Tender Value
₹16.4 L
EMD Value
₹32,787
Closing Date
28 Sept 2026, 3:00 pmDue tomorrow
Chief Executive Officer
Chief Executive Officer, Udaipur Municipal Council, Udaipur Gomati Tripura
Construction of park at opposite side of DM Residence at Ward No_10 under Udaipur Municipal Council during the year 2026_27 SH_Boundary fencing with MS Grill and Footpath. Total length 102.00 m.
2026_Urban_77054_1
DNIeT No. 255/DNIeT/UMC/UDP/2026-27
Open Tender
Civil Works
Percentage
180 days
Udaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
₹32,787
Yes
21 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds | 37 | cum | 37 | ₹1,369 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | 24.1 | cum | 1,177.3 | ₹28,372.93 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and Shuttering -All work up to plinth level:
(i) 1:3:6 (1 Cement: 3 fine sand: 6 graded stone aggregate 20 mm nominal size) cum
column
Footpath | 24.1 | cum | 10,570.6 | ₹2,54,751.46 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1:1½:3 (1 cement : 1½ fine sand :3 graded stone aggregate 20 mm nominal column base | 5.55 | cum | 12,073.8 | ₹67,009.59 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
1:12:3 (1 Cement: 1½ fine sand : 3 Railing Column | 3.11 | cum | 13,305.8 | ₹41,354.43 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
1:12:3 (1 Cement: 1½ fine sand: 3 ForPlinth Beam | 6.38 | cum | 13,584.5 | ₹86,601.19 |
| 7 | Reinforcement for R. C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Qnty item no (7+8+9)= 11.57 | 1,352.97 | kg | 103.9 | ₹1,40,573.58 |
| 8 | Centering shuttering including shutterings, propping etc. and removal of form work for:
iii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank - Plinth Beam | 76.5 | sqm | 391 | ₹29,911.5 |
| 8.1 | Columns, pillars,piers, Abutments, posts and Struts with shuttering ply-- Column | 62.16 | sqm | 625.5 | ₹38,881.08 |
| 9 | First class brick work in foundation and plinth including cost of all materials as required complete:In cement mortar 1:4 (
1 cement: 4 fine sand)
For Wall - | 10.64 | cum | 9,845.2 | ₹1,04,752.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_78434.xls
BOQ • 0.29 MB
Park_W_10_DNIeT.pdf
Tender Documents • 2.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .