Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Annual Maintenance cost of OM and Trishulam for a period of 3 years (Including all repairs and replacement of spare parts etc.with required labor) after defect liability period Note: Monthly 2 visits are mandatory along with whenever required for proper working of OM without any interruption. | SMART LED SOLUTIONS | 1 | ₹7.5 L |
| 2 | Scarping and repainting 2 coats with OM and Trishulam along with existing structure with Grade-I enamel paints (Colors to be approved by Dept.) | SMART LED SOLUTIONS | 1 | ₹2.5 L |
| 3 | Supply, Installation, Testing and Commissioning with required no. of double sided PCB 12V, 9mm single color open LEDs(98 lm/W) with 3mm thickness Mono Acrylic Molding signage with 3mm thickness ACP panel sheet and required no. of 12V,30A SMPS with rain proof enclosure for existing OM and Trishulam at Ghatroad with required scaffolding and labor etc. and also providing 8 Nos of 100 W LED Flood lights with suitable supports for OM Board | SMART LED SOLUTIONS | 1 | ₹12.6 L |
Tender Value
Refer Docs
Closing Date
29 Aug 2022, 10:30 amClosed
Sri Durga Malleswara Swamy Devasthanam
PROVIDING LED LIGHTING AND PAINTING FOR OM BOARD
537461
11 /ENG/2022-23
OPEN - NCB
Goods
Andhra Pradesh
13 Nov 2022
29 Aug 2022
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .