| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 CrAccepted-Finance PADAM PUR COLONY LINK ROAD PITHORAGARH UTTARAKHAND | ₹9.3 Cr | L1 | Accepted-Finance RESPONSIVE |
| 2 | L2₹9.4 CrRejected-Finance | ₹9.4 Cr | L2 | Rejected-Finance NON RESPONSIVE |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | K M Engineering and Construction L1 | Rajendra Singh Chuphal L2 |
|---|---|---|---|---|---|
| 1.00HILL SIDE CUTTING | |||||
| 2.00 | Earth work in hill road (hill side cutting/ filling):- Earth work in Hill Road (Hill side cutting): Excavation in hilly area for Construction of road in all types of Soils, Rocks and E&B ect. As met at site, true to lines as per Pland, L-Section, Cross Slope, Super Elevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all Lifts & Leads required for safe disposal of surplus excavated material at suitable dumping places indicated in Drawings by mechanical means/manual means without otherwise damaging the Forest, Forest Land, Utilities, Private and Public Properties, including Slip clearance till the completion of the work. | 1 | LS | 38,00,000 ₹44,84,000 Lowest | 38,37,568 ₹45,28,330.24 |
| 3.00 | Removal of land slides (Slip clearance) in all type of soil and rock by mechanical means/ manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications , Clause 1611 . (Slip clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge ) | 3,413.24 | Cum | 68 ₹2,73,878.38 Lowest | 68 ₹2,73,878.38 Lowest |
| 4.00 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause 302.3.11 | 17,500 | Cum | 52 ₹10,73,800 Lowest | 52 ₹10,73,800 Lowest |
| 5.00PROTECTOIN WORK | |||||
| 6.00 | Excavation for Structures:- Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305. | 1,730.7 | Cum | 395 ₹8,06,679.27 Lowest | 397 ₹8,10,763.72 |
| 7.00 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | 938.47 | Cum | 4,360 ₹48,28,240.46 Lowest | 4,360 ₹48,28,240.46 Lowest |
| 8.00 | Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge. | 2,170.91 | Cum | 2,240 ₹57,38,149.31 Lowest | 2,240 ₹57,38,149.31 Lowest |
| 9.00 | HP stone filling:- Hand Packed stone fillingin back of wallls including cost of all materials, royality,T&Petc.complete as per direction of Engineer-in-charge. (Asper PWD Uttarakhand specifications) | 528.15 | Cum | 1,000 ₹6,23,217 Lowest | 1,034 ₹6,44,406.38 |
| 10.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 216 | Cum | 4,020 ₹10,24,617.6 Lowest | 4,024 ₹10,25,637.12 |
Tender Value
₹9.6 Cr
EMD Value
₹19.2 L
Closing Date
4 Jul 2026, 1:00 pmClosed
Zonal Manager
PLOT NO. 56/1 LANE C-11, TURNER ROAD, DEHRADUN (UTTARAKHAND)
L042-Duwadhar to Syud Motor Road, Stage-I and II
2026_CCUK_148228_1
UT11473-04
National Competitive Bid
Civil Works - Roads
Item Rate
450 days
NARENDRA NAGAR
As per technical bid
3 documents required · 3 mandatory
₹5,900
₹19.2 L
DEHRADUN
20 Aug 2026
11 Jun 2026
4 Jul 2026
11 Jun 2026
4 Jul 2026
11 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HILL SIDE CUTTING | - | - | - | - |
| 2 | Earth work in hill road (hill side cutting/ filling):- Earth work in Hill Road (Hill side cutting): Excavation in hilly area for Construction of road in all types of Soils, Rocks and E&B ect. As met at site, true to lines as per Pland, L-Section, Cross Slope, Super Elevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all Lifts & Leads required for safe disposal of surplus excavated material at suitable dumping places indicated in Drawings by mechanical means/manual means without otherwise damaging the Forest, Forest Land, Utilities, Private and Public Properties, including Slip clearance till the completion of the work. | - | LS | 38,37,568.29 | - |
| 3 | Removal of land slides (Slip clearance) in all type of soil and rock by mechanical means/ manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications , Clause 1611 . (Slip clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge ) | 1 | Cum | 68.3 | ₹68.23 |
| 4 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause 302.3.11 | - | Cum | 52.8 | - |
| 5 | PROTECTOIN WORK | - | - | - | - |
| 6 | Excavation for Structures:- Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD specification clause 305. | - | Cum | 397 | - |
| 7 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | - | Cum | 4,360.9 | - |
| 8 | Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge. | 1 | Cum | 2,240.1 | ₹2,237.86 |
| 9 | HP stone filling:- Hand Packed stone fillingin back of wallls including cost of all materials, royality,T&Petc.complete as per direction of Engineer-in-charge. (Asper PWD Uttarakhand specifications) | 1 | Cum | 1,034.2 | ₹1,033.17 |
| 10 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | - | Cum | 4,024.6 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
duwadharsyud.pdf
Additional Documents • 7.12 MB
sbdduwadhar.pdf
Tender Documents • 5.12 MB
BOQ_232018.xls
BOQ • 0.32 MB
datecorrigendumtwo.pdf
PDF • 0.26 MB
datecorrigendum.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].