Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.5 Cr+₹1.2 Cr (26.9%)Admitted-Finance TNT NO 8 WARD 10 BC PLOT NO 12 13 GANDHIDAM KUCHCHH KACHCHH GUJARAT 370201 | KACHCHH | GUJARAT | 370201 | ₹5.5 Cr+₹1.2 Cr (26.9%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical emd not submitted and MSME Certificate is not of relevant category |
| 4 | Rejected-Technical | - | - | Rejected-Technical emd not submitted and MSME Certificate is not of relevant category |
| 5 | Rejected-Technical | - | - | Rejected-Technical emd not submitted and MSME Certificate is not of relevant category |
| Sl No | Description | Qty | Unit | SSR Marine Services Pvt. Ltd. L2 | ELECTROTECH L1 |
|---|---|---|---|---|---|
| 1.00 | Steel Plate replacement ( Frame O TO 70 )
(i) Bottom Plate
(ii) Side Plate
(iii) Aft & front plate
(iv) Main deck plate
(v) Super Structure deck (1 & 2) plate
(vi) Machinery space(vii) Monkey deck complete plate
1. All plate to be checked for thickness via ultrasonic gauging technique and same to be degutted, cropped and replaced, if thickness reduced by more than 10%. NOTE :- Approximate 25 Ton ±05 Ton of steel plates may be required during dry dock repair for replacement of defective and pitted steel plates of F/BOP Sagar. | 1 | Job | 62,50,000 ₹73,75,000 | 8,64,000 ₹10,19,520 Lowest |
| 2.00 | Main Engine
(i) Port & STBD side main engine
As on date Run Hrs ( Port & STBD) main engine
(a) Port : 8574.15 Run Hrs
(b) STBD : 8355.50 Run Hrs. 1. Port & STBD side both Maine engine complete overhauling
2. Radiators required to be replaced.
3. Radiator opening door required to be modification as per requirement at the time of dry dock.
4. All safety device of both main engine replaced with new one.
5. RPM indicator, over speed controller to be checked and required to be servicing. | 1 | Job | 50,00,000 ₹59,00,000 Lowest | 54,00,000 ₹63,72,000 |
| 3.00 | PROPULSION SYSTEM (HRP SYSTEM ) ( 2 NOS )
a) 360 degree rotation
b) HRP gear box repair
c) Electric panel wiring of wheel house.
d) Hydraulic pump of HRP System.
1. Complete servicing of HRP unit with connected equipment’s and operation trial to be conducted after completion of repair.
2. Electronic panel (PCB) alongside main engine to be checked for its functionality and servicing to be done after filling of Hydraulic and Gear Oil.
3. All seal bearing to be change.
4. All rubber pressurized hose to be changed.
5. Clutch unit to be serviced, thrust plate and liners/ O Ring required to be replaced with new.
6. Cardan shaft differential unit to be change with new cross joints. | 1 | Job | 35,00,000 ₹41,30,000 Lowest | 36,00,000 ₹42,48,000 |
| 4.00 | DIESEL GENERATOR SET ( PORT & STBD)
(a) Diesel engine ( Port & STBD)
(b) Main switch board & circuit breaker.
(c) Servicing of alternator.
1. Complete overhauling of both DG set.
2. Main switch board & circuit breaker to be replaced.
3. Servicing of alternator (i.e power output, Frequency, voltage of alternator to be checked after servicing).
4. Run Hrs covered port side 33050.10 Hrs and STBD Side 3470.15 Hrs.
5. Exhaust pipe heat insulation to be change. | 1 | Job | 20,00,000 ₹23,60,000 Lowest | 41,40,000 ₹48,85,200 |
| 5.00 | AIR CONDITION SYSTEM (AC PLANT & AIR HANDLING UNIT )
15 Nos Split ACs already existed in F/BOP required to be repaired/serviced.
1. Suitable arrangement is required to be mounted in F/BOP SP Sagar for drain of split AC water directly in river/sea.
2. During previously dry dock of other F/BOP it seen that water entered in cabin through cooling pipe line. Hence proper arrangement is required to be carried out during dry dock to avoid such type of water leakage wherever split ACs are installed.
3. 15 Nos split ac already installed at SP Sagar , required to be servicing of all 15 Nos fitted spilt AC.
4. Refilling of gas in all AC.
5. Servicing of compressor, etc of all components of spilit AC system.
6. Outer unit foundation plate of all 15 Nos fitted spilt AC required to be replaced with new foundation plate due rusting of all foundation plate . | 1 | Job | 9,00,000 ₹10,62,000 | 4,77,000 ₹5,62,860 Lowest |
| 6.00 | MAST REPAIR WORK :
(a)Main mast bottom supporting members, brackets, arm repair.
(b) Antenna’s base(Radar, GPS, Navigation light , flag post , search light )
(c)Electrical conduits.
All navigational antennas’ foundation to be repair, provision/mechanism for foldable mast (manual and hydraulic/ automatic) to be installed. Further electrical cable conduit to be provided.
All navigation lights, search lights to checked for its functionality and replaced with new one as required. | 1 | Job | 6,70,000 ₹7,90,600 Lowest | 14,40,000 ₹16,99,200 |
| 7.00 | NAVIGATIONAL EQUIPMENTS (WHEEL HOUSE CONSOLE PANEL/FITTINGS) :-All control panel with complete accessories to be renewed with following Equpts
a)Deck light control panel
(b) Heat detection panel/Sensor
(c) Window wiper, motor & Control Panel
(d) ECO sounder with display
(e)HRP panel with ignition switch of both main engine.
(f) GPS( Make –Koden) display with accessory and antenna.
(g)Navigation light with control panel.
(h)Radar ( Make-Koden) with display & antenna
(i) Magnetic compass (Raytheon)
(j) Barometer(John Lilley & Gillie)
(k) Clinometer(xii) Ship Flags (xiii) General Alarm
l) Wheel house HRP console to be –shift to front side. | 1 | Job | 23,00,000 ₹27,14,000 | 11,70,000 ₹13,80,600 Lowest |
| 8.00 | Wind Screen(Clear View) Window and Inspection Glasses(Glass fittings & rubber packing)
a) Windows of all cabins
b) Wheel house wind screen c) Water tight Hatches.
d) Scuttles and doors
All Hatches, Scuttles, Windows, doors windows to be replaced.
All windows of vessel required to be modified as open type outer side.
Additionally 01 window of wheel house at Port & STBD side required to be modified as open type.
Rubber finder of all Hatches, scuttles, window doors to be changed. | 1 | Job | 14,00,000 ₹16,52,000 | 10,80,000 ₹12,74,400 Lowest |
| 9.00 | VALVE AND PIPE LINES.
a) Fresh water line
b) Sewage water line
c) Fuel Line
d) All sea chest/sea water line
e) Bilge system valve
f) Overhead tank lines
g) Fire fighting lines
h) Air vent pipe, head & sounding pipe
i) Scuppers and discharge line
j) Galley drain pipe.
1. All pipes & valves installed on board vessels to be serviced.
2. After servicing the all pipe lines & valves pressure to be checked /tested for proper operation. | 1 | Job | 5,00,000 ₹5,90,000 Lowest | 7,20,000 ₹8,49,600 |
| 10.00 | PUMP AND MOTORS
All motors and pumps to be serviced and made operational..
1.Petrol pump body (outer) rusted required to be renewed.
2.All wiper rotary motor required to be replaced ( wiper not working).
The following Pumps/motors fitted/available in FBOPs are required to be serviced.
a) Small Petrol Pump-01 No
b)Diesel transfer Pump-01 No
c)Fresh water pump-02 No
d)Fire/Bilge pump-02 Nos
e)Sewage pump-02 Nos
f)DD fire pump-01 No
g)Engine room exhaust blower- 02 Nos
h)Toilet/bathroom Exhaust pump-04 Nos
j)Davit Motor-04 Nos
k)Fuel transfer pump-01 No
l)Wiper Rotary Motor-04 Nos
m)Anchor Motors- 03 Nos
n)One Tap from fresh water delivery pipe at main deck required to be provided to flush out the OBMs.External Auxiliary diesel transfer pump required | 1 | Job | 6,50,000 ₹7,67,000 | 3,87,000 ₹4,56,660 Lowest |
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
24 Apr 2023, 5:00 pmClosed
OFFICER COMMANDING,WW RAJARHAT
OC Water Wing Rajarhat FTRHQ SB Border Security Force Plot No.IIE(I) Action area II New Town Kolkata 7001611
3rd Dry Dock repair and maintenance of Floating BOP SP Sagar
2023_BSF_744733_1
WW/Proc /DDR/Tender /2023/2293-96 10TH Mar 2023
Open Tender
Marine Works
Works
180 days
Hasnabd Kolkata (West Bengal)
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹0
₹8 L
Yes
HQ, Water Wing, BSF, Rajarhat
25 May 2023
13 Mar 2023
26 Apr 2023
13 Mar 2023
24 Apr 2023
12 Apr 2023
13 Mar 2023 - 30 Mar 2023
28 Mar 2023
Amount
Steel Plate replacement ( Frame O TO 70 ) (i) Bottom Plate (ii) Side Plate (iii) Aft & front plate (iv) Main deck plate (v) Super Structure deck (1 & 2) plate (vi) Machinery space(vii) Monkey deck complete plate 1. All plate to be checked for thickness via ultrasonic gauging technique and same to be degutted, cropped and replaced, if thickness reduced by more than 10%. NOTE :- Approximate 25 Ton ±05 Ton of steel plates may be required during dry dock repair for replacement of defective and pitted steel plates of F/BOP Sagar.
Main Engine (i) Port & STBD side main engine As on date Run Hrs ( Port & STBD) main engine (a) Port : 8574.15 Run Hrs (b) STBD : 8355.50 Run Hrs. 1. Port & STBD side both Maine engine complete overhauling 2. Radiators required to be replaced. 3. Radiator opening door required to be modification as per requirement at the time of dry dock. 4. All safety device of both main engine replaced with new one. 5. RPM indicator, over speed controller to be checked and required to be servicing.
PROPULSION SYSTEM (HRP SYSTEM ) ( 2 NOS ) a) 360 degree rotation b) HRP gear box repair c) Electric panel wiring of wheel house. d) Hydraulic pump of HRP System. 1. Complete servicing of HRP unit with connected equipment’s and operation trial to be conducted after completion of repair. 2. Electronic panel (PCB) alongside main engine to be checked for its functionality and servicing to be done after filling of Hydraulic and Gear Oil. 3. All seal bearing to be change. 4. All rubber pressurized hose to be changed. 5. Clutch unit to be serviced, thrust plate and liners/ O Ring required to be replaced with new. 6. Cardan shaft differential unit to be change with new cross joints.
DIESEL GENERATOR SET ( PORT & STBD) (a) Diesel engine ( Port & STBD) (b) Main switch board & circuit breaker. (c) Servicing of alternator. 1. Complete overhauling of both DG set. 2. Main switch board & circuit breaker to be replaced. 3. Servicing of alternator (i.e power output, Frequency, voltage of alternator to be checked after servicing). 4. Run Hrs covered port side 33050.10 Hrs and STBD Side 3470.15 Hrs. 5. Exhaust pipe heat insulation to be change.
AIR CONDITION SYSTEM (AC PLANT & AIR HANDLING UNIT ) 15 Nos Split ACs already existed in F/BOP required to be repaired/serviced. 1. Suitable arrangement is required to be mounted in F/BOP SP Sagar for drain of split AC water directly in river/sea. 2. During previously dry dock of other F/BOP it seen that water entered in cabin through cooling pipe line. Hence proper arrangement is required to be carried out during dry dock to avoid such type of water leakage wherever split ACs are installed. 3. 15 Nos split ac already installed at SP Sagar , required to be servicing of all 15 Nos fitted spilt AC. 4. Refilling of gas in all AC. 5. Servicing of compressor, etc of all components of spilit AC system. 6. Outer unit foundation plate of all 15 Nos fitted spilt AC required to be replaced with new foundation plate due rusting of all foundation plate .
MAST REPAIR WORK : (a)Main mast bottom supporting members, brackets, arm repair. (b) Antenna’s base(Radar, GPS, Navigation light , flag post , search light ) (c)Electrical conduits. All navigational antennas’ foundation to be repair, provision/mechanism for foldable mast (manual and hydraulic/ automatic) to be installed. Further electrical cable conduit to be provided. All navigation lights, search lights to checked for its functionality and replaced with new one as required.
NAVIGATIONAL EQUIPMENTS (WHEEL HOUSE CONSOLE PANEL/FITTINGS) :-All control panel with complete accessories to be renewed with following Equpts a)Deck light control panel (b) Heat detection panel/Sensor (c) Window wiper, motor & Control Panel (d) ECO sounder with display (e)HRP panel with ignition switch of both main engine. (f) GPS( Make –Koden) display with accessory and antenna. (g)Navigation light with control panel. (h)Radar ( Make-Koden) with display & antenna (i) Magnetic compass (Raytheon) (j) Barometer(John Lilley & Gillie) (k) Clinometer(xii) Ship Flags (xiii) General Alarm l) Wheel house HRP console to be –shift to front side.
Wind Screen(Clear View) Window and Inspection Glasses(Glass fittings & rubber packing) a) Windows of all cabins b) Wheel house wind screen c) Water tight Hatches. d) Scuttles and doors All Hatches, Scuttles, Windows, doors windows to be replaced. All windows of vessel required to be modified as open type outer side. Additionally 01 window of wheel house at Port & STBD side required to be modified as open type. Rubber finder of all Hatches, scuttles, window doors to be changed.
VALVE AND PIPE LINES. a) Fresh water line b) Sewage water line c) Fuel Line d) All sea chest/sea water line e) Bilge system valve f) Overhead tank lines g) Fire fighting lines h) Air vent pipe, head & sounding pipe i) Scuppers and discharge line j) Galley drain pipe. 1. All pipes & valves installed on board vessels to be serviced. 2. After servicing the all pipe lines & valves pressure to be checked /tested for proper operation.
PUMP AND MOTORS All motors and pumps to be serviced and made operational.. 1.Petrol pump body (outer) rusted required to be renewed. 2.All wiper rotary motor required to be replaced ( wiper not working). The following Pumps/motors fitted/available in FBOPs are required to be serviced. a) Small Petrol Pump-01 No b)Diesel transfer Pump-01 No c)Fresh water pump-02 No d)Fire/Bilge pump-02 Nos e)Sewage pump-02 Nos f)DD fire pump-01 No g)Engine room exhaust blower- 02 Nos h)Toilet/bathroom Exhaust pump-04 Nos j)Davit Motor-04 Nos k)Fuel transfer pump-01 No l)Wiper Rotary Motor-04 Nos m)Anchor Motors- 03 Nos n)One Tap from fresh water delivery pipe at main deck required to be provided to flush out the OBMs.External Auxiliary diesel transfer pump required
OTHER ON BOARD INTERNAL FITMENTS (AWING FITTING, BOLLARD & CLEAT, ANCHOR WINCH, CHAIN CABLE ) a) Anchor fitting, (ii) b) Bollard & Cleats c) Anchor winch and chain/cable/rollers/dead man roller. d) Anchor and anchor rope e) Break lining of winch f) Anchors stowage frame. 1. Complete servicing of davits ( 4 Nos ) along with fitments (planetary gear, davit arm, electromagnetic brake, foundation, limit switches etc), 2. Load bearing test during trials. 3. FPB stowage cradles neoprene rubber covering to be replaced (if more than 10 % cracks or pitted). 4. Existing davit lifting capacity to be increased by providing 5 HP Motor (1440 RPM) as per New Floating BOPs. 5. Strength capacity of existing devit rope to be provided. ( 04 nos). 6. Dram required to be replaced ( 04 nos)
DAVITS AND BOAT CRADLES Davit wire Fast patrol boat stowage cradles 1. Complete servicing of davits ( 4 Nos ) along with fitments (planetary gear, davit arm, electromagnetic brake, foundation, limit switches etc), 2. Load bearing test during trials. 3. FPB stowage cradles neoprene rubber covering to be replaced (if more than 10 % cracks or pitted). 4. Davit lifing capacity has to be increased as per weight of new model FPB.
PAINTING WORK a) Under water surface of hull. b) All tanks(internal /external) c) External hull and deck d) All machinery and equipment, fitments. 1.De-rusting and sand blasting as per marine practice and painting of all cabins, engines, decks mounting, fitments, equipment ( pumps, motors, on board external fitments) with proper marking and color coding. 2. Heat Proof paints must be use for all engines.
BATTERIES (Emergency Motive, Main engine & DG Set) a) Main engine b) DG Set c) Emergency light 1. All batteries on board vessel to be replaced. 2. Battery box to be provided. Details of existing batteries : (a) Main Engine – 04 Nos. (12V x 19 Plate) 150 AHC (b) DG Set – 04 Nos. (12V x 25 Plate) 180 AHC (c) Emergency Battery – 02 Nos. 180 AHC each (d) Comn Set up – 02 Nos. (12V x 13 Plate) 88 AHC Note : Tubular batteries required to be provided for emergency light.
BATHROOM & CABIN/GALLEY a) Dining halls b) Living cabins c) Basin & provision store d) Deep freezer Room e) Misc store f) Kote 1. Floor tiles to be renewed in all bathroom . 2. Side wall paneling / fitting / linoleum sheet are to be replaced in Buson & Prov stores. 3. Mirror in all bathroom and living cabin to be provided. 4. All cabin furniture to be provided. 5. Jet system or hand shower to be provided in each bath room. 6. Necessary arrangement / modification be made in main door of deep freezer. FLOORS:- I) VIP-1= 6’.9’’x 4’.1’’ , II) VIP-2 = 5’.7’’ x 4’.10’’ , III) Cap Cabin = 6’.10’’x 4’.1’’ , iv) SOs Cabin = 10’.7’’x 4’.9’’ v) Jawan Bathroom =13’.9’’x 14’.9’’, vi) Deep freezer room = 13’.9’’x 8’ vii) Galley floor = 13’.9’’x 8’
LIFE SAVING APPLIANCES/EQUIPMENT’S a) All life buoy/life line b) Life Jackets with attachment c) Buoyant apparatus d) Ship distress signal e) Life rafts. All life saving appliances / equipment’s as per chart plan available on board vessel to be provided. (a) Buoyant Apparatus (12 Person capacity) – 02 Nos. (b) Life Buoys – 02 Nos. (c) Lifebuoy with lines – 02 Nos. (d) Lifebuoy with light & smoke signals – 02 Nos. (e) Lifebuoy with self ignition lights – 02 Nos. (f) Life Jackets (SOLAS grade) foam type – 40 Nos. (g) Distress Signals – 01 Set. (h) Line throwing apparatus – 01 No. (j) Boat Hooks – 02 Nos. (k) First Aid Kit Boxes with medicines (Deluxe Size) – 01 No. (l) Life line – 02 Nos. (m) Stretcher (Neil Robertson with lifting harness) – 01 No.
INTERCOM SYSTEM PA system from wheel house to all cabins and deck required to be replaced. Note :- Audio visual telephonic unit to be replaced and UHF -05 nos ( walkie torquay MC-200 model) required to be provided.
FIRE FIGHTING APPLIANCE/RESCUE SIGNAL APPLIANCE. a) Portable fire extinguisher b) Fire hoses, fire hydrant All firefighting appliances as per chart plan available on board vessel to be provided as per recommendation of IRS. (a) As per chart Fire extinguishers to be provided. (b) Canvas fire hoses 05 Nos. 65 mm (dia), Length – 15 Mtrs with Jet spray nozzle required to be provided. (c) Fibre fire boxes – 05 Nos required to be provided. (d ) Fire hydrant – 05 Nos, required to be serviced
Miscellaneous ( External fitments) a) Embarkation ladder (02 Nos.) to be replaced. b) Various securing clamps to be replaced. c) Smoke & heat detector ( 04 Nos.) be made operational. d) MMG protection guard –( 05 Nos.) to be examined, repaired if pitted and painted. e) 20 Nos. canvas cover (water proof) for all motors and electrical equipment’s exposed to open environment. To be stitched after measurement f) Table, Sofa, Chairs of Officer, SOs & Jawan dining hall Officer Dining :-Sofa – 03 Nos., Chair – 10 Nos. Table – 02 Nos. (Size : 4 Ft. X 2 Ft) - To be provided new. (i) Table top of all dining hall-To be polished. (ii) Bed cover, and bunk cushion-38 Nos-To be replaced. (iii) Washing machine - 01 No. To be replaced (iv) (Capacity -8 Kg) (semi Automatic) To be replaced. (v) Refrigerator double door as specified size - 03 Nos. (Capacity : 250 Ltrs – 01 No. & 90 Ltrs – 02 Nos.)-To be replaced. (vi) Deep freezer – 02 Nos. (Capacity -50 Ltr) -To be replaced (vii) Bathroom geyser - 06 Nos-To be replaced (Capacity – 05 Ltrs – 04 Nos. and 15 Ltrs – 02 Nos.) (ix) Guardrail Stanchions & rope-To be renewed with Stainless Steel chain and Pipe (x) All faucet and taps Tom be renewed ( Steel) (xi) Semi rotating double acting (Aft ) hand pump - To be replaced. a) Ventilation system :-(Machinery Room, Galley, Provision Store, Sanitary Spaces, Magazine, Kote, Boson Stores and all peak tank-To be provided b) All types of fasteners ( i.e. nut and bolts)- To be replaced with stainless steel surrounding the outside of vessel. Note: - Tyres with mild steel chain must to be replaced surrounding the vessel. c) Water Dispenser - 02 Nos. (Capacity -20 Ltr) (Hot & cool) -To be provided d) Marine wall clock – 08 Nos -Required to be installed in each cabins / stores of vessel e) Revolving chair – 01 No -To be replaced . (Machinery Room, Galley, Provision Store, Sanitary Spaces, Magazine, Kote, Boson Stores and all peak tank - To be provided.
Misc store Following are required to be provided for Misc store. 1).Iron Rack - 01 No, 2). Line throwing apparatus with 4 rocket and 4 line. – 01 set 3).Ship distress signal parachute – 01 set, 4). Blanket STD – 37 Nos 5). Blanket for VIP – 02 Nos, 6). Plastic chair with cushion padded – 04 Nos 7). Water Filter (Milton ) – 02 Nos, 8). Life jackets – 22 Nos 9). Life Buoy – 08 Nos
Kote & MAG:1. Iron Rack – 01 No 2. 2. Dust bin – 02 Nos
Electrical system a) All switch board /line wiring b) Deck Light c) Fans d) Hot plate assembly e) Speed down transformer f) Shore supply g) Launch light system 1.All switch board and electrical line wiring to be replaced. 2.DC bulbs and sockets with steel cover to be provided. 3.Small wall fan – 30 Nos to be provided.. 4. Big wall fan – 10 Nos to be provided. 5. Hot plate assembly to be renewed. 6. Speed down transformer to be renewed. 7. Shore supply connection to be installed. 8. Exhaust fan / blower to be renewed.9. Bed lamp & Bunk light – 37 Nos 10. Electrical Alarm System- 01 No 11. Table lamp – 03 Nos Note:- 1. All tube light be replaced by LED lighting system and to be well supported by step down transformer. 2. At least one emergency LED light must be installed at each cabin / galley / stores / dining hall/ wheel house etc. 3. Fog light LED for deck must be installed at Aft & front (head) side -04 Nos.. 4. All exhaust fans and blower required to be provided. 5. CFL Light with cover – 30 Nos required to be provide for vessel.. Tube light with cover for Galley – 02 Nos
Docking piloting charges Inspection charges ( Including IRS) Docking ,un-docking, Cost of fuel, docking, undocking, and piloting / towing from border up to repaired dockyard and vice-versa, including inspection charges of IRS Class society.(Responsibility of the firm)
Anticipation work a) Post dry dock repair trial b) Water tightness. c) Air pressure testing of tanks d) Sacrificial anodes( under water ) e) Rudder propeller f) Mud box and strainer (i) After completion of dry dock all equipment’s, machinery, tanks and fitment will be checked with requisite certificate wherever applicable. d) Ship name and national flag of both side corroded, wasted to be required renewed. Note : Approximate 25 Ton + 05 Ton of steel plates may be required during dry dock repair for replacement of defective and pitted steel plates of F/BOP Sagar
SSR Marine Services Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .