Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC TECHNO-COMMERCIALLY ACCEPTED | |
| 2 | Rejected-Technical BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED | |
| 3 | Rejected-Technical BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED |
Tender Value
₹3.0 L
EMD Value
₹3,700
Closing Date
23 Feb 2024, 10:00 amClosed
SHUBHAM DAS
Kedla Washery, Hazaribagh Area, CCL
Replacement of conv. belt of unit no.415,247,227,307 belt conveyor along with repairing and fitting of 130 troughing idler frame with idler and dismantling, repairing, fabrication,erection of diffrnt type troughing,self-alignment of idlers of 304conv
2024_CCL_301144_1
PO/KW/eTender/23-24/111, dated 11.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
12 days
Kedla Washery
As per NIT
2 documents required · 2 mandatory
₹3,700
6 May 2024
12 Feb 2024
24 Feb 2024
13 Feb 2024
23 Feb 2024
13 Feb 2024
13 Feb 2024 - 17 Feb 2024
Amount
Replacement of conv. belt of unit no. 415, 247, 227 and 307 belt conveyor along with repairing and fitting of 130 toughing idler frame with idler. Shifting of new conv. belt at site, repaired frame with idler, old conv. belt and old frame to scrap yard.
Dismantling of old conveyor belt 60% of new (4.343MT).=2.605MT and damaged troughing idler frame 80% of new (6.998MT)=5.598+2.605=8.203MT
Installation of new conveyor belt and re-installation after repaired frame with idlers.-(4.343+6.998)=11.341MT
Dismantling, repairing, fabrication & erection of different type toughing self-alignment of old & damaged frame with idler of unit no. 304B/Conv. Dismantling of Idler (Top & bottom)
Dismantlilng of old & damaged idler frame 70% of new(7.020MT)
Shifting of old & damaged for repairing and Shifting of repaired idler frame at site for fitting. (4.914+7.020)=11.934 MT
Fabrication & erection and fitting of idler frame (T&B).
Installation & alignment of idler. (T&B)
Total impact of GST for the purpose of CTC
A.K. ENTERPRISES
TRIBHUWAN ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .