Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
Closing Date
11 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE PROJECT AMBALA CANTT
GE PROJECT AMBALA CANTT- 133001
CONSTR OF DEFI OTM ACCN OF HQ 2 CORPS UNDER GE PROJECT AMBALA CANTT
2021_MES_486135_2
3030/Q/36/E3
Open Tender
Job Works
Item Rate
30 days
AMBALA CANTT
As per terms and conditions
3 documents required · 3 mandatory
₹0
Exempted
13 Dec 2021
26 Nov 2021
13 Dec 2021
26 Nov 2021
11 Dec 2021
27 Nov 2021
26 Nov 2021 - 26 Nov 2021
60 days
Amount
(a) Drill 150 mm diameter 0 to 20 meter according to IS 1892- 1988 and IS 1892-1979 inncluding transportation charges (up and down for equipment /engineer /mechine etc) – For Guard House (single storey)
(b) Conduct standard penetration test (S.P.T) as per IS 2131-1988. The testing shall be made at every change in strata at the intervals of not more than 1.5 mtr whichever is less. The test may be made at lesser intervals if specified or considered necessary as per 3.31 of IS 2131-1963
(c) Collection of disturbed soil samples at an interval of 1.35 mtr or change of strata.
(d) Collection of undisturbed soil samples at an interval of 1.35 mtr or change of strata.
(e) Conduct of laboratory tests on disturbed/undisturbed soil samples as per project requirement after completion of boring as given below :-
(i) Sieve analysis
(ii) Plasticity index
(iii) Specific gravity
(iv) Water content
(v) Particle size analysis
(vi) Bulk and dry density
(vii) Atterberg limit
(viii) Harmful salt or Organic matter if any
(ix) Direct shear test (if in case of sandy soil)
(x) Unconfined un-drained test (in case of clayey soil)
(xi) Consolidation test (for Saturated soil)
(xii) C values
(xiii) Differential free swell teest in case of expansive soil
(xiv) Unconfined compressive strength of rock (in case of rocky strata)
(xv) Determination of tensile/shear strength of rock (incase of rocky strata)
(xvi) Quality index for rocky starta (in case of rocky starta) (*) In case rock is encountered the boring shall continue upto 1.5 to 2.0 mtr in rock. The firm shall submit the soil investigation report completely covering the following:- (a) Bore log chart showing depth of soil strata. (b) Sub-soil water table
(xvii) Quality index forr rocky strata (in case of rocky strata) (a) Probable maximum and differential setellement . (b) Safe bearing capacity based on sheer and settlement criteria. (c) Recommendations for type and depth of foundation will be submitteed on the format held with GE. (d) Site plan building wise with RL of corners of buildings (e) Bearing capacity and depth of Fdn wrt FFL/Fixed bench mark.
Note:- (a) The location of bldg/bores shall be given by GE. (b) Soil investigation report shall be required as per HQ CE Chandigarh Zone letter No 27947/Pat/13/E2 (D) dt 31 Jul 2019 (copy encl osed with Terms & Conditions) (c) The soil report shall be in 3 parts:- (i) Field operations. (ii) Lab testing and sub soil with soil properties. (iii) Foundation considerations and recommendations for single storey, double storey, triple storey and most economical type of foundation and its depth, most economical soil reclamation technique to improve the bearing capacity and safe bearing capacitty for different type size and depth of foundation will be submitted. (c) 05 copies of the report shall be submitted.
Description all as per item No 01 above but upto 25 mtr depth for Adm Block (triple storey).
Description all as per item No 01 above but upto 30 mtr depth for Edn Bldg (triple storey).
Carrying out Topograpghycal Survey with total electronic station of high precision, making position of each physical features on the ground like buildings, sewer lines, strom water drains, trees, overhead HT/UT electric lines, transformer sub station, OHT, Tube wells, electric and telephone poles, roads, paths, existing permanent/temporaty structures, fencing boundary walls/lines, gates drains etc. preparing the contour plan at suitable intervals, recording reduced levels at suitable intervals, fixing temporaty bench marks (T.M.B) and marking them on ground with paint as required, calculation of areas & other details of surveyed pockets with standard surveying software, submission of 05 Nos coloured drawings with suitable scale alongwith one soft copy on CD shall consist of the followings :- (a) Contour plan showing all existing physical features wiht assumed notthing and casting as required. (b) Layout plan of the area with existing structures. (c) Marking surveyed area and covered area. (d) Reduced lvel to marked at 10 meter intervals. (e) Marking of location of trees coming in the area of 2.5 acres. (f) Marking of existing HT line crossing in the area of 2.5 acres. (f) Submission of drawing (05 Nos) with soft copy on CD.
National Soil Testing and Research Laboratories
stage.html
html • 0.02 MB
finance_547907.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .