Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC Retendered work Lowest quoted amount single tender |
| Sl No | Description | Qty | Unit | THOMAS VARGHESE K L1 |
|---|---|---|---|---|
| 1.00Working Charges | ||||
| 1.00 | OD1895/2026-2027:Leak rectification work in 32 -50 mm PVC (Class 2 to 6) pipe line/fixing 25/32/40mm GM wheel valve in line including detecting and locating leak,
earth
work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete
cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages
to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position
aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or
or any available joint and testing the pipe line by operating the valves concerned, and rectifying the
defects if noticed and without causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance
of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic
controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC
specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All
Socketed Jointing. | 20 | no | 1,511.08 ₹30,221.6 Lowest |
| 1.00 | OD1913/2026-2027:Leak rectification work in 63-90 mm PVC (Class 2 to 6) pipe line/fixing 50/65/80 mm GM valve fixing/ including detecting and
locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete
cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damagesto the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipe line by operating the valves concerned, and rectifying the
defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance
of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic
controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC
specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All
Socketed Jointing. | 60 | Leak | 2,023.2 ₹1,21,392 Lowest |
| 1.00 | OD1890/2026-2027: :Leak rectification work in 110 -140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages
to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing
caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of
Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC
Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing. | 15 | Leak | 3,100.4 ₹46,506 Lowest |
| 1.00 | 100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. | 15 | no | 3,788.3 ₹56,824.5 Lowest |
| 1.00 | OD1905/2026-2027:Rectification of minor joint leakages in exposed portions 80/100/ 125 mm CI /DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | 2 | no | 1,105.12 ₹2,210.24 Lowest |
| 1.01 | OD1911/2026-2027:Rectification of minor joint leakages in exposed 150/200/250 mm CI /DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | 2 | no | 1,809.61 ₹3,619.22 Lowest |
| 1.01 | OD1915/2026-2027:Rectification of joint leakages in exposed 300/350 mm CI/DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | 10 | no | 2,587.29 ₹25,872.9 Lowest |
| 1.01 | OD1922/2026-2027:Rectification of joint leakages in 80- 100 mm CI /DI Pipe including earth work excavation in all
kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line
and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and
providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects
noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating
each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any
other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching,
ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of
departmental officers etc. complete, but excluding the cost of pig lead. | 2 | Leak | 3,480.5 ₹6,961 Lowest |
| 1.01 | OD1897/2026-2027:Rectification of joint leakages in 125- 150 mm CI /DI Pipe including earth work excavation in all
kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line
and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects
noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating
each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any
other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching,
ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of
departmental officers etc. complete, but excluding the cost of pig lead. | 2 | Leak | 4,191.68 ₹8,383.36 Lowest |
Tender Value
₹7.0 L
EMD Value
₹17,582
Closing Date
22 Jul 2026, 6:00 pmClosed
Assistant Executive Engineer
Kerala Water Authority PH Sub.Division Ranni
O M Water Supply Schemes Annual Mace 2026 27 RWSS to Vechoochira Kollamula and Kurumbanmoozhy Zone 5 Leak rectification works to pipe line for the year 2026 27 Pipeline Work
2026_KWA_860570_1
05RT-2/2026-27/AEE/PH/RANNI
Open Tender
Civil Works - Others
Item Rate
365 days
Vechoochira
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,555
₹17,582
18 Aug 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Working Charges | |||||
| 1.001 | OD1895/2026-2027:Leak rectification work in 32 -50 mm PVC (Class 2 to 6) pipe line/fixing 25/32/40mm GM wheel valve in line including detecting and locating leak,
earth
work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete
cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages
to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position
aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or
or any available joint and testing the pipe line by operating the valves concerned, and rectifying the
defects if noticed and without causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance
of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic
controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC
specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All
Socketed Jointing. | - | no | - | - |
| 1.002 | OD1913/2026-2027:Leak rectification work in 63-90 mm PVC (Class 2 to 6) pipe line/fixing 50/65/80 mm GM valve fixing/ including detecting and
locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete
cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damagesto the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipe line by operating the valves concerned, and rectifying the
defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance
of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic
controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC
specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All
Socketed Jointing. | - | Leak | - | - |
| 1.003 | OD1890/2026-2027: :Leak rectification work in 110 -140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages
to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing
caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of
Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC
Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing. | - | Leak | - | - |
| 1.004 | 100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing. | - | no | - | - |
| 1.005 | OD1905/2026-2027:Rectification of minor joint leakages in exposed portions 80/100/ 125 mm CI /DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | - | no | - | - |
| 1.006 | OD1911/2026-2027:Rectification of minor joint leakages in exposed 150/200/250 mm CI /DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | - | no | - | - |
| 1.007 | OD1915/2026-2027:Rectification of joint leakages in exposed 300/350 mm CI/DI Pipe (Excluding trenching/Tar cutting) cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. | - | no | - | - |
| 1.008 | OD1922/2026-2027:Rectification of joint leakages in 80- 100 mm CI /DI Pipe including earth work excavation in all
kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line
and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and
providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects
noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating
each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any
other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching,
ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of
departmental officers etc. complete, but excluding the cost of pig lead. | - | Leak | - | - |
| 1.009 | OD1897/2026-2027:Rectification of joint leakages in 125- 150 mm CI /DI Pipe including earth work excavation in all
kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line
and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects
noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating
each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any
other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching,
ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of
departmental officers etc. complete, but excluding the cost of pig lead. | - | Leak | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 0.06 MB
Tendernotice_3.pdf
PDF • 1.66 MB
Tendernotice_4.pdf
PDF • 0.05 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.05 MB
BOQ_1455255.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].