| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L1 | Accepted-Finance L1 | |
| 2 | L2₹6.9 L+₹12,711 (1.86%)Rejected-Finance VILLAGE PO GOLI TEHSIL DALHOUSIE DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.3 L+₹43,134 (6.32%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | L3 | Rejected-Finance L3 | |
| 4 | L4₹7.5 L+₹72,031 (10.6%)Rejected-Finance VILL GALYAN PO GHUMARWIN TEHSIL GHUMARWIN DISTT BILASPUR HP 174021 | BILASPUR | HIMACHAL PRADESH | 174021 | L4 | Rejected-Finance L4 | |
| 5 | L5₹7.9 L+₹1.1 L (15.5%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | L5 | Rejected-Finance L5 |
Tender Value
₹8.5 L
EMD Value
₹20,000
Closing Date
25 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Restoration of rain damages on NH to Sanour Fatoh SH Providing and laying Cement concrete pavement at Rd 0/070 to 0/291.50 Under SDRF/NDRF
2026_PWD_143652_7
6450-56 dt. 16/9/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
10 documents required · 10 mandatory
₹350
₹20,000
12 Oct 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
18 Sept 2026 - 25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m (one point five metre) in width as well as 10 sqm (ten square metre)on plan including getting out and disposal of excavated earth upto 50 m (fifty metre) and lift upto 1.5 m (one point five metre), as directed by Engineer-in- Charge: all kind of soil . The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 660 | Per square metre | 80.51 | ₹53,136.6 |
| 2 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I size range 75 mm to 0.075 mm (seventy five to zero point zero seven five millimetre) having CBR Value-30 (thirty) as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 103 | Per cubic metre | 1,694.7 | ₹1,74,554.1 |
| 3 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5:3(One cement is to one point five coarse sand is to three graded stone aggregate 20 mm (twenty milimetre) nominal size as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 103 | Per cubic metre | 6,016.95 | ₹6,19,745.85 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
sbd7.pdf
Tender Documents • 6.18 MB
BOQ_213485.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .