| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹3.5 Cr Quoted ₹3.7 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹4.0 Cr+₹28.6 L (7.71%)Rejected-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹4.0 Cr+₹28.6 L (7.71%) | L2 | Rejected-AOC Second Lowest |
Tender Value
Refer Docs
EMD Value
₹7.4 L
Closing Date
12 Nov 2024, 2:00 pmClosed
SE Irrigation Works Circle Varanasi
SE Irrigation Works Circle Sigra Varanasi
Renovation of Earthen Section, Pucca Works and Demarcation of Barhwal Dy. Offtaking From Left Bank of N.P.C. at Km. 30.250
2024_UPIDC_964703_3
04/SE/2024-25
Open Tender
Civil Works
Item Rate
120 days
Village Shahpur, Post Narayanpur, Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.4 L
24 Dec 2024
7 Nov 2024
12 Nov 2024
7 Nov 2024
12 Nov 2024
7 Nov 2024
Amount
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60 M.
Dismantling brick work in cement mortor including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60 M.
Earth work in foundation in all type of soil mixed with charry,karail , black cottan soil or moorum including all lead & lifts T&P and disposal of surplus earth as direction of Engineer-in-charge up to a distance of 100m from the foundation trenches for proper complation of work.
P/L C.C. 1:3:6 in foundation with one part of cement , three part of coarse sand and six part of stone ballast 20 to 40 mm size including cost of all materials labour, T&P etc required for proper completion of work.
First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.
Centering and shuttering for R.C.C. and C.C. work including cost of all materials labour, T&P etc required for proper completion of work .
Bending, Binding, Cutting and placing in position steel reinforecement including cost of all materials labour, T&P etc required for proper completion of work.
P/L R.C.C. 1:1.5:3 with one part of cement , one& half part of coarse sand and three part of hard stone grit 4.75 to 20 mm size including cost of all materials labour, T&P etc required for proper completion of work.
P/L C.C. 1:1.5:3 with one part of cement , one & half part of coarse sand and three part of hard stone grit 4.75 to 20 mm size including cost of all materials labour, T&P etc required for proper completion of work.
Struck Deep pointing in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials labour, T&P etc required for proper completion of work.
P/F wheel gaurd stone as per direction of engineer in-charge including cost of all materials labour, T&P etc required for proper completion of work.
Finishing walls with water proofing cement paints of approved make such as super snoweem. Durrocem robiceem, guttueem supreme, quality and of required shed on new wall surface two coat over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered material including curing and cost of all material.
Fabrication and supply sign board on angle iron framd 40 x 40 x 6 mm. 25 x 5 mm. flat iron board sand 16 SWG M.S. Sheet of board size 1200x900 mm including two coat of iron work approved synthetic enamel paint and lettering,fixing of sign board at canal head by c.c. 1:4:8 including cost of all material, labour, T&P etc. required as per directed by Engineer in charge as per approved drawing inclosed.
Renovation of steel gate by taking out rusted &damaged leaf with channel and providing outer channel,spendle rod,inner channel check nut and mild steel leaf with other accesseries as per requered including cost of all material, labour, T & P etc. required for proper completion of work .
P/L LDPE film on footing box including cost of all materials labour, T&P etc required for proper completion of work.
P/Fixing Precast RCC Boundary Pillar(250 x250 x900 mm) including cost of all materials labour, T&P etc required for proper completion of work.
Providing & Fixing 150 mm outlets including earth work and labour charges for fixing collars and making joints water tight.
First class brick pitching on edge over road ramp, filling joint with local sand including all cost of materials, labour, T&P etc complete required for proper completion of work.
Earth Work in filling in canal by manual labour with all lead and lift in all type of soil with disposal as directed by site in charge.
Earth Work in filling in canal by manual labour with all lead and lift in all type of soil with disposal as directed by site in charge.
Earth work in strengthening of bank & correcting section of canal , road diversion and ramp etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .
Earth work in strengthening of internal section by manual labour with filling E.C. bag with earth sewing with sutli and placing in proper position including cost of all material, labourT & P etc. for proper completion of work .
ARVIND KUMAR SINGH (BID ID -4714171)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .