| 1 | 1₹23.8 LAccepted-AOC F 48 ATGA BAGH LANE GARDEN REACH ROAD KOLKATA WEST BENGAL 700024 UDYAM WB 10 0015231 19AACCT2167N1ZV R M | KOLKATA | WEST BENGAL | 700024 | 1 | Accepted-AOC Bid satisfies all tender qualification criteria. | |
| 2 | 2₹51.9 L+₹28.1 L (118.0%)Accepted-AOC NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | 2 | Accepted-AOC Bid satisfies all tender qualification criteria. |
Tender Value
Refer Docs
Closing Date
24 Aug 2024, 2:00 pmClosed
DGM (SRM)
Ship Repair Cochin Shipyard Ltd P O Perumanoor Kerala
BOILER SYSTEM REPAIR JOB FOR THE VESSEL MV SWARAJ DWEEP AT CKSRU, KOLKATA
2024_CSL_202923_2
KP1/Boiler System Job/ MV Swaraj Dweep/CKSRU
Open Tender
Marine Services
Turn-key
40 days
CKSRU KOLKATA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
10 Oct 2024
19 Aug 2024
26 Aug 2024
19 Aug 2024
24 Aug 2024
19 Aug 2024
19 Aug 2024 - 22 Aug 2024
Boiler Pipeline ** All Material contractor supply
Port boiler feed line to hot well corroded. Same to be crop and renew. Old flanges to use. Material: MS Sch-40 Pipe dia=35mm
STBD boiler feed line to hot well corroded. Same to be crop and renew. Old flanges to use. Material: MS Sch-40. Pipe dia=35mm
Renewal of Bends
The pipeline from the technical pump to the hot well corroded. Same to be crop and renew. Old flanges to use. Material: MS Sch-40 Pipe dia=42mm
Renewal of Bends
The Aux port boiler feed pump discharge line corroded. Same to be crop and renew. Old flanges to use. Material Sch-40 Pipe dia=42mm
Renewal of Bends
Steam return line to hot well corroded. Same to be renew. Material: MS Sch 40 OD=50mm
Renewal of Bends
Boiler circulating pump lines corroded. Same to be renewed. Material: MS Sch40 Pipe OD=62MM
Renewal of Bends
Boiler circulating pump lines corroded same to renew. Material: GI Sch 40 pipe dia 80mm
Renewal of lagging
Boiler blow down pipe port boiler. Material: MS Sch 40 pipe dia 32NB
Renewal of lagging
Boiler blows down pipe starboard boiler. Material: MS Sch 40 pipe dia 32NB
Renewal of lagging
Port and starboard Exhaust boiler safety valve inlet and outllet pipeline found corroded pipe Material: MS Sch 40 pipe dia 32NB
Renewal of lagging
Boiler blows down connecting pipe to blow down cock pipe. Material: MS Sch 40 pipe dia 25NB
Renewal of lagging
Steam pipelines flange at various places flange found corroded same to fabricate as per sample and fit back. Pipeline removal and Refitment, insulation renewal under contractor scope.
Removal and Re-Fitment of Pipes 50NB
Removal/Renewal of insulation of pipe
Renewal of sch 40 MS flange 50NB
AUXILIARY BOILER - PORT & STBD Maker: AALBORG MARINE BOILERS Type-Oil Fired Water Tube Boiler AQ-12, STEAM OUTPUT- 1600 KG/HR, MAX WORKING PR: 7 KG / CM2. ** All material contractor supply
Port & Stbd boiler control panel door hinge broken. Same to repair.
Both boilers to dismantle completely and clean both water side and smoke side thoroughly with high pressure jet.
For the above two auxiliary boilers the following mountings to open up, o'haul, present for survey and box back with new joints and packings, studs, bolts and nuts to renew. Damaged glands/bushes/ spindles to renew as per surveyors' recommendations. ** All material contractor supply
safety valves 48 mm
Renewal of Bushes
Renewal of Spindles
Main steam stop valves 100 mm
Renewal of Bushes
Renewal of Spindles
Scum blow down valve 48 mm
Renewal of Bushes
Renewal of Spindles
vent cock 20 mm
cocks for pressure switches 20 mm
feed check v/v 48 mm
Renewal of Bushes
Renewal of Spindles
gauge glass 37 mm
sampling v/v 20 mm
Renewal of Bushes
Renewal of Spindles
mud drain v/v 48 mm
bottom blow down v/v 48 mm
Renewal of Bushes
Renewal of Spindles
Circulation water v/v 55 mm
Renewal of Bushes
Renewal of Spindles
Float chamber (low/high water) 35 mm
Float chamber ( low water cut out) 35 mm
Man hole doors
Mud hole doors
Easing gear operation to check and show to surveyor. Safety valves lifting and adjustments to carry out and show to surveyor.
Smoke side and water side to clean for soot and scales by high pressure water jet and chemical cleaning to to be done.
Burner and burning equipment to be opened for o'hauling by specialist technician and necessary adjustments to carry out.
EXHAUST GAS BOILER AALBORG-AV-9) - PORT & STBD Maker:-AALBORG, MARINE BOILERS Type;-AV-9, Steam out put 361kg/h, Normal working pressure=7 bar; Hydrostatic pressure-13.5bar.
All below mountings to open, o'haul, and present for survey, mountings to fit back with new joints and packings etc. ** All material contractor supply
A) safety valves 48 mm
B) circulating v/v inlet 48 mm
C) circulating steam/water out v/v 48 mm
D) Drain v/v 40 mm
E) Vent cock
Smoke side to clean with high pressure water jet necessary arrangement to make for collecting the drained water and disposal from engine room.
Boiler to test hydraulically to 10 kg/cm2 and show to surveyor
Two nos inspection doors to open and fit back with new joints.
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .