Tender Value
₹8.3 L
EMD Value
₹8,300
Closing Date
14 Oct 2026, 6:00 pmClosed
CHIEF OFFICER, BAVLA NAGARPALIKA,BAVLA
TREE PLANTATION WORK AT TP-2 FP-121 AT BAVLA NAGARPALIKA AREA AT BAVLA UNDER URBAN FOREST SCHEME
349825
01 OF 2026 – 2027
Open
Miscellaneous Works
Fixed-rate
Ahmedabad
3 documents required · 3 mandatory
₹1,062
Chief Officer, Bavla Nagarpalika, Bavla
₹8,300
28 Sept 2026
28 Sept 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
Name Of Work : TREE PLANTATION WORK AT TP-2 FP-121 AT BAVLA NAGARPALIKA AREA AT
BAVLA UNDER URBAN FOREST SCHEME
Schedule-B1 :TREE PLANTATION WORK AT TP-2 FP-121 AT BAVLA NAGARPALIKA AREA AT
BAVLA UNDER URBAN FOREST SCHEME
Sr. No. Description Quantity Unit Rate Amount
1 Providing and stacking of Azadirachta indica ( 70.00 EACH 60.60
Neem ) height 120-130cm in polybag size 25 cm
as per direction of the officer-in-charge.
2 Providing and stacking of Erythrina indica height 70.00 EACH 58.58
150-165 cm. in polybag size 25 cm as per
direction of the officer-in-charge.
3 Providing and stacking of Delonix regia 70.00 EACH 65.65
(Gulmohar) of height 150-165 cm. in poly bag of
size 25 cm as per direction of the officer-in-
4 Providing and stacking of Ficus religiosa (Peepal) 70.00 EACH 72.93
height 150-165 cm. in poly bag size 30 cm as per
direction of the officer-in-charge.
5 Providing and stacking of Nauclea cadamba 70.00 EACH 72.93
(Kadam) height 150-165 cm. in poly bag size
cm as per direction of the officer-in-charge.
6 Digging holes in ordinary soil and refilling the 350.00 EACH 48.33
same with the excavated earth mixed with
manure or sludge in the ratio of 2:1 by volume (2
parts of stacked volume of earth after reduction
by 20% : 1 part of stacked volume of manure after
reduction by 8%) flooding with water, dressing
including removal of rubbish and surplus earth, if
any, with all leads and lifts (cost of manure, sludge
or extra good earth if needed to be paid for
separately)-2.14.3 Holes 60 cm dia, and 60 cm
7 Complete maintenance of trees, jobs like making 350.00 EACH 1111.00
of basin at regular interval, application of
fertilizer etc, (excluding the cost of material which
shall be supplied by the department and other T &
P material/articles shall be provided by the
contractor) as per direction of officer in charge
2.42.1 Trees for 250 no/(up to 4 & up to 3 year
Slow & Fast growing group), Including Providing
and wartering of irrigation water through water
tanker of Horticulture features i.e.lawn, tree,
shrubs, hedge/edge, ground cover etc. at the site
of work. Water tanker having 5000 lit. capacity
with one labour for watering i/c cost of water,
filling of tanker, wartering at site with all leads
and lifts as per direction of officer-in-charge.
8 Providing and fixing Tree guard made of MS Tree 350.00 EACH 707.00
guard Dia 18 inch, M.S. Ring Patti size 20 x 3 mm -
3 Nos, Weldmesh Jali - Size :- 60 x 60 mm (Hole) -
14 Guage - Length :-55 Inch, M.S. Angle - Angle
Size :-19 x 2 mm - Length :- 6 Feet - 3 Nos, Total
Weight 7 to 7.5 Kg, Total Height 6 Feet, Color :-
GREEN Logo Painting with labeled "VANIKARAN",
" NAGARPALIKA - NAME PLATE ", "Number of
Tree Guard", " SWACHCHHA BHARAT MISSION
Logo" using different colour for background with
priming coat, border and Round/Square border
on Tree Guard number. The work includes the
cost of all materials, labour, transportation,
loading, unloading, erection with carefully, all
taxes etc. completed. The work was carried out as
per specification and directed by Muni. Engineer-
9 Supplying and stacking of good earth at site 66.54 Cu.Mt 811.79
including royalty and carriage upto 5 km lead
complete (earth measured in stacks will be
reduced by 20% for payment).
10 Excavation for foundation upto 1.5 m depth 21.60 Cu.Mt 117.08
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil
11 Providing and fixing 1.20 Metre high fencing with 250.00 Rmt 389.26
2.0 Metre long M.S. Angle posts 40mm x 40 mm x6
mm and oil painting 3 coats fixed at 2.5 Mt,C/c.
with five Horizontan lines and two diagonals of
galvanised steel barbed wire weighting 9.38 Kg.
per 100 Metre, strained and fixed to posts with
G.I,staples including fixing the postsin ground
with 0.5 M x 0.5.M x 0.5 M. block in C.C1:5:10 etc
Total ( B1 ) :-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document-349825.pdf
Schedual B Tender Document-349825.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .