Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21,887Accepted-AOC | ₹21,887 Quoted ₹21,953 | 1 | Accepted-AOC First lowest |
| 2 | 2₹24,313.82Rejected-AOC | ₹24,313.82 | 2 | Rejected-AOC Second lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Third lowest |
| Sl No | Description | Qty | Unit | Linto Varghese L1 | LORANCE A J L3 | CHRISTIN BAIJU C L L2 |
|---|---|---|---|---|---|---|
| 1.00Felling trees and cutting branches | ||||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,233 ₹2,233 | 2,699 ₹2,699 | 2,693.32 ₹2,693.32 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 11,360 ₹11,360 | 12,527 ₹12,527 | 12,502.16 ₹12,502.16 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 22 | each | 380 ₹8,360 | 415.3 ₹9,136.60 | 414.47 ₹9,118.34 |
Tender Value
₹22,154
Closing Date
22 Aug 2025, 5:00 pmClosed
Assistant Executive Engineer
IIP SUB DIVISION NO 2 Angamaly
IIP-Felling trees and cutting branches of trees in IIP Division No.1 Office compound and IIP Canal land
2025_Irrig_785686_1
2/ET/AEE II/IIP/2025-26
Open Tender
Civil Works - Others
14 days
Angamaly
Please refer Tender documents.
7 documents required · 7 mandatory
₹335
Yes
Yes
23 Jan 2026
13 Aug 2025
25 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
Amount
Felling trees and cutting branches
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
CHRISTIN BAIJU C L (BID ID -2302498)
LORANCE A J (BID ID -2302563)
Bidder Name
LORANCE A J
Linto Varghese
CHRISTIN BAIJU C L
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1291470.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid