen must report half an hour earlier at the change of shift) by employing one FGM (Semi Skilled) in each shift for operation and maintenance of following:- a) DG set 63 KVA cap :- 01 No including daily maintenance of DG sets and other connected equipments such as batteries etc. The rate quoted should include the cost of labour for daily maintenance of DG set and equipment. b) Timely operating change over switch. c) Watering to earthing pits, earth resistances testing, when required. d) Cleaning of complete fenced area of Sub Station. e) Tools for FGM shall be arranged by the Contractor. f) To Maintain daily log sheets of DG sets in proper log sheets provided by the Contractor. g) Filling of POL in the DG set and in other equipments including greasing as required. h) Placing of demand for POL. Drawing and transporting POL from E/M POL store of the area. (Total trademen to be employed for this item per day = FGM (Semi Skilled)- 02 Nos.
NOTE:- (a) The Lump sum estimated cost mentioned above is based on the current minimum fair wages pronounced vide GOI, Ministry of Labour and Employment office of the CLC(C) New Delhi vide their No F.No.1/20(3)/2020-LS-II dated 12 Oct 2020 effective wef from 01.10.2020 and do not includes insurance, EPF and GST. (b) However contractor shall be responsible for compliance of all statutory provisions relating to minimum wage rates, labour laws/acts and insurance, rules/ regulations framed by Govt time to time in respect of the persons employed by him. (c) The tenderer shall work out his lump sum amount which includes all applicables taxes, EPF, Insurance, GST, all other expenditure such as stationary, uniform, shoes, safety equipment, releiver etc and anticipated increase of wages during the currency of the contract. Nothing extra shall be admissible on this account. (d) In case the payment made by the contractor is less than the minimum wages to the labourer, no payment shall be admissible to the contractor. (e) The contractor shall produce documentary evidence in support of salary disbursed to their employed trademen for the subject work alongwith documentary evidence of EPF deposited in favour of employed labourer, failing which no payments shall also be admissibe to the contractor and contractor shall be liable to pay the penality of applicable EPF. (f) The payment of salary to the staff employed shall be made by the contractor within 1st week of each month but not later than 7th day of each month, failing which one percent of quoted amount penalty per week subject to maximum of 10 percent for delay in payment to their employed trademen shall be liable to be paid by the contractor. (g) Items to be replaced shall be obtained by the staff from MES store yard and unserviceable material shall be deposited in the store yard. (h) POL required for operation and maintenance shall be issued under Sch 'B' free for filling and contractor shall draw and transport the POL from MES store to the work site at his own arrangement. (j) No claim what so ever on account of delay in payment of RAR due to the default of contractor shall be admissible at later stage. (k) Contractor is responsible for taking shut down of electricity before repair/replacement of electric equipments/services and no claim what so ever on this account for any kind of miss happening/damages shall be entertained.
KRISHNA ENGINEERING ENTERPRISES
Skyline Encon
M/S A K ENGINEERS & CO.
shivom builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .