| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.4 LAccepted-AOC | ₹7.4 L | 1 | Accepted-AOC Awarded |
| 2 | 2₹7.5 LRejected-AOC | ₹7.5 L | 2 | Rejected-AOC Not Awarded |
| 3 | 3₹7.5 LRejected-AOC | ₹7.5 L | 3 | Rejected-AOC Not Awarded |
Tender Value
₹7.9 L
EMD Value
₹8,000
Closing Date
30 Mar 2020, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Replacement of Gaskets of 40MVA Transformer - I and II (Technical Associates make) alongwith other associated Works at 132KV Sub Station Bareilly-II (Bali Pur) under E.T.D. Bareilly
2020_UPTCL_455230_1
Short Term E-Tender No. 92 / W / ETC(B) / 2019-20
Open Tender
Electrical Works
30 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹8,000
15 Sept 2020
23 Mar 2020
31 Mar 2020
23 Mar 2020
30 Mar 2020
23 Mar 2020
23 Mar 2020 - 30 Mar 2020
Amount
Replacement of Gaskets of 40MVA Transformer - I & II (Technical Associates make) alongwith other associated Works at 132KV Sub Station Bareilly-II (Bali Pur), with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine with Operator, Normal & Special T&Ps etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per Details below : (1) Safe Carriage of 20 KL Capacity Oil Storage Tank from Designated Primary Sub Station in Bareilly (Distance Approx. 40 Km) to 132KV Sub Station Bareilly-II (Bali Pur) including Shifting & Loading of Oil Storage Tank at Designated Primary Sub Station and Unloading & Shifting of same in Switchyard at 132KV Sub Station Bareilly-II (Bali Pur).
Removal of Jumpers of HV & LV side Bushings of the 40MVA Transformer - I & II one by one. The Scope of Work Involves Removal of Jumpers, Bushing Clamps, Opening of Earthing of Neutral Bushings with Flexible Copper Strips of each Transformer. (1 Job for per Transformer)
Complete Draining of the Transformer Oil from the above 40MVA Transformer - I & II one by one into Oil Tanker. (1 Job for per Transformer)
Dismantling of 3 No. HV Bushings, 3 No. LV Bushings, 2 No. Neutral Bushings (HV & LV), Turrets, Radiators, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fens etc. of above 40 MVA Transformer - I & II one by one. (1 Job per Transformer)
Providing & Replacement of old Gaskets from different Parts (Top Cover, Bushings, Turrets Radiators, Pipe Lines, Inspection Window, Conservator M.O.G., PRV, Buchholz Relay etc.) of the above 40MVA Transformer - I & II one by one. The Scope of Work involves Removal of old Gaskets, Cleaning of Surfaces, Providing & Fabrication of Gaskets of Appropriate Sizes out of Gaskets of Thickness 12 / 10 / 8 / 6 mm of Konica / Torborze / Nu-cork make and Fixing of Gaskets at Proper Place with Adhesive alongwith other associated Works. (1 Job per Transformer)
Erection of the above 40MVA Transformer - I & II by Installation of 3 No. HV Bushings, 3 No. LV Bushings, 2 No. Neutral Bushings (HV & LV), Turrets, Radiators, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its Original Place of the each Transformer one by one. (1 Job per Transformer)
Centrifuging of the Transformer Oil Filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved. Filling of Centrifuged Transformer Oil into Main Tank and Radiators of the above 40MVA Transformer - I & II one by one from the Oil Tanker, then Centrifuging & Circulation of the Transformer Oil in Transformer with the Help of Centrifuging Machine, Un-Interrupted till the Desired BDV Values of the Transformer Oil and IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance, BDV etc. every 2 Hours. (19500 Lit. in each Transformer)
Complete Spray Painting of the above 40MVA Transformer - I & II one by one including its Main Tank, Main / OLTC Conservator Tanks, Radiators, Headers, associated Pipe Lines, Support Structures, Marshalling Box etc. by 1st Coat of Red Oxide Primer and then Applying 2nd Coats of Smoke Grey Colour 1st Quality Synthetic Enamel Paint of Asian / Berger / Nerolac make at the Gap of 48 Hrs. Interval each with the help of Spray Painting Machine after due Rubbing & Cleaning of the Rusted Surfaces, Cleaning & Washing of Dust / Dirt / Oil Deposits from the Surfaces. (1 Job per Transformer)
Safe Carriage of 20KL Capacity Oil Storage Tank from 132KV Sub Station Bareilly-II (Bali Pur) to Designated Primary Sub Station in Bareilly (Distance Approx. 40Km) including Shifting & Loading of Oil Storage Tank at 132KV Sub Station Bali Pur and Unloading, Shifting & Placing of same in Switchyard / Storage Place at the Designated Primary Sub Station.
M/s S.S. Refregeration
M/S SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf