| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.3 LAccepted-AOC | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹35.5 L+₹4.3 L (13.6%)Rejected-Finance K BLOCK 202 AAROGYAM RESIDENTS WALFARE ASSOCIATION OPP CRYSTAL WORLD N H 58 P O PATANJALI YOGPEETH HARIDWAR | L-2 | Rejected-Finance PRICE QUOTED HIGH | |
| 3 | Rejected-Technical MOHALLA CHAKALAN JAWALAPUR HARIDWAR DISTRICT HARIDWAR | - | Rejected-Technical TECHNICALLY DISQUALIFIED | |
| 4 | Rejected-Technical | - | Rejected-Technical TECHNICALLY DISQUALIFIED | |
| 5 | Rejected-Technical | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
21 Dec 2020, 5:00 pmClosed
EE IRRIGATION DIVISION DEHRADUN
OFFICE OF EXECUTIVE ENGINEER IRRIGATION DIVISION DEHRADUN
Installation of Safety Chain Pillar and Renovation of Damaged Red stone at Triveni Ghat, Rishikesh under Kumbh Mela-2021 (Triveni Ghat towards Ganga Sabha Ch(100.00 to 900.00) Mtr.)
2020_IRDCE_27969_1
03/EE/2020-21 DATED 04.12.2020
Open Tender
Civil Works
Item Rate
45 days
RISHIKESH IN DISTRICT DEHRADUN
AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹2,950
EXECUTIVE ENGINEER IRRIGATION DIVISION DEHRADUN
₹75,000
IRRIGATION DIVISION DEHRADUN
28 Jul 2023
7 Dec 2020
24 Dec 2020
7 Dec 2020
21 Dec 2020
11 Dec 2020
9 Dec 2020
Amount
(Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Cement Concrete SOR 2-4-1-1-B
Providing concrete for plain/ reinforced Nominal mix (1:2:4) concrete in open foundations complete as per drawings and technical specifications SOR 11-4-3-1
(Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Mechanical Means (Depth upto 3 m) SOR 3-13-1-B
40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar Red sand stone DSR 11.30.1
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR 10.2
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coat DSR 13.61.1
SUSHEEL CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .