Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹3,700
Closing Date
29 Aug 2026, 5:00 pm6d left
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Construction of link road to village Puwai G.P. Panol SH Balance work of Providing and laying cement concrete pavement in km 0/610 to 0/650 Under MMSY
2026_PWD_141731_2
5476-81 dt. 20/8/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
12 documents required · 12 mandatory
₹350
₹3,700
22 Aug 2026
22 Aug 2026
30 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
22 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m (one point five metre) in width as well as 10 sqm (ten square metre)on plan including getting out and disposal of excavated earth upto 50 m (fifty metre) and lift upto 1.5 m (one point five metre), as directed by Engineer-in- Charge: all kind of soil .The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 140 | Per square metre | 76.27 | ₹10,677.8 |
| - | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 14 | Per cubic metre | 1,313.56 | ₹18,389.84 |
| - | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement is to one point five coarse sand is to three graded crushed stone aggregate 20 mm (twenty milimetre) nominal sizeas per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 21 | Per cubic metre | 6,016.95 | ₹1,26,355.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_210397.xls
BOQ • 0.31 MB
sbd2.pdf
Tender Documents • 3.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].