| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹2.4 L+₹30,419.53 (14.3%)Rejected-AOC CHITTILANCHERY MELARCOD GRAMA PANCHAYATH | ALAPPUZHA | KERALA | 686534 | L2 | Rejected-AOC 2nd |
Tender Value
₹3.0 L
EMD Value
₹7,405
Closing Date
24 Dec 2022, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, LBC Sub Division, Malampuzha Project, Tharekkad, Palakkad Head Post Office Pin 678001
GENERAL ES ANNUAL ACTION PLAN 2022 23 MP LBC Rectification works to sluice offtake from Ch.14.080 of Chulannur canal General Civil Work 1
2022_Irrig_540517_1
IRR/PI/TR/4163/2022_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
300 days
Chulanur
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
₹7,405
Yes
3 Feb 2023
17 Dec 2022
29 Dec 2022
17 Dec 2022
24 Dec 2022
17 Dec 2022
17 Dec 2022 - 23 Dec 2022
Amount
CADA Encasing and Lining
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
SIVAPRASAD S
Bidder Name
C MUKUNDAN
SIVAPRASAD S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787481.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .