Tender Value
₹26.3 Cr
EMD Value
₹36.3 L
Closing Date
12 Oct 2026, 10:30 am2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Hamirpur
Executive Engineer Hamirpur
SH PartI Civil work C o Building portion including work stations Water Supply and Sanitary Installation Rain Water Harvesting Tank Septic Tank Site Development including boundary wall gate Part II Electrical work SH SITC of E I LAN system Access Co
2026_PWD_144984_1
New Block for CBT Examination Hall Rajya Chayan Aayog Hamirpur
Open Tender
Civil Works
Percentage
270 days
Hamirpur
Please refer Tender documents.
13 documents required · 13 mandatory
₹30,000
EE Hamirpur
₹36.3 L
12 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete nominal concrete 1:5:10 (One cement : five sand : ten graded stone aggregate) or richer mix (including equivalent design mix) manually/ by mechanical means including disposal and transportation of the unuseful material for disposing at dumping site( to be arranged by the contractor) including entire carriage of material with in all leads and lifts and as per the direction of Engineer-in-Charge including other incidentals. The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 118.56 | Per cubic metre | 848.1 | ₹1,00,550.74 |
| 2 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 1,800.67 | Per Cubic Metre | 356.6 | ₹6,42,118.92 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 155.15 | Per Cubic Metre | 1,292.6 | ₹2,00,546.89 |
| 4 | Centering and shuttering including strutting, propping etcetera and removal of form work in Foundations, footings, bases for columns including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 539.2 | Per square metre | 226.45 | ₹1,22,101.84 |
| 5 | Centering and shuttering including strutting, propping etcetera and removal of form work in Suspended floors, roofs, landings, balconies and access platform including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 5,383 | Per square metre | 550.95 | ₹29,65,763.85 |
| 6 | Centering and shuttering including strutting, propping etcetera and removal of form work in Lintels, beams, plinth beams, girders, bressumers and cantilevers including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 3,385.47 | Per square metre | 452.05 | ₹15,30,401.71 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work in Stairs, (excluding landings) except spiral stair cases including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 153.67 | Per square metre | 451.6 | ₹69,397.37 |
| 8 | Centering and shuttering including strutting, propping etcetera and removal of form work in Columns, piers, abutments, pillars, posts and struts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 1,195.32 | Per square metre | 481.7 | ₹5,75,785.64 |
| 9 | Centering and shuttering including strutting, propping etcetera and removal of form work in Circular Columns including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 32.5 | Per square metre | 578.05 | ₹18,786.63 |
| 10 | Centering and shuttering including strutting, propping etcetera and removal of form work in edges of slabs and breaks in floors & walls under 20 cm (twenty centimetre wide including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding of GST. | 817.27 | Per Running metre | 156.8 | ₹1,28,147.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.81 MB
FinalSBDCBT.pdf
Tender Documents • 5.78 MB
BOQ_215806.xls
BOQ • 0.95 MB
CBT7870Corrigendum.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .