Karnataka Urban Infrastructure Development and Finance Corporation Limited
Ramya S R
Construction/Upgradation of Sewerage system for Humnabad town under National Green Tribunal Environmental Compensation Fund Swacch Bharath Mission (Urban)-2.0 fund on DBOT model
KUIDFC/2025-26/WS/WORK_INDENT59/CALL-2
KUIDFC/2025-26/WS/WORK_INDENT59/CALL-2
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
KUIDFC Managing Director Office Bengaluru
9 documents required · 9 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /STP project/water supply project/Irrigation Projects /combined water supply & sewerage project/combined water supply or Sewerage project with Road/combined water supply or Sewerage project with Layout works/combined water supply or Sewerage project with Building works of value not less than Rs 1154.00Lakh.
Executed in any one year of the last five years (2019-20 to 2023-24) the following minimum quantities of works:(1)Earthwork excavation in all kinds of strata / embankment / Sub grade by mechanical / manual means20243 cum(2)PCC/RCC concrete1149 cum(3) Reinforcement Steel 23 MT(4) RCC NP3/ DI/ u-PVC/ Stone ware/ MS pipes/DWC/GSW/HDPE pipes of diameter in the range of 150 mm & above diameter 9.20 km
The tenderer or his identified sub-contractor should possess required valid electrical license and should have executed similar electrical works totaling to Rs. 21 Lakh in any one year
The tenderer or his identified subcontractor should possess experience in Construction of NEBR/equivalent typeSTP or more with minimum 6.40 MLD Capacity in any one year.
Availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished
Liquid assets and/or availability of credit facilities of not less than Rs857.00Lakh(credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the prescribed format
Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs 5190.00 Lakh
₹7,500
₹26 L
21 May 2025
21 May 2025
12 Jun 2025
28 May 2025
28 May 2025
Construction/Upgradation of Sewerage system for Humnabad town under National Green Tribunal Environmental Compensation Fund Swacch Bharath Mission (Urban)-2.0 fund on DBOT model
PART A: Network, Machine holes, House Service Connections and construction of Lab cum Office room: a) Excavation in all kind of strata at varying depths for pipelines, road restoration and Machine hol...
PART B: Construction of wet well, Rising main and Electromechanical works: a) Excavation in all kind of strata at varying depths for wet well and pipe lines b) Construction new RCC wet well of dia 6.0...
PART C: Electrical works: a) Supply, errection and commissioning of 4.5km 11KVA express feeder line for proposed wet well of zone-2. b) Supply, errection and commissioning of 63KVA transformers for pr...
PART D: Rehabilitation of existing 6 MLD WSP type STP:
a) Rehabilitation of Anerobic Ponds, Polishing Pond and other allied works for existing 6 MLD WSP type STP b) Supply, installation and commission...
PART E: Ugradation of existing 6.0MLD WSP type STP to 8.0 MLD NEBR type STP: Upgradation of existing 6 MLD WSP type STP to Natural Endogenous Bio Reactor (NEBR) type STP of 8.0 MLD capacity, and with ...
Part-F: Operation & Maintenance of 1 new and 3 existing Wet wells: a) 1st Year Operation & Maintenance of 1 new & 3 existing Wet wells for 5 years excluding power charges including Deflect Liability P...
Part-F: Operation & Maintenance of 1 new and 3 existing Wet wells: b) 2nd Year Operation & Maintenance of 1 new & 3 existing Wet wells for 5 years excluding power charges.Note: 1) All works and items ...
Part-F: Operation & Maintenance of 1 new and 3 existing Wet wells: c) 3rd Year Operation & Maintenance of 1 new & 3 existing Wet wells for 5 years excluding power charges.Note: 1) All works and items ...
Part-F: Operation & Maintenance of 1 new and 3 existing Wet wells: d) 4th Year Operation & Maintenance of 1 new & 3 existing Wet wells for 5 years excluding power charges.Note: 1) All works and items ...
Part-F: Operation & Maintenance of 1 new and 3 existing Wet wells: e) 5th Year Operation & Maintenance of 1 new & 3 existing Wet wells for 5 years excluding power charges. Note: 1) All works and items...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DTS_Humnabad.docx
Tender Document • 0.46 MB
Humnabad_SECTION-7_Part-2_Technical_Specifications.docx
Technical Information / Worksheet • 0.90 MB
HUMNABADH NETWORK FINAL-A0.pdf
Design Document • 0.86 MB
WETWELL GA FINAL.pdf
Design Document • 0.29 MB
HUMNABAD KEYPLAN FINAL-A1.pdf
Design Document • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .