Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 CrAccepted-AOC | L1 | Accepted-AOC L1 Letter No. 3385(S)WE Date-16.09.2022 | |
| 2 | L2₹21.8 Cr+₹1.5 Cr (7.16%)Rejected-Finance | L2 | Rejected-Finance L2 Letter No. 3385(S)WE Date-16.09.2022 | |
| 3 | L3₹22.2 Cr+₹1.8 Cr (8.94%)Rejected-Finance GILANPARA DUMKA | DUMKA | JHARKHAND | 814101 | L3 | Rejected-Finance L3 Letter No. 3385(S)WE Date-16.09.2022 | |
| 4 | L4₹22.4 Cr+₹2.1 Cr (10.2%)Rejected-Finance | L4 | Rejected-Finance L4 Letter No. 3385(S)WE Date-16.09.2022 | |
| 5 | L5₹22.8 Cr+₹2.4 Cr (12.0%)Rejected-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | L5 | Rejected-Finance L5 Letter No. 3385(S)WE Date-16.09.2022 |
Tender Value
₹23.3 Cr
EMD Value
₹23.3 L
Closing Date
17 May 2022, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
Reconstruction and Widening/Strengthening of Road from Nonihathwari Bridge-Sitphari (on Sitphari-Sigri-Harko PWD Road) Road (Total Length - 7.550 Km) for the year 2022-23
2022_CECOM_58348_1
RCD/DUMKA/966
Open Tender
Civil Works
Item Rate
243 days
DUMKA
As Per SBD
3 documents required · 3 mandatory
₹10,000
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
₹23.3 L
CE COMM RCD JHARKHAND RANCHI
21 Sept 2022
28 Apr 2022
19 May 2022
28 Apr 2022
17 May 2022
5 May 2022
4 May 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
By Mechanical Means
In area of light jungle
RCD SOR 2.3 (ii)A | 9.5 | hect. | - | - |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.
Dismantling Brick / Tile work
In cement mortar
Deck slab-
RCD SOR 2.4 (ii) B | 21.6 | M3 | - | - |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.
Brick Masonary-Stone
RCD SOR 2.4 (ii) B | 43.2 | M3 | - | - |
| 4 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)
RCD SOR 3.15 | 4,050 | m2 | - | - |
| 5 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)
RCD SOR 2.6 | 535.5 | M3 | - | - |
| 6 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Including Royalty etc@ Rs. 27.48 per cum, cost of watering, rolling & compaction.
RCD SOR 3.6(ii) | 18,544 | m3 | - | - |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Rolling with vibratory roller
RCD SOR 3.17 (i) | 9,272 | m3 | - | - |
| 8 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Rolling with vibratory roller
RCD SOR 3.16 (i) | 32,614 | m3 | - | - |
| 9 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) Rolling with vibratory roller RCD Sor 3.18 (i) | 68,966.57 | m3 | - | - |
| 10 | Construction of granular sub-base by providing course graded Material Grading-I (Table:-400-2), mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
For GSB layer Grading-I
RCD SOR 4.2(i) | 20,061.18 | m3 | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_78577.xls
BOQ Document • 0.27 MB
97153178.pdf
Tender Document • 0.10 MB
SBD.pdf
Tender Document • 1.95 MB
97153180.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .