| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.3 LAccepted-AOC | 1 | Accepted-AOC L1 ACCEPTED | |
| 2 | 2₹19.7 L+₹40,314.56 (2.09%)Rejected-Finance KOLLAYIL KERALA | IDUKKI | KERALA | 685533 | 2 | Rejected-Finance Being L2 rejected |
Tender Value
Refer Docs
EMD Value
₹46,614
Closing Date
27 Sept 2021, 3:00 pmClosed
MANAGING DIRECTOR
KSDP LTD,KALAVOOR P.O,ALAPPZUHA
CONSTRUCTION OF BOILER PLANT BUILDING
2021_ksdp_438874_1
KSDP/PRJ/CIVIL/ COBPB/08/21-22/104
Open Tender
Civil Works - Buildings
Item Rate
60 days
KSDPLTD, KALAVOOR P.O, ALAPPZUHA
PLEASE REFER THE TENDER DOCUMENT
9 documents required · 9 mandatory
₹2,950
₹46,614
6 Jan 2022
13 Sept 2021
28 Sept 2021
13 Sept 2021
27 Sept 2021
13 Sept 2021
CONSTRUCTION OF BOILER PLANT BUILDING
Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos Sheet
Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area beyond 3 sq. Metres
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -In charge .Nominal concrete 1:4:8 leaner mix ( includingequivalent design mix)
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
solid block masonry using pre cast solid blocks ( factory made) of size 30x20x20 cm or nearest available size conforming to IS 2185 PART 1 of 1979 for foundation and plinth with 20 cm and above in CM 1:6( 1 Cement: 6 course sand) etc. including all labour charges, hire of tools and plants etc. complete as directed by officers concerned.
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for superstructure above floor two level up to floor five level 20cm and above in: CM 1:6 (1 cement : 6 coarse sand) etc.including all labour charges, Scaffolding Charges, hire of tools and plants etc. complete as directed by the officers concerned.
Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
Providing and fixing ball bearing for rolling shutters.
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:Two coats
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Providing ridges or hips width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.0.63 mm thick with zinc coating not less than 275 gm/m2
Providing and fixing 15cm wide, 45 cm overall semi circular plain G.S. sheet gutter with iron brackets 40x3 mm size, bolts, nuts and washers etc., including making necessary connections with rain water pipes complete.0.80 mm thick with zinc coating not less than 275 gm/m2
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.60 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
Structural steel work (Company free issued ISA 75 X 75 X 6MM)riveted,bolted or welded in built up sections,trusses andframed work, including cutting,hoisting,fixing in position and applying a priming
Bineesh Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .