Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.8 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹32.1 L+₹31,371.40 (0.99%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹34.8 L+₹3.0 L (9.33%)Rejected-Finance | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MUKESH SHARMA L3 | LEELA DEVI KAPATIA L2 | TUSHAR GAUTAM L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. Pick & Jumper work | 791.71 | Cum | 300 ₹2,37,513 | 350 ₹2,77,098.5 | 100 ₹79,171 Lowest |
| 2.00 | Providing and laying cement concrete 1:3:6(1cement: 3sand: 6 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth. | 7.8 | Cum | 7,000 ₹54,600 | 6,500 ₹50,700 | 6,200 ₹48,360 Lowest |
| 3.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | ||||||
| 3.01 | Foundations, footings, basis of columns & the like and mass concrete. | 9.75 | Cum | 9,000 ₹87,750 | 8,500 ₹82,875 Lowest | 9,200 ₹89,700 |
| 3.02 | Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 18.22 | Cum | 10,000 ₹1,82,200 | 10,000 ₹1,82,200 | 9,400 ₹1,71,268 Lowest |
| 3.03 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilevers up to floor two levels within all leads and lifts as per direction of Engineer-in-Charge. | 1.77 | Cum | 11,000 ₹19,426 | 10,200 ₹18,013.2 | 9,500 ₹16,777 Lowest |
| 3.04 | Arches upto floor two level. | 5.46 | Cum | 11,000 ₹60,005 | 10,200 ₹55,641 | 9,500 ₹51,822.5 Lowest |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | ||||||
| 4.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like | 145.74 | Sqm. | 350 ₹51,009 | 380 ₹55,381.2 | 250 ₹36,435 Lowest |
| 5.00Providing from work of ordinary timber planking’s so as to give a rough finish i/c centering, shuttering, strutting and propping etc. with wooden battens & ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ reinforced concrete and plain concrete work with in all leads and lifts as per the direction of the Engineer-in-charge in :- | ||||||
Tender Value
₹40.8 L
EMD Value
₹81,630
Closing Date
18 Oct 2025, 5:00 pmClosed
E.E. JSV Division Anni
E.E. JSV Division Anni
Cons of Storage Tank 100000 ltrs capacity, Laying Jointing and Testing of G.I. pipe 80 mm dia MC 3900 Rmt. with butt welding, Installation of Fire Hydrant 15 Nos. and Repair of road/Pucca path
2025_HPIPH_117278_1
6897-6941
Open Tender
Civil Works
Item Rate
365 days
Nirmand
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,500
₹81,630
21 Nov 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
18 Oct 2025
9 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
form8.pdf
Tender Documents • 1.27 MB
terms.pdf
Tender Documents • 0.48 MB
form6.pdf
Tender Documents • 0.48 MB
BOQ_171393.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .