Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 CrAccepted-AOC | ₹2.3 Cr | 1 | Accepted-AOC 1st Lowest |
| 2 | 2₹2.3 Cr+₹7.2 L (3.16%)Rejected-AOC | ₹2.3 Cr+₹7.2 L (3.16%) | 2 | Rejected-AOC 2nd lowest |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
25 Jan 2025, 5:00 pmClosed
Construction Engineer Alappuzha
Office of the Construction Engineer Alappuzha 28/747 Sabari Gardens Chandanakavu Alappuzha- 688011
Side Protection Works , Construction of Ramp
2025_KLDC_722851_1
KLDC/ALP/CE/2024-25/05(8)
Open Tender
Civil Works - Others
Item Rate
540 days
Purakkad Panchayath in Alappuzha District.
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,850
Yes
₹1 L
Yes
5 Apr 2025
4 Jan 2025
29 Jan 2025
4 Jan 2025
25 Jan 2025
4 Jan 2025
Amount
App. A -Side Protection Works
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD37462/2024-2025 Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and level cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.2 DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
13.33.1 Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD40744/2024-2025 Supplying and filling at site with contractors own earth suitable for filling brought from<br>out side, levelling the top at site and banking in layers not exceeding 20 cm in depth, breaking clods,<br>watering, ramming and dressing up in embankments for bund,roads, flood banks, marginal banks and guide<br>banks or filling up ground depressions, and as per the direction of officers at the site, etc, complete.
OD40757/2024-2025 Driving down coconut pile to lines and levels through sandy soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 5 numbers per day 6 x 5 =30m . Details for 30 m length
OD40761/2024-2025 Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down , through various strata below bed level including cost conveyence labour charge etc complete
App. B -Construction of Ramp
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD40293/2024-2025 Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and level cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
SEBASTIAN.J.POONEY (BID ID -2076333)
Bidder Name
najmalbabu
SEBASTIAN.J.POONEY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1146536.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .