Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹1.1 Cr+₹1.4 L (1.30%)Rejected-AOC | ₹1.1 Cr+₹1.4 L (1.30%) | L2 | Rejected-AOC SECOND LOWEST BIDDER |
| 3 | L3₹1.1 Cr+₹6.9 L (6.55%)Rejected-Finance | ₹1.1 Cr+₹6.9 L (6.55%) | L3 | Rejected-Finance 3rd lowest |
| 4 | L4₹1.2 Cr+₹18.7 L (17.7%)Rejected-Finance | ₹1.2 Cr+₹18.7 L (17.7%) | L4 | Rejected-Finance 4th lowest |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
23 Mar 2020, 4:00 pmClosed
Executive engineer
LSGD PALAKKAD MUNICIPALITY
REJUVENATION OF KOTTAMAIDANAM PHASE 2 UNDER AMRUT PROJECT
2020_LSGD_348488_1
E1-10560/2020
Open Tender
Civil Works - Others
Item Rate
180 days
Palakkad Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
online
₹50,000
Yes
16 Oct 2020
6 Mar 2020
25 Mar 2020
6 Mar 2020
23 Mar 2020
6 Mar 2020
Amount
KOTTAMAIDANAM
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.18 : Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od534220/2019_2020 : OD as per 2.1.1 - Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed at low lying areas or as per the direction of Municipal council :
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
od341051/2019_2020 : Using departmental rubble including all charges etc complete
od505326/2019_2020 : Stone work in plain ashlar in super structure in cement mortar 1:4 (1 cement : 4 coarse sand) including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment matching the stone shade:<br>One face dressed <br>Rubble square / rectangular in shape with extra texturing by chiseling
4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
od521601/2019_2020 : Item Shifted to Sub head 14 as item 14.73<br>Item Shifted to head 14 as item 14.74<br>Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.<br>In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
od534269/2019_2020 : Providing and fixing PVC pipes during construction for electrical works . 32 mm dia 6 Kgf/cm2 ( 5% wastage )
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.47.1 : Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
od341053/2019_2020 : Painting with aquasil water paint on Stone Surface including all charges etc complete.Two or More Coats on New Work
11.26.1 : Kota stone slab flooring over 20 mm ( average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand)25 mm thick
od524198/2019_2020 : Granite cobble stone paving over 20 mm ( average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand)
16.68 : Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
30.2.8 : Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).
30.2.12 : Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.
30.2.3 : Supplying and stacking sludge at site including royalty and carriage upto 5 k.m. lead complete (sludge measured in stacks will be reduced by 8% for payment).
30.2.2 : Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment).
30.2.9 : Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
30.2.33 : Providing and fixing Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and even, watering with sprinkler
V GOPI
PK BHASKARAN
M T ABDUL KABEER
Bidder Name
M T ABDUL KABEER
V GOPI
KSA CONSTRUCTION
PK BHASKARAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_488630.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .